Availability
Valve Covers, Tall, Perimeter Bolt Mounting, Steel, Black Powdercoated, Chevy, Big Block, Pair
Part Number: SUM-G3312B
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
PRO BBC H.R. 3 Hydraulic Roller Cam, 4/7 Swap, 218/226 Duration @ .050, 110 LSA + 6 Adv. , .595/.590 with 1.7 ratio, .630/.625 with 1.8, 2500-6000
Part Number: SUM-1253
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Main Bearings, Bi-Metal, Silicon Aluminum, 0.010 in. Crankshaft Undersize, GM Gen III/IV LS, Set of 5
Part Number: SUM-172310
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Water Pump Pulley, V-Belt, 2-Groove, 5/8 Pilot, Steel, Chrome, Chevy, Small Block, Short Pump, Each
Part Number: SUM-G3951
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Combo, Oil Pan, Black Zinc, Pickup, Std-Volume Pump, Shaft, Tray, Scraper, Gaskets, Chevy, 7.4L/454, Kit
Part Number: SUM-PANKIT13
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Valve Cover Set, LS Race, Lightweight Die Cast Aluminum, With Coil Mounts, Silver Powder Coat, Pair
Part Number: SUM-440825
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Forged Pro pistons BB Chevy 540, 4.500 bore, 1.270 C.H., 4.25 in. stroke, 6.385 in. rod, 8cc open/closed ch. Dome 10.6@110cc, 10.2@114cc, 10:1@119cc.
Part Number: SUM-BBC540STD
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, SBC 350 Main Standard Clearance, Half-Upper groove, set
Part Number: SUM-909HS
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Gen. 3 Hemi CNC Cylinder head, 5.7/6.1L, 212cc Int. runner, 69cc CNC combustion chamber, 2.125 Int./1.650 exh..600 Lift, 2.88 CSA,Dr..side,
Part Number: SUM-HEMI2125761D
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Gen. 3 Hemi CNC Cylinder head, 5.7/6.1L, 212cc Int. runner, 69cc CNC combustion chamber, 2.125 Int./1.650 exh..600 Lift, 2.88 CSA,Pass.side,
Part Number: SUM-HEMI2125761P
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
SUM-8723 Level 1 Cam kit, Dual Springs, St. Ret., Stage 4 Pro LS Twin-Turbo Cam. 240/242 Dur., 116+4, .625/.605 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0
Part Number: SUM-8723-1-DLSTL
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Muscle Car Camshaft, 300HP350, Hydraulic Flat Tappet, 1,500-4,000 RPM Range, Adv.Duration 258 int./269 exh., Lift 194 int./202 exh., Chevy, Each
Part Number: SUM-1120
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Valve Covers, Stock Height, Cast Aluminum, Polished, Plain, Chevy, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0L, Pair
Part Number: SUM-440366
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Valve Covers, Tall Height, Cast Aluminum, Polished, Plain, Chevy, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0L, Pair
Part Number: SUM-440361
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Summit HDR Pushrods 5/16 7.000 Length, Premium One-Piece .105 Wall 4130 Seamless Chromoly 210 degree ends, Heat-Treated, Set of 16
Part Number: SUM-14957000
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Piston Rings, Ductile Plasma Iron Top, Ductile second, Std. Tension oil, File Fit for 4.280 in. bore 1.5mm, 1.5mm, 3.0mm, Set
Part Number: SUM-1362M851035
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Guideplates, Flat, 5/16 in. Pushrod Size, Chevy, Small Block, Set of 8
Part Number: SUM-G6450
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Engine Oil Dipstick, LS Cast Retro Pan, Billet Aluminum Handle, Chrome, Steel Tube with Braided Dipstick,Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-122241
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Harmonic Balancer, SFI, External Balance, Steel, Clearcoated, Chrysler, Dodge, Plymouth, 318-360, Each
Part Number: SUM-C4278
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Cam and Lifter kit, Pro SBC Stage 3 Hyd. Flat-Tappet 4/7 Firing Order Swap, 218/228 Dur., 109 LSA + 2 Adv, .465/.473 1.5 Ratio, 1500-5800 Range
Part Number: SUM-K1202
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 280/280, Lift .443/.443, Chevy, Small Block, Kit
Part Number: SUM-K00042
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
SBF 302 Windsor Cast crank, 3.400 in. stroke, 5.400 rod, Nitride Hardened, External 28 0z. Balance, Req. Narrowed Rod bearings
Part Number: SUM-SBF3023400C
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Piston Rings, Pro GPX Gas Ported, 4.125 in. Bore, File Fit, Gas Nitrided, 0.043 in., 0.043 in., 3.0mm Thickness, V8, Set
Part Number: SUM-GP412543
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Pro LS 2618 Forged Pistons. 3.785 bore, 1.326 C.H., 2cc dome, Std. Stroke, .Gen.4 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-326943785-2F
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Pro SBC Stage 5 Hyd. Flat-Tappet 4/7 Firing Order Swap Cam, 236/242 Dur., 108 LSA + 2 Adv, .495/.510 1.5 Ratio, .495/.528 1.6 Ratio, 2200-6400 Range
Part Number: SUM-1204
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.