Availability
Timing Chain and Gear Set, Double Roller, Heavy Duty, GM, Set
Part Number: SUM-G6773
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Pro LS 2618 Forged Piston, 4.080 bore, 1.326 C.H., 12cc Dish, Std. Stroke, Full Float Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.2 LS3 L92 LS9, Set of 8
Part Number: SUM-326943408012
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Timing Pointer, Billet Aluminum, Black, Adjustable, 6.25 in. Balancer, Chevy, Small Block, Each
Part Number: SUM-163625
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Pushrods, Chromoly, Heat-Treated, 5/16 in. Diameter, 7.850 in. Length, Universal, Set of 16
Part Number: SUM-1457850
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Stage 5.5 Pro LS Twin-Turbo Cam. 251/255 Dur., 117 + 6, .625/.615 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck, LS1 LS2 LS6 LS3 LQ4 LQ9, Each
Part Number: SUM-8726R1
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Pulley Spacer, Crankshaft, 4-bolt, Aluminum, Natural, 0.950 in. Thickness, Ford, Each
Part Number: SUM-329707
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Engine Re-Ring, 4.030 in. Bore, .010 in. Rod, .010 in. Main, Chevy, Kit
Part Number: SUM-RRKIT1-311
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Alternator Bracket, Steel, Black, Header Mount, Short Water Pump, Use with SUM-G4051B, Chevy, Small Block, Each
Part Number: SUM-G4050B
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Cam and Lifter kit, Pro SBC Stage 2 Hyd. Flat-Tappet 4/7 Firing Order Swap, 212/218 Dur., 111 LSA + 2 Adv, .428/.450 1.5 Ratio, 1000-5550 Range
Part Number: SUM-K1201
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Bellhousing Dowel Pins, .500 in. Diameter, Ford, Mopar, Lincoln, Mercury, Pair
Part Number: SUM-192002
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Water Pump Pulley, V-Belt, 2-Groove, Steel, Chrome, Chevy, Big Block, Short Pump, Each
Part Number: SUM-329815
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Summit Precision High-Tensile Tri-Metal Alloy COATED Racing Main Bearings, BBF 460 Standard Clearance, 3/4 Upper and Lower groove, set
Part Number: SUM-1039HCS
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Oil Pickup, Press Fit, Street/Strip Pan Style, 8.250 in. Pan Depth, Chevy, V8, Big Block, 396-454, Each
Part Number: SUM-G36031
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Valve Covers, Stock Height, Steel, Chrome, Plain, Chrysler, Big Block, Pair
Part Number: SUM-G3331
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Piston Rings, Plasma-Moly, 4.155 in. Bore, 1/16 in., 1/16 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SUM-134-CM553430
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Oil Pump and Pickup Assembly, High-Volume, Chevy, Big Block, Kit
Part Number: SES-3-90-08-005
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Pulley Set, Serpentine, 25% Underdrive, Steel, Ford, Lincoln, Mercury, 4.6L, Kit
Part Number: SUM-C2512
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Pro LS 2618 Forged Pistons. 3.820 bore, 1.299 C.H., 7cc dish, Std. Stroke, .6.125 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-2999273820-7
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Valve Cover Hold-Down Tabs, Chrome, Set of 8
Part Number: SUM-G3433
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Summit 4340 Forged Crankshaft, SBF Windsor, 3.000 in Stroke, 28 oz. Balancer, Narrowed Rod Bearings, 1.375 Pilot Bearing, Designed for 5.090 in. Rod
Part Number: SUM-SBF3023000E
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Water Pump Pulley Shims, Steel, Zinc Plated, Set of 3
Part Number: SUM-310121
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Cam and Lifter kit, Pro SBC Stage 5 Hyd. Flat-Tappet 4/7 Firing Order Swap, 236/242 Dur., 108 LSA + 2 Adv, .495/.510 1.5 Ratio, 2200-6400 Range
Part Number: SUM-K1204
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Rocker Arm, LS, Roller Fulcrum, 1.7 Ratio, Ductile Iron, Pedestal Mount, Chevy, 6.2L LS, Each
Part Number: SME-143023
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Alternator Bracket, Aluminum, Chrome, Cylinder Head Mount, Ford, Small Block, Kit
Part Number: SUM-420104
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Oil Pan, Clear Zinc, Pan, Baffled, Pickup, High-Volume Pump, Chevy, Small Block, Kit
Part Number: SES-3-60-08-530
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.