Availability
Piston Rings, Moly, 4.060 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SUM-133-M139-60
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
SBF 302 Windsor Cast crank, 3.400 in. stroke, 5.400 rod, Nitride Hardened, External 28 0z. Balance, Req. Narrowed Rod bearings
Part Number: SUM-SBF3023400C
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Valve Cover Breather w/PCV Valve, Push-In, Oval, 1.25 in. Hole, 5/16 in. Hose Barb, Aluminum, Finned, Black Powdercoat, Each
Part Number: SUM-G3390B
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Pulley Set, Serpentine, 25 Percent Underdrive, Only Fits April 2000-04, Earlier Models use SUM-C2510, Set of 3
Part Number: SUM-C2511
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Combo, Cloyes, Timing Chain and Gear Set, Timing Cover, Gaskets, Bolts, RTV, Chevy, Small Block, Kit
Part Number: CMB-08-0017
Cannot be shipped Internationally
Cannot be shipped Internationally
Pistons, Hypereutectic, Flat, 4.020 in. Bore, Chevy, Set of 8
Part Number: SUM-17351C-20
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Cam and Lifter kit, Pro SBC Stage 6 Hyd. Flat-Tappet 4/7 Firing Order Swap, 242/248 Dur., 108 LSA + 2 Adv, .510/.518 1.5 Ratio, 2600-6600 Range
Part Number: SUM-K1205
Not Yet Reviewed
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Piston Rings, Pro GPX Gas Ported, 4.075 in. Bore, File Fit, Gas Nitrided, 1.2mm, 1.2mm, 3.0mm Thickness, V8, Set
Part Number: SUM-GP407512
Not Yet Reviewed
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Forged Pro pistons for SB Chevy 400 Long Rod, 4.155 bore, 1.125 C.H., 3.75 in. stroke, 6 in. rod, 12cc Dish, 10.5@64cc, 10.2@67cc, 9.8@72cc.
Part Number: SUM-SBC400030L
Not Yet Reviewed
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Timing Cover, 2-Piece, Cast Aluminum, Black Powdercoated, Without Cam Sensor, Chevy, LS, V8, Each
Part Number: SUM-G6322
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Alternator Bracket, Aluminum, Chrome, Water Pump Mount, Long Water Pump, Chevy, Big Block, Kit
Part Number: SUM-420102
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Crankshaft Pulley, V-Belt, 1-Groove, 6.6 in., Aluminum, Natural, Chevy, Small Block, Short Pump, Each
Part Number: SUM-G3961
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Oil Pump Driveshaft, Chevy, Big Block, Each
Part Number: SUM-121161
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Rocker Arms, Roller Tip, Self-Aligning, Cast Steel, 3/8 in. Stud Mount, 1.5 Ratio, Polylocks, Chevy, Small Block, Set of 16
Part Number: SUM-141700PL
Not Yet Reviewed
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Filler Cap, Weld On, Black Anodized, 1-1/2 in., Aluminum Bung, Kit
Part Number: SUM-730003
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Timing Tape, 8 in. Diameter Balancer, Chevy, Big/Small Block, Each
Part Number: SUM-162591
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Oil Pump and Pickup Assembly, High-Volume, Chevy, Small Block, Kit
Part Number: SES-3-60-08-035
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Timing Cover, 1-Piece, Aluminum, Natural, Ford, Small Block, Each
Part Number: SES-5-60-04-201
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Timing Chain and Gear Set, Double Roller, Billet Steel Sprockets, Chevy, 7.4L, Set
Part Number: SUM-G6617R-B
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Camshaft, Hydraulic Flat Tappet, Advertised Duration 280/280, Lift .443/.443, Chevy, Small Block, Each
Part Number: SUM-1069
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Pushrods, Chromoly, Heat-Treated, 5/16 in. Diameter, 8.050 in. Length, Universal, Set of 16
Part Number: SUM-1458050
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Valve Covers, Tall Height, Cast Aluminum, Red Powdercoated, Plain, Chevy, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0L, Pair
Part Number: SUM-440363
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Summit HDR Pushrods Big Block Chevy 3/8 8.700 Length, Premium One-Piece .135 Wall 4130 Seamless Chromoly, 210 degree ends, Heat-Treated, Set of 8
Part Number: SUM-14938700
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Cylinder Head Studs, 12-Point, 8740 Chromoly, Black, 2004 and Later, Chevy, LS, Gen III/IV, 1/2" x 13 threads base, 1/2" - 20 top, Kit
Part Number: SUM-900508
Not Yet Reviewed
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Camshaft Kit, Pro LS, Hydraulic Roller Tappet, Advertised Duration 271/287, Lift .600/.575, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8715-1
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.