Availability
Estimated Ship Date: Monday 10/6/2025
Choke Conversion Kit, Manual, Kit
Part Number: RNB-55101
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Carburetor Float, Center Hung, Brass, Quick Fuel, 4150, 4160, 4500, Each
Part Number: QFT-16-1QFT
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Installation Item, Adapter, Transmission Kickdown Linkage, Mopar, Vans, Kit
Part Number: EDL-8022
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Accelerator Cable, Black Jacket, Jeep, 258, Each
Part Number: CWA-J5357953
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Carburetor Spacer, Aluminum, 1 in. Thick, Open, Square Bore, Each
Part Number: TRD-2084
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Throttle Cable Bracket, Billet Aluminum, Red Anodized, Fits GM Cable, Each
Part Number: SUM-210241R
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Carburetor, E-85, Q-Series, 750 cfm, 4-Barrel, Mechanical, Down-Leg, Each
Part Number: QFT-Q-750-E85
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Carburetor Spacer, Aluminum, .375 in. Thick, Open, Square Bore, Each
Part Number: TRD-2063
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Carburetor Floats, Side Hung, Nitrophyl Material, for Model 2300, 4150, 4160, Ford, C1AE-9550-C, Carburetor, Each
Part Number: HLY-216-9
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Carburetor Jets, Gasoline, Brass, 1/4 in.-32, Sizes 70-80, Two of Each Size, Kit
Part Number: QFT-22-700QFT
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Air Bleeds, Replaceable, Screw-in, Brass, 0.065 in. Diameter, 10 in.-32 Thread, for 4150 HP, 4500 Models, 10-piece, Set
Part Number: HLY-126-65-10
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Cruise Control Kit, Bracket, Hardware, for Performer, Performer AVS, and Thunder Series AVS, Chevy, GMC, Kit
Part Number: EDL-1484
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Carburetor Main Body, Replacement, Holley, 650, Double Pumper, Mechanical Secondaries, No Air Horn, Each
Part Number: PRO-67203
Carb Idle Mixture Screw, Steel, Cadmium Plated, Each
Part Number: QFT-15-3QFT
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Accelerator Cable, Black Plastic Jacket, 29.100 in. Length, Each
Part Number: ATP-Y755
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Carburetor Rebuild Kits, Holley, Marine Carburetor, Renew Kit, Instructions, Parts, Hardware, Gaskets, for R84050, Kit
Part Number: HLY-703-60
Estimated Ship Date: Oct 20, 2025 if ordered today
Estimated Ship Date: Oct 20, 2025 if ordered today
Throttle Return Springs, Dual, Chrome, Pair
Part Number: GAR-09012
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Throttle Cable, Midnight Series, Black Vinyl, Black Fittings, 36 in. Long, Carbureted, Universal, Each
Part Number: LOK-XTC-1000U36
Not Yet Reviewed
Estimated Ship Date: Oct 16, 2025 if ordered today
Estimated Ship Date: Oct 16, 2025 if ordered today
Carburetor Spacers, 2-Hole, 0.500 in. Thickness, Phenolic Plastic, Black, Ford, Kit
Part Number: BDR-HR-9447-B
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Carburetor, Remanufactured, 1-Barrel, Jeep, Each
Part Number: URM-16-1639
Estimated Ship Date: Dec 5, 2025 if ordered today
Estimated Ship Date: Dec 5, 2025 if ordered today
Carburetor, E-85, QFX-Series, 4500, 1,050 cfm, 4-Barrel, Dominator Flange, 1.710 in. Venturi, Each
Part Number: QFT-FX-4710-E85
Not Yet Reviewed
Need It Sooner? We recommend these similar substitute parts:
Estimated Ship Date: Monday 10/6/2025
Carburetor, Marine, 650 cfm, 4-Barrel, Spread Bore, Single Inlet, Natural, Universal Style Linkage, Each
Part Number: JET-33002
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Carburetor Accelerator Pumps, OE-style Replacement, Rochester, Each
Part Number: SMP-R64-358
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Carburetor Linkage Rod, 1/4 in.-28 Thread, Steel, Zinc Plated, Quick Release Rod Ends, 26.00 in. Length, Kit
Part Number: AAF-ALL54171
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.