Availability
Power Steering Bracket, Aluminum, Polished, Upper/Lower, Driver Side, Chevy, Small Block, Long Water Pump, Kit
Part Number: SUM-340201
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Muscle Car Camshaft, 302 Offroad, Mechanical Flat Tappet, 3,500-7,000 RPM Range, Adv. Duration 304 int./320 exh., Lift 494 int./512 exh., Chevy, Each
Part Number: SUM-1125
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Pro SBC Stage 7 Hyd. Flat-Tappet 4/7 Firing Order Swap Cam, 248/256 Dur., 108 LSA + 2 Adv, .518/.525 1.5 Ratio, .553/.560 1.6 Ratio, 3000-7000 Range
Part Number: SUM-1206
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Engine Valley Cover, Aluminum, Polished, Finned, Chevy GM, LS/LSX, Gen III, Each
Part Number: SUM-240058
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, Gen. V LT, .010 undersize (thicker), 180 or 360 thrust, set
Part Number: SUM-7292H010
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Engine Dress-Up Kit, Steel, Chrome, Valve Covers, Air Cleaner, Breathers, Chevy, Small Block, SBC, Kit
Part Number: SUM-CSUMG301
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Oil Pan, Conversion, Street/Strip, Steel, Chrome, 5 qt., Engine Swap, Ford, 351W, Kit
Part Number: SUM-G3550
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Engine Re-Ring, 4.030 in. Bore, Standard Rod, Standard Main, 350, Kit
Part Number: SUM-RRKIT1-300
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Piston Rings, Pro GPX Gas Ported, 4.075 in. Bore, File Fit, Gas Nitrided, 1.2mm, 1.2mm, 3.0mm Thickness, V8, Set
Part Number: SUM-GP407512
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Timing Chain and Gear Set, Adjustable, Billet Steel, Single Roller, 3-Bolt, Standard Spacing, Billet Aluminum Camshaft Gear, LS7, Kit
Part Number: SUM-G6649-4X-LS7
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, Gen. V LT, Standard Clearance, 180 or 360 thrust, set
Part Number: SUM-7292HS
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Piston Rings, Pro GPX Gas Ported, 4.065 in. Bore, File Fit, Gas Nitrided, 1.2mm, 1.2mm, 3.0mm Thickness, V8, Set
Part Number: SUM-GP406512
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Muscle Car Camshaft,325HP396, Hydraulic Flat Tappet, 2,000-4,500 RPM Range, Adv Duration 290 int./303 exh., Lift 476 int./496 exh., Chevy, Each
Part Number: SUM-1320
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Rocker Arms, Roller Tip, Cast Steel, 3/8 in. Stud Mount, 1.6 Ratio, Polylocks, Chevy, Small Block, Set of 16
Part Number: SUM-141707PL
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Piston Rings, Pro GPX Gas Ported, 4.040 in. Bore, File Fit, Plasma-moly, 5/64 in., 5/64 in., 3/16 in. Thickness, V8, Set
Part Number: SUM-GP404064
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Engine Bolts, Stainless Steel, Polished, Hex Head, Chevy, Big Block, Kit
Part Number: SUM-56491HSP
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Piston Rings, Pro GPX Gas Ported, 4.125 in. Bore, File Fit, Gas Nitrided, 1.0mm, 1.0mm, 2.0mm Thickness, V8, Set
Part Number: SUM-GP412510
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Piston Rings, Plasma-Moly, 4.060 in. Bore, 1/16 in., 1/16 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SUM-134-CM553260
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Oil Pump and Pickup Assembly, High-Volume, Ford, 429/460, Kit
Part Number: SES-5-60-08-013
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Piston Rings, Pro GPX Gas Ported, 4.500 in. Bore, File Fit, Gas Nitrided, 1/16 in., 1/16 in., 3/16 in. Thickness, V8, Set
Part Number: SUM-GP450016
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Muscle Car Camshaft, 289 HIPO, Mechanical Flat Tappet, 2,000-4,800 RPM Range, Advertised Duration 310 int./310 exh., Lift 228 int./228 exh., Ford,Each
Part Number: SUM-3610
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Engine Dress-Up Kit, Steel, Chrome, Valve Covers, Air Cleaner, Breathers, Ford, Small Block, SBF, Kit
Part Number: SUM-CSUMG300
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Combo, TCI Flexplate 168-Tooth, Summit OEM Balancer, Summit-ARP Bolts, Chevy 1986-94, 5.0, 5.7L, Kit
Part Number: CMB-08-0001
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Rocker Arms, Roller Tip, Cast Steel, 7/16 in. Stud Mount, 1.5 Ratio, Polylocks, Chevy, Small Block, Set of 16
Part Number: SUM-141703PL
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Muscle Car Camshaft, 068 or HO, Hydraulic Flat Tappet, 2,000-4,800 RPM Range, Advuration 288 int./302 exh., Lift 212 int./215 exh., Pontiac V-8, Each
Part Number: SUM-2820
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.