Availability
JEEP COMANCHE Chassis & Suspension
Showing In Stock Items. Show All 56 Items.
Steering Boxes, New Steering Gears, Power Assist, Cast Iron, Natural, AMC, Buick, Cadillac, Chevy, Dodge, GMC, Isuzu, Jeep, Oldsmobile, Pontiac, Each
Part Number: LSC-11353
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
BUILD IT WITH SUMMIT!
Steering Linkage Upgrade, ZJ Style, Moog Tie Rods, Monroe Stabilizer, Jeep, Kit
Part Number: CMB-15-0103
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Steering Box, Saginaw 525, Manual, Front Steer, 16:1 Ratio, Cast Iron, 3/4 in. - 36-spline Input Shaft, Each
Part Number: BRG-920040
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Steering Box, Saginaw 525, Manual, Front Steer, 24:1 Ratio, Cast Iron, 3/4 in. - 30-spline Input Shaft, Each
Part Number: BRG-920010
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Air Compressor, Heavy Duty, Load Controller I System, 12 V DC, 10 amps, Dash Panel, Wiring Harness, Kit
Part Number: AIR-25854
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Power Steering Pump, Saginaw P Series, 16mm Female O-ring Inlet, Jeep, Each
Part Number: PFN-SP1402
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Steering Box, Blueprinted, Saginaw 122 Manual, Front Steer, 24:1 Ratio, Cast Iron, Natural, Each
Part Number: BRG-920055
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Air Compressor, Suspension, Maximum 100 psi, 12 V DC, 12.0 Amps, Kit
Part Number: AIR-25592
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Steering Linkage System, Heavy-Duty, Greasable, Left Hand Drive, Jeep, Kit
Part Number: RTO-RT21005
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Track Bar, Front, Adjustable, Chromoly, Black Powdercoated, Jeep, Each
Part Number: RKJ-CE-9120TJS
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Slip Yoke Eliminator Short Shaft Kit, Tailshaft Housing, Transfer Case Mainshaft, 32-spline, NP231J, Jeep, Kit
Part Number: TMI-4444400
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Shock, 2.0 Performance Series LSC, Gas Charged, Lifted, Front, Jeep, Each
Part Number: FRS-985-26-108
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Control Arms, X-Flex, Tubular, Front, Upper and Lower, Steel, Black Powdercoated, Jeep, Set
Part Number: ROU-11920
Not Yet Reviewed
Estimated Ship Date: Mar 16, 2026 if ordered today
Estimated Ship Date: Mar 16, 2026 if ordered today
Steering Linkage System, Heavy-Duty, Greasable, Right Hand Drive, Jeep, Kit
Part Number: RTO-RT21007
Not Yet Reviewed
Estimated Ship Date: May 8, 2026 if ordered today
Estimated Ship Date: May 8, 2026 if ordered today
TRACK BAR
Part Number: DPC-TB96259RD
Not Yet Reviewed
Estimated Ship Date: Mar 20, 2026 if ordered today
Estimated Ship Date: Mar 20, 2026 if ordered today
Control Arms, Johnny Joint, Front Upper, Tubular, Steel, Black Powdercoated, Jeep, Pair
Part Number: RKJ-CE-9102SF
Estimated Ship Date: Mar 10, 2026 if ordered today
Estimated Ship Date: Mar 10, 2026 if ordered today
Steering Box, Front Steer, Manual, Cast Iron, Natural, Left Hand Drive, Jeep, Each
Part Number: CWA-52000089
Not Yet Reviewed
Estimated Ship Date: May 21, 2026 if ordered today
Estimated Ship Date: May 21, 2026 if ordered today
Drag Link Kit, Heavy-Duty, Drag Link Assembly, Greasable, DOM Steel Tube, Tie Rod Ends, Steering Stabilizer, Jeep, Kit
Part Number: ROU-10613
Estimated Ship Date: Mar 16, 2026 if ordered today
Estimated Ship Date: Mar 16, 2026 if ordered today
Drag Link Kit, Heavy-Duty, Drag Link Assembly, Greasable, DOM Steel Tube, Tie Rod Ends, Jeep, Kit
Part Number: ROU-10604
Not Yet Reviewed
Estimated Ship Date: Mar 16, 2026 if ordered today
Estimated Ship Date: Mar 16, 2026 if ordered today
Sway Bar Arms, Antirock, Aluminum, 18.00 in. Long, Staight, 5 Link Mounting Holes, Natural, Universal, Machined for Jeep, Pair
Part Number: RKJ-CE-9904-18M
Not Yet Reviewed
Estimated Ship Date: Mar 11, 2026 if ordered today
Estimated Ship Date: Mar 11, 2026 if ordered today
Drag Link, Heavy Duty, Forged Steel, 1 1/4 in. Diameter, Jeep, TJ/LJ/XJ/MJ, Each
Part Number: RKJ-CE-9701DL
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
TJ 1 TON - SUPERDUTY (05+) Front Dana 60 Swap Kit - w/ Adjustable Truss Upper Link Mount (single)
Part Number: RTE-TJ6083
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Suspension Helper Springs, Rubber, Rear, Jeep, Nissan, Kit
Part Number: TBI-JRC01
Estimated Ship Date: Mar 16, 2026 if ordered today
Estimated Ship Date: Mar 16, 2026 if ordered today
Power Steering Pump, Standard-volume, Reservoir, Jeep, Each
Part Number: CWA-52088131
Not Yet Reviewed
Estimated Ship Date: May 21, 2026 if ordered today
Estimated Ship Date: May 21, 2026 if ordered today
Steering Gear 1980-2005 IsuzuDodgeJeepBuickCadillacChevroletGMCOldsmobilePontiacAmerican Motors
Part Number: SPZ-ZSG7560
Not Yet Reviewed
Estimated Ship Date: Mar 16, 2026 if ordered today
Estimated Ship Date: Mar 16, 2026 if ordered today
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster