Availability
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, SBC/LS 2.100 pin, .837 width, Standard Clearance, set
Part Number: SUM-663HS
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Adapter, Oil Filter, Bypass, Bolt-On, Aluminum, Natural, 13/16-16 in. Thread, SBC, BBC, Each
Part Number: SUM-120115
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Cam and Lifters, Mechanical Flat Tappet, Advertised Duration 282/286, Lift .531/.542, Chevy, Small Block, Kit
Part Number: SUM-CT108K
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Summit HDR Pushrods, Chevy BBC, 3/8 in., 8.280 Intake Length, 9.250 in. Exhaust Length, .135 wall Premium One-Piece, Heat-Treated, Set of 16
Part Number: SUM-149382809250
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Lifter Valley Plate, Aluminum, Black Anodized, GM, LS, Each
Part Number: SUM-240055B
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Crankshaft Pulley, V-Belt, 3-Groove, 7.74 in., Steel, Black, Chevy, Small Block, Long Pump, Each
Part Number: SUM-G3958B
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Gen. V BB Chevy Forged Steel Crank, 4.250 stroke, One Piece Rear Seal, Req's Narrowed Rod Bearings, Lightened Rod Journals, Nitride, 6.385 in. Rod
Part Number: SUM-BBC425063852
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Stage 4 Pro LS Twin-Turbo Cam. 240/242 Dur., 116+4, .625/.605 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck, LS1 LS2 LS6 LS3 LS7 LQ4 LQ9, Each
Part Number: SUM-8723R1
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Valve Cover, Direct OEM Replacement, Stock Height, Cast Aluminum, Black Finish, Includes Bolts, Grommets,Gaskets, Left/Drivers Side, GM LS, Each
Part Number: SUM-440550B
Estimated Ship Date: Nov 24, 2025 if ordered today
Estimated Ship Date: Nov 24, 2025 if ordered today
Piston Rings, Gas Nitrided Steel Top, Martensitic Ductile Napier second, Std. Tension oil, File fit for 4.080 in. bore, 1.2mm, 1.2mm, 3.0mm, Set
Part Number: SUM-136SN9045080
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Camshaft, 1-Bolt, Hydraulic Flat Tappet, Advertised Duration 298/303, Lift .466/.488, Mopar, Big Block, Each
Part Number: SUM-6401
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
PRO BBC H.R. 5 Hydraulic Roller Cam, 4/7 Swap, 232/242 Duration @ .050, 111 LSA + 6 Adv. , .620/.620 with 1.7 ratio, .656/.656 with 1.8, 3000-6500
Part Number: SUM-1255
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Summit HDR Pushrods 5/16 8.000 Length, Premium One-Piece .105 Wall 4130 Seamless Chromoly 210 degree ends Heat-Treated, Set of 16
Part Number: SUM-14958000
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 298/303, Lift .466/.488, Chrysler, Big Block, Kit
Part Number: SUM-K6401
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Engine Oil Dipstick with Tube, Timing Cover Entry, Steel, Chrome, Ford, Small Block Windsor, Each
Part Number: SUM-G3867
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Timing Cover, 1-Piece, Steel, Black Powdercoated, Chevy, Small Block, Kit
Part Number: SUM-G3200B-K
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Rocker Arm Trunnion Upgrade Kit, Trunnion Upgrade, Chevy, LS, Set of 16
Part Number: SME-143002
Estimated Ship Date: Jan 30, 2026 if ordered today
Estimated Ship Date: Jan 30, 2026 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Main Bearings, 1/2 Groove, .010 in. Crankshaft Undersize, Bi Metal, Silicon Aluminum, Chevy, Small Block, Set of 5
Part Number: SUM-172010
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 278/288, Lift .421/.444, Chrysler, Small Block
Part Number: SUM-K6900
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Valve Covers, Tall, Die-cast, Aluminum, Black, 347 C.I. Stroker, Ford, Small Block, Pair
Part Number: SUM-440408
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Timing Cover, 2-Piece, Aluminum, Polished, Chevy, Small Block, Kit
Part Number: SUM-G6312
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Engine Oil Dipstick with Tube, Passenger Side, Steel, Chrome, Chevy, Each
Part Number: SUM-G3864
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Pro LS 2618 Forged Pistons. 3.780 bore, 1.299 C.H., 2cc dome, Std. Stroke, .6.125 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-2999273780-2
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Pro LS 2618 Forged Piston, 4.005 bore, 1.110 C.H., 8cc dish, 4.000in. Stroke, 6.125 Rod, NA/Boost/Nitrous, Cathedral/Rect., 6.0 LY6 LQ4 LQ9, Set of 8
Part Number: SUM-1109274005-8
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 278/288, Lift .421/.444, Pontiac, V8, Kit
Part Number: SUM-K2800
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.