Selected Filters


Loading...

Availability


2016 Intake Manifolds

Individual Parts

Results 201 - 225 of 469

Intake Manifolds, Sniper EFI, Dual Plenum, Cathedral Port, 102mm Throttle Body, 1,600-6,800 RPM, Aluminum, Black, Chevy, LS, 4.8-6.0L, Each

Part Number: SNE-820242

Not Yet Reviewed

Estimated Ship Date: Mar 9, 2026 if ordered today

...Loading

Estimated Ship Date: Mar 9, 2026 if ordered today

Engine Steam Line Fitting, Male Connector Type, -4AN Male, -4AN O-Ring Female, Aluminum, Black Anodized, Chevrolet, LS, Each

Part Number: SUM-220956B

3.0 out of 5 stars ( 2 )

Estimated Ship Date: Monday 2/16/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/16/2026 if shipped by air

Intake Manifolds, LT Modular, Hi-Ram, Base Only, Standard Deck, Tunnel Ram, 3,500-8,000 RPM Range, Aluminum, Satin Finish, Chevy, 5.3L, 6.2L, Each

Part Number: HLY-300-237

Not Yet Reviewed

Estimated Ship Date: Monday 2/16/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/16/2026 if shipped by air

Intake Manifolds, Nitro-Port Loaded, Rectangular Port, Short Style, Aluminum, Natural, 102mm Throttle Body, Fuel Injectors, 750 Hp, Chevy, LS, Kit

Part Number: FIF-73301

Not Yet Reviewed

Estimated Ship Date: Monday 2/16/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/16/2026 if shipped by air

Intake Manifolds, LS Split Design Carbureted, Single Plane, Aluminum, Black, 4-barrel Square Bore, Chevrolet, LS3, L92 Cylinder Heads, Each

Part Number: HLY-300-291BK

4.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 2/16/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/16/2026 if shipped by air

Intake Manifolds, Sniper EFI, Fabricated, Cathedral Port, 4150 Style Flange, 2,200-6,800 RPM, Aluminum, Black, Chevy, LS Base, 4.8-6.0L, Each

Part Number: SNE-820051

Not Yet Reviewed

Estimated Ship Date: Mar 9, 2026 if ordered today

...Loading

Estimated Ship Date: Mar 9, 2026 if ordered today

Intake Manifold Runner Control Valve, Plastic, Chrysler, Dodge, Ram, Each

Part Number: RNB-911-933

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 2/16/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/16/2026 if shipped by air

Intake Manifold, Aluminum, Natural, Competition, 4150-style, 4-barrel, Chevy, L76/L92/LS3, Each

Part Number: NAL-25534401

4.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 2/16/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/16/2026 if shipped by air

Intake Bolts, Chromoly, Black Oxide, Hex Head, Mopar, Hemi, 5.7L, 6.1L, Aluminum Intake, Kit

Part Number: ARP-144-2003

Not Yet Reviewed

Estimated Ship Date: Monday 2/16/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/16/2026 if shipped by air

Intake Manifolds, Sniper EFI, Fabricated, Cathedral Port, 102mm Throttle Body, 1,800-6,400 RPM, Aluminum, Silver, Chevy, LS, 4.8-6.0L, Each

Part Number: SNE-820111-1

Not Yet Reviewed

Estimated Ship Date: Mar 10, 2026 if ordered today

...Loading

Estimated Ship Date: Mar 10, 2026 if ordered today

Intake Manifolds, Sniper EFI, Fabricated, Cathedral Port, 102mm Throttle Body, 1,800-6,400 RPM, Aluminum, Black, Chevy, LS, 4.8-6.0L, Kit

Part Number: SNE-820112-1

2.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 2/16/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/16/2026 if shipped by air

Intake Manifold, Fuel Injected, Tall Profile, 102mm Bore Size, Aluminum, Satin, Chevy, LS3, L92, Each

Part Number: SUM-226124L

3.67 out of 5 stars ( 3 )

Estimated Ship Date: Monday 2/16/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/16/2026 if shipped by air

Intake Manifold Hardware and Installation Kit, Gaskets, Brian Tooley Equalizer, Chevrolet, Small Block LS, Kit

Part Number: BTC-IMAHK

Not Yet Reviewed

Estimated Ship Date: Monday 2/16/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/16/2026 if shipped by air

Intake Manifold, Fuel Injected, Low Profile, 92mm Bore Size, Aluminum, Black, Chevy, LS1, LS2, LS6, Each

Part Number: SUM-226127BL

Not Yet Reviewed

Estimated Ship Date: Monday 2/16/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/16/2026 if shipped by air

Intake Manifolds, Holley EFI, LT1, Gen V, Lo-Ram, Direct Injection, 105mm Bore, Standard Deck, Aluminum, Satin Finish, Chevy, 5.3L, 6.2L, Each

Part Number: HLY-300-715

Not Yet Reviewed

Estimated Ship Date: Mar 4, 2026 if ordered today

...Loading

Estimated Ship Date: Mar 4, 2026 if ordered today

Intake Manifolds, LS Split Design EFI, Single Plane, Aluminum, Black, 4500 Dominator, Chevrolet, LS1, LS2, LS6, Kit

Part Number: HLY-300-294BK

Not Yet Reviewed

Estimated Ship Date: Mar 4, 2026 if ordered today

...Loading

Estimated Ship Date: Mar 4, 2026 if ordered today

Intake Manifolds, Sniper EFI, Fabricated, Cathedral Port, 92mm Throttle Body, 1,800-7,000 RPM, Aluminum, Silver, Chevy, LS, 4.8-6.0L, Each

Part Number: SNE-820031-1

1.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 2/16/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/16/2026 if shipped by air

Engine Steam Line Plumbing Kit, Four Corner Kit, Aluminum, Black Anodized, Chevy, Small Block LS, Kit

Part Number: TFS-30600601

2.0 out of 5 stars ( 3 )

Estimated Ship Date: Monday 2/16/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/16/2026 if shipped by air

Intake Bolts, Stainless Steel, Polished, Hex Head, Chevrolet, LS, Edelbrock Intake, Kit

Part Number: ARP-430-2002

Not Yet Reviewed

Estimated Ship Date: Monday 2/16/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/16/2026 if shipped by air

Intake Bolts, Chromoly, Black Oxide, 12-Point Head, Chevrolet, LS, Edelbrock Intake, Kit

Part Number: ARP-130-2102

5.0 out of 5 stars ( 2 )

Estimated Ship Date: Monday 2/16/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/16/2026 if shipped by air

Intake Manifolds, Sniper EFI, Hi-Ram, Cathedral Port, 90mm Throttle Body, 2,100-8,200 RPM, Welded Aluminum, Black, Chevy, LS, 4.8-6.0L, Each

Part Number: SNE-832142

4.0 out of 5 stars ( 1 )

Estimated Ship Date: Mar 10, 2026 if ordered today

...Loading

Estimated Ship Date: Mar 10, 2026 if ordered today

Intake Manifolds, LS Modular, Lo-Ram EFI, Dual Injection, Rectangular Port Head, Multi-port, 105mm Bore, Aluminum, Black, Chevy, 6.0L, 6.2L, Each

Part Number: HLY-300-683BK

Not Yet Reviewed

Estimated Ship Date: Mar 4, 2026 if ordered today

...Loading

Estimated Ship Date: Mar 4, 2026 if ordered today

Intake Manifold, Fuel Injected, Low Profile, 102mm Bore Size, Aluminum, Satin, Chevy, LS1, LS2, LS6, Each

Part Number: SUM-226125L

Not Yet Reviewed

Estimated Ship Date: Monday 2/16/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/16/2026 if shipped by air

HARDWARE KIT MANIFOLD & TB

Part Number: FST-54018C-KIT

Not Yet Reviewed

Estimated Ship Date: Monday 2/16/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/16/2026 if shipped by air

Intake Manifolds, LT Modular, Hi-Ram, Top Section Only, Standard Deck, Tunnel Ram Style, Aluminum, Satin Finish, Chevy, 6.2L, Each

Part Number: HLY-300-208

Not Yet Reviewed

Estimated Ship Date: Monday 2/16/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/16/2026 if shipped by air