Availability
Pistons, Forged Aluminum, Flat, 4.000 in. Bore, 1.304 in. Compression Height, 0.927 in. Pin, Chevy, LS, Set of 8
Part Number: SUM-17407C
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Cam and Lifter kit, Summit B303 Plus Hyd. Roller Cam, 224/232 Duration, 114 LSA + 3 Adv, .550/.540 1.6 Ratio, 2800-6300 Range, '85-1996 Roller Block
Part Number: SUM-K8901
Not Yet Reviewed
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Oil Pan, Steel, Spin-On Filter, Zinc Iridited, 7 Qt. Capacity, Chevy, LS, Kit
Part Number: SUM-G3612-K
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Stage 1 Pro LS Ghost Cam. 222/234 115+3, .600/.575 Lift, Ultimate Stealth Cam, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck LS1 LS3 LS7 LS9 LQ4 LQ9 LM7
Part Number: SUM-8715R1
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Oil Pan, Steel, Black Zinc, 6 qt., Chevy, Big Block, Each
Part Number: SUM-G3604
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 272/272, Lift .454/.454, Chrysler, Small Block
Part Number: SUM-K50052
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Pro SBC Retrofit Stage 1 Hyd. Roller LS Firing Order Cam, 212/218 Dur., 110 LSA + 2 Adv, .525/.520 1.5 Ratio, .560/.555 1.6 Ratio, 1500-6000 Range
Part Number: SUM-1221
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 282/292, Lift .486/.512, Ford, 429, 460, Kit
Part Number: SUM-K3500
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Oil Pan, Steel, Black Zinc, 6 qt., Chevy, Small Block, Each
Part Number: SUM-G3603
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Stage 4 Pro LS Truck Swap Cam, 226/230 112+4, .550 /.550 Lift, 3-bolt, Chevy, LS, Each
Part Number: SUM-8714R1
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Rocker Arms, Stud Mount, Full Roller, Aluminum, 1.6 Ratio, Fits 3/8 in. Stud, Chevy, Small Block, Set of 16
Part Number: SUM-G6920B
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Engine Rebuild, Hypereutectic Flat, 4.030 in. Bore, Standard Rod, Standard Main, Chevy, 350, Kit
Part Number: SUM-SBCKIT3-300
Cannot be shipped Internationally if ordered today
Cannot be shipped Internationally if ordered today
Forged Pro BB Chevy 4340 Forged Steel I-Beam Connecting Rods, 6.135 in. Length, .990 Floating Pin, 8740 PSI 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-BBC6135I
Not Yet Reviewed
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Combo, Oil Pan, Black Zinc, Pickup, High-Volume Pump, Shaft, Tray, Scraper, Gaskets, Chevy, Small Block, Kit
Part Number: SUM-PANKIT2
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 276/288, Lift .441/.441, Chrysler, Small Block
Part Number: SUM-K6901
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 298/298, Lift .466/.466, Chevy, Small Block, Kit
Part Number: SUM-K1104
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Vacuum Pump, Chrome, 23 in/hg Maximum Vacuum, 12 V DC, Internal Vacuum Control, 7.75 in. Height, 6.5 in. Length, 6 in. Width, Each
Part Number: SUM-760140-C
Not Yet Reviewed
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Cam and Lifter kit, Stage 1 Pro LS Drop-in Truck Swap Cam, 210/218 112 +1, .500/.500 Lift, 3-bolt, 4.8, 5.3, 5.7, 6.0, 6.2, Each
Part Number: SUM-K8712R1
Not Yet Reviewed
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Cylinder Head Studs, 12-Point, 8740 Chromoly, Black, 2003 and Earlier, Chevy, LS, Gen III/IV, 1/2" - 13 threads at base, 1/2" - 20 top, Kit
Part Number: SUM-900507
Not Yet Reviewed
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Pistons, Forged Aluminum, Flat, 3.810 in. Bore, 1.304 in. Compression Height, 0.927 in. Pin, Chevy, LS, Set of 8
Part Number: SUM-17401C-30
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Summit Factory Performance Stage 2 LS Cam, 227/239 108 L/S, .551/.551 Lift, Vortec LS1 LS2 LS6 LS3 LS7 LQ4 LQ9, Summit's version of Factory Stage 2
Part Number: SUM-8704
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Valve Covers, Stock Height, Cast Aluminum, Pontiac Logo, Black Wrinkle, Pontiac, V8, Pair
Part Number: SUM-440415
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Pro SBC Retrofit Stage 6 Hyd. Roller LS Firing Order Cam, 248/256 Dur., 110 LSA + 2 Adv, .550/.550 1.5 Ratio, .587/.587 1.6 Ratio, 3000-7000 RPM Range
Part Number: SUM-1226
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Pistons, Forged Aluminum, Flat, 4.010 in. Bore, 1.304 in. Compression Height, 0.927 in. Pin, Chevy, LS, Set of 8
Part Number: SUM-17407C-10
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Oil Pan, Steel, Black Zinc, 6 qt., Chevy, Small Block, Each
Part Number: SUM-G3602
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.