Availability
Oil Filter Relocation Kit, Dual Filter, 72 in. Hose Length, Kit
Part Number: SUM-G4986-1
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Piston Rings, Pro GPX Gas Ported, 4.030 in. Bore, File Fit, Gas Nitrided, 1/16 in., 1/16 in., 3/16 in. Thickness, V8, Set
Part Number: SUM-GP403016
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Oil Pump Pickup, High Volume, Press Fit, 8.250 in. Pan Depth, 0.625 in. Tube Diameter, Chevy, Small Block, Each
Part Number: SUM-G3502PHV
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Pro LS 2618 Forged Piston, 3.903 bore, 1.110 C.H., 5cc dish, 4.000in. Stroke, 6.125 Full-float Rod, NA/Boost/Nitrous, Coated, 5.7L LS1 LS6, Set of 8
Part Number: SUM-1109273903-5
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Camshaft, Hydraulic Flat Tappet, Advertised Duration 284/284, Lift .512/.512, Ford, Small Block, Each
Part Number: SUM-1791
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Pushrods, Chromoly, Heat-Treated, 5/16 in. Diameter, 7.550 in. Length, Mopar, Small Block, Set of 16
Part Number: SUM-1457550
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Valve Covers, Circle Track, Tall Height with Baffled BreatherTubes, Centerbolt Mounting, Steel, Black Powdercoated Finish, Chevy, 5.0L, 5.7L, Pair
Part Number: SUM-440855B
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Pro LS 2618 Forged Piston, 4.065 bore, 1.110 C.H., 21cc dish, 4.000in. Stroke, 6.125 Rod, NA/Boost/Nitrous, Cathedral/Rect., 6.2 LS3 L92 LS9, Set of 8
Part Number: SUM-110927406521
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Oil Cooler Bypass Block-Off Plate, Billet Aluminum, Natural, Ford, Godzilla, 7.3L, Each
Part Number: SUM-120200
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 280/292, Lift .509/.509, Ford, 351C, 351M, 400
Part Number: SUM-K5201
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Pro LS 4340 Rotating Assembly, 415 Cid., 4.065 bore, 4.000 stroke, 24X, 6.125 rod, 21cc dish, 9.9:1 @ 65cc, 9.5:1 @ 70cc, File-Fit Rings, H Bearings
Part Number: SUM-R244006521
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
PRO BBC H.R. 6 Hydraulic Roller Cam, 4/7 Swap, 242/252 Duration @ .050, 113 LSA + 10 Adv. , .620/.620 with 1.7 ratio, .656/.656 with 1.8, 3700-6600
Part Number: SUM-1256
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Pro LS 4340 Rotating Assembly, 364 Cid., 3.810 bore, 4.000 stroke, 24X, 6.125 rod, 12cc dish, 10:2 @ 61cc, 9.7:1 @ 65cc, File-Fit Rings, H Bearings
Part Number: SUM-R244081012
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Rocker Arm Stud Girdle, Aluminum, 3/8 in.-24 Thread, Chevy, Small Block, Kit
Part Number: SUM-141001
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Pro LS 4340 Rotating Assembly, 377 Cid., 4.070 bore, 3.622 stroke, 24X, 6.125 rod,12cc dish, 9.9:1 @ 65cc, 9.4:1 @ 70cc, File-Fit Rings, H Bearings
Part Number: SUM-R2436L07012
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Cam and Lifter kit, Camshaft, Stage 2, LS Truck Swap Cam, High lift version, 218/227 112+2, .600/.600 Lift, 3-bolt, LS1 LS2 LS6 LS3 LQ4 LY6 LQ9 Each
Part Number: SUM-K8720R1
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Camshaft, Hydraulic Flat Tappet, Advertised Duration 289/300, Lift .473/.497, AMC, V8, Each
Part Number: SUM-8600
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Rocker Arms, Roller Tip, Self-Aligning, Cast Steel, 3/8 in. Stud Mount, 1.5 Ratio, Polylocks, Chevy, Small Block, Set of 16
Part Number: SUM-141700PL
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Pro LS CT1, 234/248 Duration, 113.5 LSA + 3.5 Adv, .550I/.550E Lift, 3-Bolt, Compatible with SUM-174002 LS6 Springs. 5.3, 5.7, 6.0, 6.2, 7.0
Part Number: SUM-8735R1
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Pro LS Rotating Assembly, 365 Cid., 4.005 bore, 3.622 stroke, 24X, 6.125 rod, 2cc Flat Top, 10.8:1 @ 65cc, 10.2:1 @ 70cc, File-Fit rings, H Bearings
Part Number: SUM-R2436L0052
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Summit HDR LS1 LS2 LS3 LQ9 11/32 7.400 Length, Premium One-Piece .120 Wall 4130 Seamless Chromoly Pushrods, 210 degree ends Heat-Treated, Set of 16
Part Number: SUM-14917400
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Forged Pro pistons BB Chevy 540, 4.5 bore, 1.120 C.H., 4.25 in. stroke, 6.535 rod, 8cc Dome 10.6@110cc, 10.2@114cc, 10:1@119cc.
Part Number: SUM-BBC540STD8L
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Main Bolts, Side Bolts Only, 6-bolt Style, Hex, Chevy, LS, Set of 10
Part Number: SUM-910229-3
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Lifters, Hydraulic Roller, Link Bar, 0.903 in. Outside Diameter, 2.685 in. Seat Height, Dodge, Plymouth, Chrysler, Set of 16
Part Number: SUM-HT225-16
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, SBC 350 Main Standard Clearance, Half-Upper groove, set
Part Number: SUM-909HS
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.