Availability
Valve Cover, Direct OEM Replacement, Stock Height, Cast Aluminum, Natural Finish, Includes Bolts, Grommets, Gaskets, Right/Passenger Side, GM LS, Each
Part Number: SUM-440555
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Summit HDR Pushrods Big Block Chevy 3/8 8.700 Length, Premium One-Piece .135 Wall 4130 Seamless Chromoly, 210 degree ends, Heat-Treated, Set of 8
Part Number: SUM-14938700
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Oil Pump, Standard-Volume, Standard Pressure, Chevy, Big Block, Each
Part Number: SUM-122177SV
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Oil Pan, Steel, Gold Zinc, 5 qt., Ford, Small Block, Front Sump, 1965-77, Each
Part Number: SUM-G3534
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Timing Chain and Gears, Double Roller, Ford, Small Block Windsor, For use with 2-piece Fuel Pump Eccentric Only, Set
Part Number: SUM-G6651R-9
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Power Steering Pulley, Serpentine, 6-Groove, Aluminum, Polished, .625 in. Bore, Chevy, Each
Part Number: SUM-340102
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Piston Rings, Plasma-Moly, 4.040 in. Bore, 1/16 in., 1/16 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SUM-134-CM553240
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Crankshaft Pulley, V-Belt, 3-Groove, 7.8 in., Steel, Chrome, Chevy, Big Block, Long Pump, Each
Part Number: SUM-329724
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Piston Rings, Moly, 4.040 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SUM-133-M139-40
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Oil Pump, High-Volume, Standard Pressure, Includes Pickup, Chevy, Small Block, Each
Part Number: SUM-CSUM3502H
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Crankshaft Pulley, V-Belt, 2-Groove, 7.313 in., Steel, Black, Chevy, Big Block, Short Pump, Each
Part Number: SUM-329817B
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Timing Cover, 2-Piece, Cast Aluminum, Black Powdercoated, Without Cam Sensor, Chevy, LS, V8, Each
Part Number: SUM-G6322
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Bracket, Power Steering Pump, Billet Aluminum, Polished, Saginaw, Short Water Pump, Small Block Chevy, Kit
Part Number: SUM-341200
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Pulley Kit, Serpentine, Aluminum, Clear Anodized, Ford, Modular V8, 4.6L, Set of 3
Part Number: SUM-329705
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Summit HDR Pushrods, Chevy 3/8 7.800 Length, Premium One-Piece .135 Wall Seamless 4130 Chromoly, 210 degree ends, Heat-Treated, Set of 8
Part Number: SUM-14937800
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Oil Pan, Steel, Chrome Plated, 4 qt., Chevy, Big Block, Each
Part Number: SUM-G3510
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Crankshaft Pulley, V-Belt, 3-Groove, 7.74 in., Steel, Chrome, Chevy, Small Block, Long Pump, Each
Part Number: SUM-G3958
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Filter Plates, Aluminum, Black, Mopar, Small Block LA, Each
Part Number: SUM-120117
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Oil Pan, Steel, Chrome Plated, 5 qt., Chevy, Small Block, Each
Part Number: SUM-G3503
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Oil Pump and Pickup Assembly, High-Volume, Chevy, Small Block, Kit
Part Number: SES-3-60-08-035
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Oil Pan, Stock Replacement, Steel, Black Painted, 5 qt., Chevy, Small Block, Each
Part Number: SUM-G3505B
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Oil Pan, Steel, Gold Zinc, 5 qt., Chevy, 1986 & Up, Each
Part Number: SUM-G3530
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Piston Rings, Moly, 4.060 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SUM-133-M139-60
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Summit Precision High-Tensile Tri-Metal Alloy COATED Racing Rod Bearings, SBC/LS 2.100 pin, .837 width, Standard Clearance, set
Part Number: SUM-663HCS
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Oil Pump and Pickup Assembly, Standard-Volume, Pontiac, Kit
Part Number: SES-8-60-08-015
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.