Filters
Pro SBC Hyd. Roller Cam, Turbo Stage 2, 224/226 Duration, 114 LSA + 3 Adv., .550/.520 Lift with 1.5 Ratio, .587/.555 1.6 Ratio, 3000-7000 Rpm Range
Part Number: SUM-8806
Not Yet Reviewed
Estimated Ship Date: Monday 5/12/2025
Estimated Ship Date: Monday 5/12/2025
Rocker Arm Trunnion Upgrade Kit, Bronze Bushing, Dodge, Cummins, 5.9L, 24 Valve, Kit
Part Number: SUM-141570
Estimated Ship Date: Monday 5/12/2025
Estimated Ship Date: Monday 5/12/2025
Timing Chain and Gear Set, True Roller, Single Roller, Billet Steel Sprockets, 1-Bolt, 4X Cam, Chevy, LS3, 6.2L, Set
Part Number: SUM-G6641
Estimated Ship Date: Monday 5/12/2025
Estimated Ship Date: Monday 5/12/2025
Summit HDR LS1 LS2 LS3 LQ9 Pushrods 5/16 7.425 Length, Premium One-Piece .105 Wall 4130 Seamless Chromoly 210 degree ends, Heat-Treated, Set of 16
Part Number: SUM-14957425
Not Yet Reviewed
Estimated Ship Date: Jun 9, 2025 if ordered today
Estimated Ship Date: Jun 9, 2025 if ordered today
Summit HDR Pushrods 5/16 6.500 Length, Premium One-Piece .105 Wall 4130 Seamless Chromoly 210 degree ends, Heat-Treated, Set of 16
Part Number: SUM-14956500
Estimated Ship Date: Jun 9, 2025 if ordered today
Estimated Ship Date: Jun 9, 2025 if ordered today
Timing Gear, Adjustable, Billet Steel, 3-Bolt, 1X, Single Row, 0.005 in. Line Hone, Chevy LS, Each
Part Number: SUM-G6643-1X-005
Not Yet Reviewed
Estimated Ship Date: Monday 5/12/2025
Estimated Ship Date: Monday 5/12/2025
Timing Gear, Adjustable, Billet Steel, 3-Bolt, 1X, Single Row, 0.010 in. Line Hone, Chevy LS, Each
Part Number: SUM-G6643-1X-010
Not Yet Reviewed
Estimated Ship Date: Monday 5/12/2025
Estimated Ship Date: Monday 5/12/2025
Rocker Arms, Full Roller, 1.5/1.6 Ratio, Aluminum, Gold Anodized, 3/8 in. Stud, Chevy, Small Block, Set of 16
Part Number: SUM-G6850G
Not Yet Reviewed
Estimated Ship Date: Monday 5/12/2025
Estimated Ship Date: Monday 5/12/2025
Rocker Arms, Gold Series, Full Roller, 1.6 Ratio, Aluminum, Gold Anodized, Chevy, Small Block, Set of 16
Part Number: SUM-G6821G
Not Yet Reviewed
Estimated Ship Date: Jun 30, 2025 if ordered today
Estimated Ship Date: Jun 30, 2025 if ordered today
Need It Sooner?
We recommend these similar substitute parts:
Estimated Ship Date: Monday 5/12/2025
Rocker Arms, Gold Series, Full Roller, 1.6 Ratio, Aluminum, Gold Anodized, Chevy, Small Block, Set of 16
Part Number: SUM-G6820G
Not Yet Reviewed
Estimated Ship Date: Jul 3, 2025 if ordered today
Estimated Ship Date: Jul 3, 2025 if ordered today
Need It Sooner?
We recommend these similar substitute parts:
Estimated Ship Date: Monday 5/12/2025
Rocker Arms, Gold Series, Full Roller, 1.5 Ratio, Aluminum, Gold Anodized, Chevy, Small Block, Set of 16
Part Number: SUM-G6810G
Estimated Ship Date: Jul 3, 2025 if ordered today
Estimated Ship Date: Jul 3, 2025 if ordered today
Need It Sooner?
We recommend these similar substitute parts:
Estimated Ship Date: Monday 5/12/2025
Rocker Arms, Roller Bearing Trunnion, LS-7, Assembled, Steel, 1.8 Ratio, Exhaust, Rectangle Port, Chevy, Each
Part Number: SUM-141555E-1
Not Yet Reviewed
Estimated Ship Date: Monday 5/12/2025
Estimated Ship Date: Monday 5/12/2025
Pro Hemi Stage 2 Hydraulic Roller Cam, 212/218 Duration @.050, 113.5 LSA + 1.5 adv, .600/.585 Lift, 2700-6700 Range, Each
Part Number: SUM-5712
Not Yet Reviewed
Estimated Ship Date: Monday 5/12/2025
Estimated Ship Date: Monday 5/12/2025
Pro Hemi Supercharged 4 Hydraulic Roller Cam, 224/238 Duration @.050, 118 LSA + 5 adv, .625/.625 Lift, 3100-7100 Range, Each
Part Number: SUM-5717
Not Yet Reviewed
Estimated Ship Date: Monday 5/12/2025
Estimated Ship Date: Monday 5/12/2025
PRO BBC H.R. 12 Hydraulic Roller Cam, 4/7 Swap, 276/285 Duration @ .050, 114 LSA + 8 Adv. , .700/.700 with 1.7 ratio, .741/.741 with 1.8, 4300-7200
Part Number: SUM-1262
Not Yet Reviewed
Estimated Ship Date: Monday 5/12/2025
Estimated Ship Date: Monday 5/12/2025
Camshaft Kit, Pro LS, Hydraulic Roller Tappet, Advertised Duration 275/288, Lift .600/.600, Chevy, Small Block, Each
Part Number: SUM-8707-1DT
Not Yet Reviewed
Estimated Ship Date: Monday 5/12/2025
Estimated Ship Date: Monday 5/12/2025
Camshaft Kit, Pro LS, Hydraulic Roller Tappet, Advertised Duration 280/291, Lift .625/.605, Chevy, Small Block, Kit
Part Number: SUM-8710-2-DLSTL
Not Yet Reviewed
Cannot be shipped Internationally
Cannot be shipped Internationally
Camshaft Kit, Pro LS Single Plane, Hydraulic Roller Tappet, Advertised Duration 298/309, Lift .612/.612, Chevy, Small Block, Each
Part Number: SUM-8702-1DT
Not Yet Reviewed
Estimated Ship Date: Monday 5/12/2025
Estimated Ship Date: Monday 5/12/2025
SUM-8723 Level 1 Cam kit, Dual Springs, St. Ret., Stage 4 Pro LS Twin-Turbo Cam. 240/242 Dur., 116+4, .625/.605 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0
Part Number: SUM-8723-1-DLSTL
Not Yet Reviewed
Estimated Ship Date: Monday 5/12/2025
Estimated Ship Date: Monday 5/12/2025
Cam and Lifter kit, Stage 5.5 Pro LS Twin-Turbo Cam. 251/255 Dur., 117 + 6, .625/.615 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0, Each
Part Number: SUM-K8726R1
Not Yet Reviewed
Estimated Ship Date: Monday 5/12/2025
Estimated Ship Date: Monday 5/12/2025
Combo, COMP Cams, Rocker Arms, Roller, 1.6 Ratio, Pushrods, 5/16 in., 7.200 in. Long, Chevy, Small Block, Kit
Part Number: CMB-09-0011
Not Yet Reviewed
Estimated Ship Date: Monday 5/12/2025
Estimated Ship Date: Monday 5/12/2025
Rocker Arms, Roller Fulcrum, Pedestal, 1.7 Ratio, Ductile Iron, Chevy, Small Block LS, Set of 16
Part Number: SME-K-143021
Not Yet Reviewed
Estimated Ship Date: Monday 5/12/2025
Estimated Ship Date: Monday 5/12/2025
Cam and Lifter kit, Summit Racing™ Stage 4 Pro LS Single Plane Cam, 240/252 106 +0, .569 Lift, LS1 LS2 LS6 LS3 LS7 LQ4, Each
Part Number: SUM-K8703
Not Yet Reviewed
Estimated Ship Date: Monday 5/12/2025
Estimated Ship Date: Monday 5/12/2025
Rocker Arm, Stud Mount, Full Roller, Aluminum, 1.7 Ratio, Fits 7/16 in. Stud, Chevy, Big Block, Each
Part Number: SUM-G6930B-1
Estimated Ship Date: Monday 5/12/2025
Estimated Ship Date: Monday 5/12/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 312/322, Lift .537/.559, Chevy, Small Block, Kit
Part Number: SUM-K1109
Estimated Ship Date: Monday 5/12/2025
Estimated Ship Date: Monday 5/12/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.