Availability
OLDSMOBILE Shocks and Struts
Showing In Stock Items. Show All 282 Items.
Shock Absorber / Strut, Gas-a-Just, Monotube, Gas Charged, Each
Part Number: KYB-KG4515
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
BUILD IT WITH SUMMIT!
Shocks and Struts, Loaded Strut Assemblies, Stock Ride Height, Twin-tube, Gas-charged, Black Boot, Front, Buick, Cadillac, Oldsmobile, Pontiac, Each
Part Number: SUM-SA11040
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Shock Absorber / Strut, Excel-G, Twin-Tube, Gas Charged, Each
Part Number: KYB-343127
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Shock/Strut, HiJackers, Adjustable, Air Shock, Rear, Pair
Part Number: GAB-49205
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Shock/Strut, HiJackers, Adjustable, Air Shock, Rear, Pair
Part Number: GAB-49152
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Shock Absorber / Strut, Gas-a-Just, Monotube, Gas Charged, Each
Part Number: KYB-KG4513
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Shock/Strut, HiJackers, Adjustable, Air Shock, Rear, Pair
Part Number: GAB-49131
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Shocks, Load Carrier, Gas, Rear, Pair
Part Number: GAB-43140
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Shock Absorber / Strut, Gas-a-Just, Monotube, Gas Charged, Each
Part Number: KYB-KG5504
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Shock Absorber, Gas-a-Just, Monotube, Gas Charged, AMC, Buick, Cadillac, Chevy, Oldsmobile, Each
Part Number: KYB-KG5507
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Shock Absorber / Strut, Gas-a-Just, Monotube, Gas Charged, Each
Part Number: KYB-KG5521
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Shock/Strut, HiJackers, Adjustable, Air Shock, Mono-Leaf, Rear, Pair
Part Number: GAB-49122
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Shocks, Load Carrier, Gas, Buick, Chevy, GMC, Nissan, Oldsmobile, Pontiac, Rear, Pair
Part Number: GAB-43060
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Shock Absorber / Strut, Excel-G, Twin-Tube, Gas Charged, Each
Part Number: KYB-343157
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Shock/Strut, Specialty, Tie Bar, Eyelet, Kit
Part Number: ADO-504-511
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Shock/Strut, Load Carrier, Gas Charged, Front, Pair
Part Number: GAB-34073
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Shock Absorber / Strut, Excel-G, Twin-Tube, Gas Charged, Each
Part Number: KYB-343128
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Shock Absorber / Strut, Excel-G, Twin-Tube, Gas Charged, Each
Part Number: KYB-343130
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Shocks and Struts, HiJackers Air Shocks, Stock Ride Height, Adjustable Valving, Air Hose Kit, Rear, for Nissan, Dodge, Ford, Jeep, Toyota, Pair
Part Number: GAB-49310
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Shock/Strut, OESpectrum, Monotube, Rear, Buick, Chevy, Oldsmobile, Pontiac, Nissan, Each
Part Number: MON-5802
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Shock Absorber / Strut, Excel-G, Twin-Tube, Gas Charged, Each
Part Number: KYB-343135
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Shock/Strut, Specialty, Eyelet, Eyelet, Kit
Part Number: ADO-504-564
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Shock Absorber / Strut, Gas-a-Just, Monotube, Gas Charged, Each
Part Number: KYB-KG5548
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Shock/Strut, OESpectrum, Monotube, Front, GM, Volvo, Toyota, for Nissan, Each
Part Number: MON-5804
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Shock/Strut, OESpectrum, Ford, Front, Each
Part Number: MON-5801
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Shock/Strut, Max Air, Twin-Tube, Buick, Chevy, GMC, Oldsmobile, Pontiac, RWD, Pair
Part Number: MON-MA762
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster