Availability
Brian Tooley Racing Camshafts & Valvetrain
Valve Spring Kit, Platinum, Dual, Standard, Titanium Retainer, 377 lbs./in. Spring Rate, Factory Valve Guides, Kit
Part Number: BTC-SK007-0560BB
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Rocker Arm Trunnion Upgrade Kit, Needle Bearing, Roller Fulcrum, Chevrolet, 5.3L/6.2L/6.6L Gen V, 7.0L LS, Kit
Part Number: BTC-TK027
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Camshaft, Hydraulic Roller, OE Roller, Supercharged Use, 226 Intake Duration, 0.636 in./0.636 in. Lift, Chevrolet, 6.2L LS, Each
Part Number: BTC-S0402
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Camshaft, Hydraulic Roller, Street/Towing Use, L86 DOD Delete, 200/206 Duration, 0.549 in./0.522 in. Lift, Chevrolet, 5.3L/6.2L Gen V, Each
Part Number: BTC-2240006175
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.425 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7425312-16
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.500 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7500312-16
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Camshaft, BTR, Stage 2 Truck V2, 212 int./218 exh. Duration, 0.553 in./0.553 in. Lift, 111 LSA, 3-Bolt, 4.8L, 5.3L, 6.0L, Each
Part Number: BTC-BTR31218110
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Valve Springs, Beehive, Single, 0.625 in. Maximum Valve Lift, 294 lbs./in. Spring Rate, 1.295 in. Coil Bind Height, Set of 16
Part Number: BTC-SP02116
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.200 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tips, Set of 16
Part Number: BTC-PR7200312-16
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Camshaft, BTR, Stage 2, 221 int. Duration, 0.619 in./0.617 in. Lift, 113 LSA, 3-Bolt, 4.8L, 5.3L, 6.0L, Gen III/IV LS, Each
Part Number: BTC-BTRLS3STAGE2
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.250 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7250312-16
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Valve Spring Kit, Platinum, Dual, Standard, Titanium Retainer, 377 lbs./in. Spring Rate, Gen V LT4, Kit
Part Number: BTC-SK008-BB
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Rocker Arm Shaft, LS1 Shaft Rockers, Chevrolet, LS Engines, Kit
Part Number: BTC-BTRSRKR1KIT
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Camshaft Retainer Plates, BTR Cam Retainer Plate, Gen III/Gen IV LS Engines
Part Number: BTC-BTR89016
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.400 in. Length, 0.075 in. Wall Thickness, Steel, Oiling, Ball Tips, Set of 16
Part Number: BTC-OE740016
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
LS3 Rocker Arm Shafts, Chevy, LS, Kit
Part Number: BTC-BTRSRKR3KIT
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Camshaft, BTR, LS, Truck Torque, Hydraulic Roller, 202 int./202 exh. Duration, 0.511 int./0.511 exh. Lift, 111+1 LSA, 3-Bolt, Each
Part Number: BTC-30202111R1
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Timing Chain Dampener, Plastic, Black, Chevy, LS, Each
Part Number: BTC-BTR88670
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Camshaft, BTR Stage 2 Turbo V2, Hydraulic Roller, 220 int./223 exh. Duration, 0.618 in./0.618 in. Lift, 113 LSA, 3-Bolt, Chevy, GMC, Each
Part Number: BTC-BTRTURBOSTG2
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Camshaft, BTR, Stage 4 Truck V2, 224 int./230 exh. Duration, 0.553 in./0.553 in. Lift, 109 LSA, 3-Bolt, 4.8L, 5.3L, 6.0L, Each
Part Number: BTC-BTR32430090
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Lifters, Delphi Gen V Hydraulic Roller Lifters, Non-DOD Lifters, 0.842 in. O.D., Chevrolet, Set of 16
Part Number: BTC-X17120735-16
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Rocker Arm Hold-Down Bolt, 12-point Head, M8 x 1.25 Thread, 1.771 in. Underhead Length, Chevrolet, Small Block LS, Set of 16
Part Number: BTC-TKBOLTS0216
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.450 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7450312-16
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Camshaft, BTR, Gen V 220 Cam, 220 int./220 exh. Duration, 0.644 in./0.644 in. Lift, 113 LSA, 1-Bolt, 5.3L, 6.2L, Each
Part Number: BTC-BTRGENV220
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Camshafts, BTR, PDS Stage 4 V2, 229 int. Duration, 0.636 int./0.636 exh. Lift, 116.5 LSA, 3-Bolt, Chevy, LSA, LS9, 6.2L, Each
Part Number: BTC-BTRPDSSTAGE4
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster