Availability
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, SBC 350 Main Standard Clearance, Half-Upper groove, set
Part Number: SUM-909HS
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Crankshaft Pulley, V-Belt, 2-Groove, 6.6 in., Aluminum, Natural, Chevy, Small Block, Short Pump, Each
Part Number: SUM-G3962
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Oil Pan, Steel, Black Painted, 4 qt., Chevy, Big Block, Each
Part Number: SUM-G3510B
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Piston Rings, Plasma-Moly, 4.030 in. Bore, 1/16 in., 1/16 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SUM-134-CM553230
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Water Pump Pulley, V-Belt, 1-Groove, Aluminum, Machined, Chevy, Small Block, Long Pump, Each
Part Number: SUM-G3963
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Oil Pump and Pickup Assembly, High-Volume, Chevy, Small Block, For 7.250 in. Deep Oil Pans, Kit
Part Number: SES-3-60-08-037
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Summit Precision High-Tensile Tri-Metal Alloy COATED Racing Rod Bearings, SBC/LS 2.100 pin, .837 width, Standard Clearance, set
Part Number: SUM-663HCS
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Pulley Kit, Serpentine, Aluminum, Clear Anodized, Ford, Modular V8, 4.6L, Set of 3
Part Number: SUM-329705
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Oil Pickup, Standard Volume, Press Fit, Street/Strip Pan Style, 8 in. Pan Depth, 0.75 in. Tube Dia., Chevy, Big Block, Ea.
Part Number: SUM-G3622
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Crankshaft Pulley, V-Belt, 3-Groove, 7.74 in., Steel, Chrome, Chevy, Small Block, Long Pump, Each
Part Number: SUM-G3958
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Water Pump Pulley, V-Belt, 2-Groove, Steel, Black, Chevy, Big Block, Short Pump, Each
Part Number: SUM-329815B
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Oil Pan, Steel, Gold Zinc, 5 qt., Chevy, 1986 & Up, Each
Part Number: SUM-G3530
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Oil Pickup, Standard Volume, Press Fit, Street/Strip Pan Style, 8.000 in. Pan Depth, 0.625 in. Tube Dia., Chevy, V8, Ea.
Part Number: SUM-G3620
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Piston Rings, Plasma-Moly, 4.060 in. Bore, 1/16 in., 1/16 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SUM-134-CM553260
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Piston Rings, Moly, 4.060 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SUM-133-M139-60
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Power Steering Pulley, V-Belt, 1-Groove, Aluminum, Polished, .664 in. Bore, Chevy, Each
Part Number: SUM-340204
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Piston Rings, Moly, 4.030 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SUM-133-M139-30
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Engine Valley Cover, Gen. 4 LS2/LS3/LS7 without PCV, Billet Aluminum, Black anodizedl, Chevy, LS, Each
Part Number: SUM-240059B
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Oil Pump and Pickup Assembly, High-Volume, Chevy, Small Block, Kit
Part Number: SES-3-60-08-035
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Oil Pan, Steel, Chrome Plated, 5 qt., Chevy, Small Block, Each
Part Number: SUM-G3503
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Valve Cover Breather w/PCV Valve, Push-In, Oval, 1.25 in. Hole, 5/16 in. Hose Barb, Aluminum, Finned, Black Powdercoat, Each
Part Number: SUM-G3390B
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Oil Pump, High-Volume, Standard Pressure, Includes Pickup, Chevy, Small Block, Each
Part Number: SUM-CSUM3502H
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Timing Cover, 2-Piece, Cast Aluminum, Black Powdercoated, Without Cam Sensor, Chevy, LS, V8, Each
Part Number: SUM-G6322
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Summit HDR Pushrods Big Block Chevy 3/8 8.280 Length, Premium One-Piece .135 Wall 4130 Seamless Chromoly, 210 degree ends, Heat-Treated, Set of 8
Part Number: SUM-14938280
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Timing Chain and Gear Set, Double Roller, Billet Steel Sprockets, Chevy, 7.4L, Set
Part Number: SUM-G6617R-B
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.