Availability
2008 JEEP Air & Fuel Delivery
Air Intake, Magnum Force Stage 2 Pro 5R, Jeep, 6.1L, Kit
Part Number: AFE-54-11192
Not Yet Reviewed
Estimated Ship Date: Jun 3, 2026 if ordered today
Estimated Ship Date: Jun 3, 2026 if ordered today
Fuel Injectors, 42 lb/hr, Ford, Set of 6
Part Number: DWK-18U0000426
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Fuel Injectors, 39 lb/hr, Ford, Set of 6
Part Number: DWK-18U0000396
Not Yet Reviewed
Estimated Ship Date: May 27, 2026 if ordered today
Estimated Ship Date: May 27, 2026 if ordered today
Air Filter Element, Extra Guard, Synthetic, Jeep, Each
Part Number: FRM-CA10348
Estimated Ship Date: Today
Estimated Ship Date: Today
Estimated Ship Date: Today
Fuel Injector, Chrysler, Jeep, Each
Part Number: CWA-4861667AA
Not Yet Reviewed
Estimated Ship Date: Jul 23, 2026 if ordered today
Estimated Ship Date: Jul 23, 2026 if ordered today
85mm EFI 5.7 & 6.1 Hemi Plate System (10lb Bottle)
Part Number: NXO-00-10131-10
Not Yet Reviewed
Estimated Ship Date: May 15, 2026 if ordered today
Estimated Ship Date: May 15, 2026 if ordered today
Throttle Body Spacer, 0.500 in. Thickness, Aluminum, Black, Jeep, 3.8L, Each
Part Number: RTO-RT35006
Not Yet Reviewed
Estimated Ship Date: Jul 13, 2026 if ordered today
Estimated Ship Date: Jul 13, 2026 if ordered today
Chrysler 4.7/5.7/6.1 EFI Single Nozzle System (15lb Bottle)
Part Number: NXO-00-10021-15
Not Yet Reviewed
Estimated Ship Date: May 15, 2026 if ordered today
Estimated Ship Date: May 15, 2026 if ordered today
Intake Manifold Runner Control Valve, Plastic, Chrysler, Dodge, Jeep, Each
Part Number: RNB-911-902
Not Yet Reviewed
Estimated Ship Date: May 21, 2026 if ordered today
Estimated Ship Date: May 21, 2026 if ordered today
Valve, EGR, OEM Replacement, Chrysler, Dodge, Jeep, Each
Part Number: MOP-53032509AN
Estimated Ship Date: Today
Estimated Ship Date: Today
Throttle Body, MPI, Cast Aluminum, Natural, Chrysler, Jeep, Each
Part Number: CWA-4591847AC
Not Yet Reviewed
Estimated Ship Date: Jul 23, 2026 if ordered today
Estimated Ship Date: Jul 23, 2026 if ordered today
Fuel Tank Cap, OE Replacement, Plastic, Black,Chrysler, Dodge, Hyundai, Jeep, Kia, Nissan, Ram, Each
Part Number: SNN-MGC837
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Estimated Ship Date: Today
Fuel Injections System Wiring Harnesses, Gen III Hemi, Drive-By-Wire Harness, Late Pedal, OE Connectors, Plug-and-Play, Chrysler, Dodge, Jeep, Kit
Part Number: HLY-558-418
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Wiring Harnesses, Holley EFI, Gen III Hemi, Throttle Position, Idle Air Controls, Factory Connectors, Chrysler, Dodge, Jeep, Hemi, Early Model, Each
Part Number: HLY-558-115
Not Yet Reviewed
Estimated Ship Date: May 19, 2026 if ordered today
Estimated Ship Date: May 19, 2026 if ordered today
EGR Valve, OE Replacement, Jeep, 3.8L, Each
Part Number: OMX-1771207
Not Yet Reviewed
Estimated Ship Date: Jul 28, 2026 if ordered today
Estimated Ship Date: Jul 28, 2026 if ordered today
Fuel Vapor Leak Detection Pump, Chrysler, Dodge, Jeep, Ram, Each
Part Number: SMP-LDP14
Estimated Ship Date: Today
Estimated Ship Date: Today
FILTER WRAP FOR KF-1057
Part Number: SBF-WF-1057
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Fuel Vapor Canister, EVAP System, Charcoal, Plastic, Black, 2 Ports, Jeep, Each
Part Number: RNB-911-342
Not Yet Reviewed
Estimated Ship Date: May 21, 2026 if ordered today
Estimated Ship Date: May 21, 2026 if ordered today
Fuel Filler Neck, Fuel Filler Neck Assembly
Part Number: RNB-574-031
Not Yet Reviewed
Estimated Ship Date: May 22, 2026 if ordered today
Estimated Ship Date: May 22, 2026 if ordered today
Intake Manifold Adapter, Adapts Small Port Engines for use with Holley Hi-Ram Intakes, 0.945 in. Thickness, Billet Aluminum, Mopar, Gen III Hemi, Kit
Part Number: HLY-300-652
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Throttle Body Unit, Chrysler 2009-08, Dodge 2010-08, Jeep 2010-08, Ram 2013-11, SRT 2014-13
Part Number: RNB-977-810
Not Yet Reviewed
Estimated Ship Date: May 21, 2026 if ordered today
Estimated Ship Date: May 21, 2026 if ordered today
Fuel Injector, OEM Replacement, Chrysler, Dodge, Jeep, Each
Part Number: SMP-FJ1058
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Air Intake Kit, Cold Air Intake, Black Plastic Tube, Red Cotton Gauze Oiled Filter, Pre-filter Bag, Jeep, Kit
Part Number: ROU-10554PF
Not Yet Reviewed
Estimated Ship Date: May 15, 2026 if ordered today
Estimated Ship Date: May 15, 2026 if ordered today
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster