Availability
Sealed Power Engines & Components
Piston Rings, Moly, 4.000 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, Shallow Ring, 8-Cylinder, Set
Part Number: SLP-E-377K
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Main Bearings, 0.010 in. Crankshaft Undersize, Tri Metal, 1/2 Groove, Jeep, L6, 4.0L, Set
Part Number: SLP-7211M10
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Piston Rings, Moly, 3.940 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SLP-E-178K30
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Main Bearings, 0.010 in. Crankshaft Undersize, Tri Metal, 1/2 Groove, Ford, 385 Series Big Block, 429, 460, Set of 5
Part Number: SLP-4907M10
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Main Bearings, Tri Metal, 0.020 in. Crankshaft Undersize, Chevy, 283, 327, Set of 5
Part Number: SLP-994M20
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Piston Rings, Moly, 3.750 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 6-Cylinder, Set
Part Number: SLP-E-222K
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Main Bearings, 0.010 in. Crankshaft Undersize, Bi Metal, 1/2 Groove, Chrysler, Dodge, Plymouth, 360, Set of 5
Part Number: SLP-4999MA10
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Piston Rings, Moly, 4.110 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SLP-E-301K30
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Piston Rings, Moly, 4.010 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SLP-E-251K10
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Main Bearings, Competition, 0.001 in. Oversize, Tri Metal, 3/4 Groove, Ford, 351M, 351W, 400, Set
Part Number: SLP-130M1X
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Main Bearings, Standard Size, Tri Metal, Ford, L6, 4.9L, Set of 7
Part Number: SLP-4916M
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Piston Rings, Moly, 4.185 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SLP-E-243K60
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Piston Rings, Moly, 90.200mm/3.551 in. Bore, 1.5mm, 1.5mm, 3.0mm Thickness, 8-Cylinder, Set
Part Number: SLP-E-916K
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Oil Pump, High-Volume, Standard Pressure, Chevy, Big Block, Each
Part Number: SLP-224-4153
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Main Bearings, Competition Series, Standard Size, Tri Metal, 3/4 Groove, Ford, 260, 289, 302, Set of 5
Part Number: SLP-129M
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Main Bearings, Competition Series, Standard Size, Tri Metal, 3/4 Groove, Chevy, 400, Set of 5
Part Number: SLP-140M
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Main Bearings, Competition Series, Standard Size, Tri Metal, 3/4 Groove, Ford, 351M, 351W, 400, Set of 5
Part Number: SLP-130M
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Main Bearings, Standard Size, Bi Metal, 1/2 Groove, Ford, 351W, 351M, 400, Set of 5
Part Number: SLP-5078MA
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Piston Rings, Moly, 3.875 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SLP-E-245K
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Piston Rings, Cast Iron, 4.110 in. Bore, 5/64 in., 3/32 in., 3/16 in. Thickness, V8, Set
Part Number: SLP-E-180X60
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Piston Rings, Moly, 4.060 in. Bore, 1.5mm, 1.5mm, 3.0mm Thickness, 8-Cylinder, Set
Part Number: SLP-E-921K60
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Main Bearings, Standard Size, Bi Metal, Full Groove, Chrysler, Dodge, Plymouth, 318, Set of 5
Part Number: SLP-5095MA
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Piston Rings, Moly, 4.165 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SLP-E-243K40
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Main Bearings, 0.040 in. Crankshaft Undersize, Bi Metal, 1/2 Groove, Chevy, Big block, Set of 5
Part Number: SLP-4400MA40
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Main Bearings, Competition Series, Standard Size, Tri Metal, 1/2 Groove, Ford, Mercury, 2.0L, Set
Part Number: SLP-158M
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster