Availability
Lowering Springs, Pro-Kit, Front and Rear, Black Powdercoated, Porsche, 911, Kit
Part Number: EIB-7208-140
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Lowering Springs, Pro-Kit, Front and Rear, Black Powdercoated, Porsche, Kit
Part Number: EIB-7213-140
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Lowering Springs, Pro-Kit, Front and Rear, Black Powdercoated, Porsche, Kit
Part Number: EIB-7217-140
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
PRO-KIT PERF SPGS
Part Number: EIB-7222140
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Pro-Truck Front Only Suspension Lowering Kit, Coil Spring Front, GM, Pair
Part Number: EIB-38110-520
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Lowering Springs, Pro-Kit, Front and Rear, Black Powdercoated, Cadillac, Kit
Part Number: EIB-38163-140
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Shocks and Struts, Pro-Dampers, Twin Tube, Rear, Chevrolet, Oldsmobile, Pontiac, Each
Part Number: EIB-38488002
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Shocks and Struts, Pro-Dampers, Twin Tube, Rear, Chevrolet, Oldsmobile, Pontiac, Each
Part Number: EIB-38558001BB
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Shocks and Struts, Pro-Dampers, Twin Tube, Front, Chevrolet, Oldsmobile, Pontiac, Each
Part Number: EIB-38558001SB
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 60.00mm Inside Diameter, 250.00mm Length, 571 lbs./in.Spring Rate, Each
Part Number: EIB-250-60-0100
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 60.00mm Inside Diameter, 250.00mm Length, 628 lbs./in.Spring Rate, Each
Part Number: EIB-250-60-0110
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 60.00mm Inside Diameter, 250.00mm Length, 685 lbs./in.Spring Rate, Each
Part Number: EIB-250-60-0120
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 70.00mm Inside Diameter, 250.00mm Length, 342 lbs./in.Spring Rate, Each
Part Number: EIB-250-70-0060
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 70.00mm Inside Diameter, 250.00mm Length, 371 lbs./in.Spring Rate, Each
Part Number: EIB-250-70-0065
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 70.00mm Inside Diameter, 250.00mm Length, 400 lbs./in.Spring Rate, Each
Part Number: EIB-250-70-0070
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 70.00mm Inside Diameter, 250.00mm Length, 428 lbs./in.Spring Rate, Each
Part Number: EIB-250-70-0075
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 70.00mm Inside Diameter, 250.00mm Length, 571 lbs./in.Spring Rate, Each
Part Number: EIB-250-70-0100
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Handling Package, Pro-Plus, Dodge, Kit
Part Number: EIB-28111880
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 60.00mm Inside Diameter, 300.00mm Length, 114 lbs./in.Spring Rate, Each
Part Number: EIB-300-60-0020
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 60.00mm Inside Diameter, 300.00mm Length, 143 lbs./in.Spring Rate, Each
Part Number: EIB-300-60-0025
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 60.00mm Inside Diameter, 300.00mm Length, 171 lbs./in.Spring Rate, Each
Part Number: EIB-300-60-0030
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 60.00mm Inside Diameter, 300.00mm Length, 200 lbs./in.Spring Rate, Each
Part Number: EIB-300-60-0035
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 60.00mm Inside Diameter, 300.00mm Length, 228 lbs./in.Spring Rate, Each
Part Number: EIB-300-60-0040
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 60.00mm Inside Diameter, 300.00mm Length, 257 lbs./in.Spring Rate, Each
Part Number: EIB-300-60-0045
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Coilover Spring, Red Powdercoated, 60.00mm Inside Diameter, 300.00mm Length, 285 lbs./in.Spring Rate, Each
Part Number: EIB-300-60-0050
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.