Availability
Wheel Alignment Kit, Front, Cadillac, Chevy, GMC, Pickup, SUV, Kit
Part Number: EIB-5-86375K
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
EIBACH LINEAR TENDER SPRING
Part Number: EIB-60-60-0040
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Helper Spring, Gunmetal Powdercoated, 2.362 in. Inside Diameter, 3.980 in. Length, 286 lbs./in. Rate, Each
Part Number: EIB-60-60-0050
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
EIBACH LINEAR TENDER SPRING
Part Number: EIB-70-70-0030
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Shocks and Struts, Pro-Dampers, Twin Tube, Rear, Chevrolet, Oldsmobile, Pontiac, Each
Part Number: EIB-38488002
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Shocks and Struts, Pro-Dampers, Twin Tube, Rear, Chevrolet, Oldsmobile, Pontiac, Each
Part Number: EIB-38558001BB
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Shocks and Struts, Pro-Dampers, Twin Tube, Front, Chevrolet, Oldsmobile, Pontiac, Each
Part Number: EIB-38558001SB
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 60.00mm Inside Diameter, 250.00mm Length, 571 lbs./in.Spring Rate, Each
Part Number: EIB-250-60-0100
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 60.00mm Inside Diameter, 250.00mm Length, 628 lbs./in.Spring Rate, Each
Part Number: EIB-250-60-0110
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 60.00mm Inside Diameter, 250.00mm Length, 685 lbs./in.Spring Rate, Each
Part Number: EIB-250-60-0120
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 70.00mm Inside Diameter, 250.00mm Length, 342 lbs./in.Spring Rate, Each
Part Number: EIB-250-70-0060
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 70.00mm Inside Diameter, 250.00mm Length, 371 lbs./in.Spring Rate, Each
Part Number: EIB-250-70-0065
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 70.00mm Inside Diameter, 250.00mm Length, 400 lbs./in.Spring Rate, Each
Part Number: EIB-250-70-0070
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 70.00mm Inside Diameter, 250.00mm Length, 428 lbs./in.Spring Rate, Each
Part Number: EIB-250-70-0075
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 70.00mm Inside Diameter, 250.00mm Length, 571 lbs./in.Spring Rate, Each
Part Number: EIB-250-70-0100
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 60.00mm Inside Diameter, 300.00mm Length, 114 lbs./in.Spring Rate, Each
Part Number: EIB-300-60-0020
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 60.00mm Inside Diameter, 300.00mm Length, 143 lbs./in.Spring Rate, Each
Part Number: EIB-300-60-0025
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 60.00mm Inside Diameter, 300.00mm Length, 171 lbs./in.Spring Rate, Each
Part Number: EIB-300-60-0030
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 60.00mm Inside Diameter, 300.00mm Length, 200 lbs./in.Spring Rate, Each
Part Number: EIB-300-60-0035
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 60.00mm Inside Diameter, 300.00mm Length, 228 lbs./in.Spring Rate, Each
Part Number: EIB-300-60-0040
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 60.00mm Inside Diameter, 300.00mm Length, 257 lbs./in.Spring Rate, Each
Part Number: EIB-300-60-0045
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 60.00mm Inside Diameter, 300.00mm Length, 285 lbs./in.Spring Rate, Each
Part Number: EIB-300-60-0050
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 60.00mm Inside Diameter, 300.00mm Length, 457 lbs./in.Spring Rate, Each
Part Number: EIB-300-60-0080
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 60.00mm Inside Diameter, 300.00mm Length, 514 lbs./in.Spring Rate, Each
Part Number: EIB-300-60-0090
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 70.00mm Inside Diameter, 300.00mm Length, 114 lbs./in.Spring Rate, Each
Part Number: EIB-300-70-0020
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.