Availability
Pro LS 2618 Forged Piston, 4.005 bore, 1.326 C.H., 2cc Flat, Std. Stroke, .945 pin Press or Float, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LQ4 LQ9,
Part Number: SUM-3269454005-2
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Pro LS 4340 Forged Steel Crank, 3.622 Stroke, 58X Reluctor, Lightened Rod Journals and Gun-drilled Mains, Std. 6-bolt Flange, Internal balanced, LS3
Part Number: SUM-180LS362258X
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Camshaft, Hydraulic Flat Tappet, Advertised Duration 278/288, Lift .421/.444, Pontiac, V8, Each
Part Number: SUM-2800
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Valve Locks, Stamped Steel, 7 Degree, 8mm Stem, 1-Groove, Commonly used with LS Gen III/IV and Gen. V LT stock retainers, Set of 32
Part Number: SME-143009
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
PRO BBC H.R. 4 Hydraulic Roller Cam, 4/7 Swap, 224/232 Duration @ .050, 110 LSA + 5 Adv. , .620/.620 with 1.7 ratio, .656/.656 with 1.8, 2800-6300
Part Number: SUM-1254
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Engine Oil Dipstick with Tube, Passenger Side, Steel, Chrome, Chevy, Each
Part Number: SUM-G3864
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Engine Block, Pro LS, Bare, Cast Iron, 6-bolt Main Bolt Style, 9.240 in. Std Deck, 4 Head Bolt, 4.065 in. Bore, GenIII/IV LS Chevrolet, 6.0/6.2, Each
Part Number: SUM-150215
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Pro LS Piston and Rod Kit, 330 Cid., 3.810 bore, Standard 3.622 stroke, 6.125 rod, 2cc dome, 11:1 @ 61cc, 10.4:1 @ 65cc, File-Fit Rings
Part Number: SUM-PR36L8102
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Pro LS 4340 Piston and Rod Kit, 402 Cid., 4.000 bore, 4.000 stroke, 6.125 rod, 8cc dish, 11:1 @ 65cc, 10.4:1 @ 70cc, File-Fit Rings
Part Number: SUM-PR400008
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Cam and Lifter kit, Stage 4 Pro LS Cam 238/246 113+3, .625/.605 Lift, Maximum power version, 3-bolt 5.3, 5.7, 6.0, 6.2, 7.0, LS1,2,3,6,7,9 LSA LSX
Part Number: SUM-K8709R1
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Rocker Arm Bolt, Steel, Black Oxide, 8mm x 1.25, LS1/LS6 Style Rocker Arms, Set of 8
Part Number: SME-143005
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Cam Retaining Plate, For Use with Factory Roller Block and Camshaft, Chevy, Big, Small Block, Each
Part Number: SUM-150130
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, Chevy LS, .001 Extra Clearance, Racing 270 Deg. Oil groove, set
Part Number: SUM-7298HXS
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Pro LS 2618 Forged Pistons. 3.810 bore, 1.326 C.H., 7cc dish, Std. Stroke, .Gen.4 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-326943810-7F
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Forged Pro BB Chevy 4340 Forged Steel I-Beam Connecting Rods, 6.135 in. Length, .990 Floating Pin, 8740 PSI 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-BBC6135I
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Oil Pan, Steel, Gold Zinc, 7 qt., Chevy, Small Block, Each
Part Number: SUM-G36010
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
PRO BBC H.R. 3 Hydraulic Roller Cam, 4/7 Swap, 218/226 Duration @ .050, 110 LSA + 6 Adv. , .595/.590 with 1.7 ratio, .630/.625 with 1.8, 2500-6000
Part Number: SUM-1253
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Gen. 4 BB Chevy Forged Steel Crank, 4.250 stroke, Two Piece Rear Seal, Req's Narrowed Rod Bearings, Lightened holes, Nitride, 6.385 in. Rod
Part Number: SUM-BBC425063851
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Camshaft, Hydraulic Flat Tappet, Advertised Duration 282/292, Lift .486/.512, Ford, Big Block, Each
Part Number: SUM-3500
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Bellhousing Dowel Pins, .500 in. Diameter, .007 in. Offset, Ford, Mopar, Lincoln, Mercury, Pair
Part Number: SUM-192004
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Timing Cover, 2-Piece, Steel, Chrome Plated, Chevy, Small Block, Each
Part Number: SUM-G3230
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Adjustment Rod Assembly, Universal, 4.50 in. to 5.75 in. Length, 3/8 in. Rod End, Steel, Cadmium Plated, Each
Part Number: SUM-420301
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Valve Covers, 3.5 in. Tall, Die-cast, Aluminum, Orange, Bowtie, Chevy, Small Block, Pair
Part Number: SUM-440401
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Pushrods, Chromoly, Heat-Treated, 5/16 in. Diameter, 7.500 in. Length, Universal, Set of 16
Part Number: SUM-1457500
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Pro LS 2618 Forged Piston, 3.810 bore, 1.110 C.H., 12cc dish, 4.000in. Stroke, 6.125 Rod, NA/Boost/Nitrous,Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-110927381012
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.