Summit Racing SpeedCard - learn how to get 15% back up to $150

Summit Racing SpeedCard - learn how to get 15% back up to $150

It's the Season for Savings - Shop Holiday Deals Now!

Selected Filters


Loading...

Availability


EFI Kits, Fuel Injectors, Throttle Bodies & More

Individual Parts

Results 126 - 150 of 2000 +

Fuel Injector, 5.9L Cummins Diesel, Premium Performance Plus Fuel Injector, (0986435505) Dodge, 2004.5-07, Each

Part Number: BDD-1724505

Not Yet Reviewed

Estimated Ship Date: Dec 12, 2025 if ordered today

...Loading

Estimated Ship Date: Dec 12, 2025 if ordered today

Fuel Injector, 6.7L Cummins Diesel, Premium Performance Plus Fuel Injector, (0986435518) Dodge, 2007.5-12, Each

Part Number: BDD-1724518

Not Yet Reviewed

Estimated Ship Date: Dec 12, 2025 if ordered today

...Loading

Estimated Ship Date: Dec 12, 2025 if ordered today

Fuel Injector, 6.0L Duramax LMM Premium Performance PLUS Injector (0986435520) Chevy, GMC 2007-2010, Each

Part Number: BDD-1724520

Not Yet Reviewed

Estimated Ship Date: Dec 12, 2025 if ordered today

...Loading

Estimated Ship Date: Dec 12, 2025 if ordered today

Fuel Injector, 6.0L Duramax LBZ Premium Performance PLUS Injector (0986435521) Chevy, GMC 2006-2007, Each

Part Number: BDD-1724521

Not Yet Reviewed

Estimated Ship Date: Dec 12, 2025 if ordered today

...Loading

Estimated Ship Date: Dec 12, 2025 if ordered today

Fuel Rail Fitting, Crossover Line, GM Duramax Diesel, Each

Part Number: PPE-113073000

4.3 out of 5 stars ( 10 )

Estimated Ship Date: Tomorrow

...Loading

Estimated Ship Date: Tomorrow

Fuel Rail Fitting, Pressure Release Valve, Duramax Diesel, Chevy, GMC, LB7, Each

Part Number: PPE-113072800

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Tomorrow

...Loading

Estimated Ship Date: Tomorrow

Billet Fuel Rails

Part Number: FHF-FP-S550-BFR

Not Yet Reviewed

Estimated Ship Date: Dec 19, 2025 if ordered today

...Loading

Estimated Ship Date: Dec 19, 2025 if ordered today

O-Ring, Fuel Rail Component, Each

Part Number: PPE-113073001

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Tomorrow

...Loading

Estimated Ship Date: Tomorrow

Fuel Rail, complete, includes 1130710 and 1130720, GM Duramax 6.6L, 2004.5-10

Part Number: PPE-113076000

Not Yet Reviewed

Estimated Ship Date: Tomorrow

...Loading

Estimated Ship Date: Tomorrow

Fuel Injector O-rings, Manifold Adapter O-rings, Chevy, LS, Set of 8

Part Number: LPE-L700025305

4.57 out of 5 stars ( 7 )

...Loading

Engine Management System, Godzilla 7X, PCM, Air Cleaner Assembly, Sensors, Accelerator Pedal, Automatic Transmission, 10R80, Ford, Kit

Part Number: FMS-S0071

Not Yet Reviewed

Estimated Ship Date: Dec 26, 2025 if ordered today

...Loading

Estimated Ship Date: Dec 26, 2025 if ordered today

Throttle Body, Twin 60mm, Cast Aluminum, Natural, Ford, 5.4L, Each

Part Number: FMS-M-9926-MSVT

4.8 out of 5 stars ( 5 )

Estimated Ship Date: Dec 26, 2025 if ordered today

...Loading

Estimated Ship Date: Dec 26, 2025 if ordered today

Fuel Rails, Carbon pTR, Billet Aluminum, Red Anodized, -8 AN Fitting Size, with Stainless Steel Hardware, LS1/LS2/LS6, Cathedral Port, Chevy, Kit

Part Number: PCD-70463-0100RD

Not Yet Reviewed

Estimated Ship Date: Dec 1, 2025 if ordered today

...Loading

Estimated Ship Date: Dec 1, 2025 if ordered today

Check Valves, Direct Injection Fuel Line, Billet Aluminum, Black Anodized, -8AN Male Fittings, For High-Flow Applications, Universal, Each

Part Number: LPE-L750067414

5.0 out of 5 stars ( 1 )

...Loading

FUEL RAIL

Part Number: NAL-12602070

Not Yet Reviewed

Estimated Ship Date: Mar 12, 2026 if ordered today

...Loading

Estimated Ship Date: Mar 12, 2026 if ordered today

Throttle Body, MPI, 1 Venturi, 90.00mm, Billet Aluminum, Polished, Ford, 5.0L Modular, Each

Part Number: FMS-M-9926-M5090

1.0 out of 5 stars ( 1 )

Estimated Ship Date: Dec 3, 2025 if ordered today

...Loading

Estimated Ship Date: Dec 3, 2025 if ordered today

Throttle Bodies, Ported LT5, Aluminum, Natural, 95mm, Chevrolet, GMC, Each

Part Number: LPE-L270046914

5.0 out of 5 stars ( 1 )

...Loading

Throttle Body Spacer, Aluminum, Polished, Chevy, GMC, 4.3, 5.0, 5.7L, Each

Part Number: SPE-11252

4.17 out of 5 stars ( 6 )

Estimated Ship Date: Dec 17, 2025 if ordered today

...Loading

Estimated Ship Date: Dec 17, 2025 if ordered today

Throttle Body, MPI, 90.00mm, Cast Aluminum, Natural, Each

Part Number: NAL-12629992

Not Yet Reviewed

Estimated Ship Date: Mar 26, 2026 if ordered today

...Loading

Estimated Ship Date: Mar 26, 2026 if ordered today

Throttle Body Spacer, Smooth Bore, Aluminum, Natural, 1 in., Chevy, GMC, Pickup/SUV, Each

Part Number: TRD-2733

3.0 out of 5 stars ( 3 )

Estimated Ship Date: Jan 29, 2026 if ordered today

...Loading

Estimated Ship Date: Jan 29, 2026 if ordered today

Throttle Body, 70mm, Aluminum, Polished, Ford, Each

Part Number: FMS-M9926M2370B

Not Yet Reviewed

Estimated Ship Date: Dec 26, 2025 if ordered today

...Loading

Estimated Ship Date: Dec 26, 2025 if ordered today

Lightweight Billet Fuel Rail set for pTR LT, black

Part Number: PCD-70640-00-BK

Not Yet Reviewed

Estimated Ship Date: Tomorrow if ordered today

...Loading

Estimated Ship Date: Tomorrow if ordered today

Fuel Rails, Carbon pTR, Billet Aluminum, Red Anodized, -8 AN Fitting Size, with Stainless Steel Hardware, LT1/LT2 Port, Chevy, Kit

Part Number: PCD-70640-0000RD

Not Yet Reviewed

Estimated Ship Date: Dec 1, 2025 if ordered today

...Loading

Estimated Ship Date: Dec 1, 2025 if ordered today

Throttle Body Adapter, 90mm, Ford 5.0L Boss 302 Modular Intake Manifold, Billet Aluminum, Natural, Each

Part Number: FMS-M-9474-M50B

Not Yet Reviewed

Estimated Ship Date: Dec 26, 2025 if ordered today

...Loading

Estimated Ship Date: Dec 26, 2025 if ordered today

Fuel Injector, Replacement, Chevy, Pontiac, Saturn, Each

Part Number: NAL-12606110

Not Yet Reviewed

Estimated Ship Date: Feb 6, 2026 if ordered today

...Loading

Estimated Ship Date: Feb 6, 2026 if ordered today

Modal Header

Call To Order

This is a custom order part. You can order this part by Contacting Us.