Summit Racing SpeedCard - learn how to get 10% back up to $100

Summit Racing SpeedCard - learn how to get 10% back up to $100

Haul in the Savings - Shop the Truck Savings Event Today!

10 Results Found For "Mopar Performance M1 Intake Manifolds"

Individual Parts

Results 1 - 10 of 10

Manifold, Intake, Composite Plastic, Chrysler, Dodge, Jeep, V6, Each

Part Number: MOP-05281803AA

5.0 out of 5 stars ( 10 )

Estimated Ship Date: Monday 9/22/2025

...Loading

Estimated Ship Date: Monday 9/22/2025

Intake Manifold Runner Control Valve, Plastic, Chrysler, Dodge, Ram, Each

Part Number: RNB-911-933

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 9/22/2025

...Loading

Estimated Ship Date: Monday 9/22/2025

Intake Manifold Runner Control Valve, Plastic, Chrysler, Dodge, 3.5L, Each

Part Number: RNB-911-904

4.0 out of 5 stars ( 4 )

Estimated Ship Date: Oct 13, 2025 if ordered today

...Loading

Estimated Ship Date: Oct 13, 2025 if ordered today

Throttle Body Spacer, Billet Aluminum, Black Anodized, Dodge, 6.2L Hellcat, Each

Part Number: SNO-40068

Not Yet Reviewed

Estimated Ship Date: Oct 8, 2025 if ordered today

...Loading

Estimated Ship Date: Oct 8, 2025 if ordered today

2009-2014 Challanger/Charger RT Injection Plate

Part Number: SNO-40073

Not Yet Reviewed

Estimated Ship Date: Oct 8, 2025 if ordered today

...Loading

Estimated Ship Date: Oct 8, 2025 if ordered today

Fuel Rails, Aluminum, Orange Anodized, Dodge, 5.7L, 6.1L, Kit

Part Number: BBK-5019

2.5 out of 5 stars ( 2 )

Estimated Ship Date: Monday 9/22/2025

...Loading

Estimated Ship Date: Monday 9/22/2025

Elec. Throttle Body

Part Number: HTA-ETB0040

Not Yet Reviewed

Estimated Ship Date: Monday 9/22/2025

...Loading

Estimated Ship Date: Monday 9/22/2025

Fuel Pressure Regulator, Replacement, Dodge, 3.7, 3.9, 4.7, 5.2, 5.9L, Each

Part Number: SMP-PR323

Not Yet Reviewed

Estimated Ship Date: Oct 8, 2025 if ordered today

...Loading

Estimated Ship Date: Oct 8, 2025 if ordered today

Elec. Throttle Body

Part Number: HTA-ETB0062

5.0 out of 5 stars ( 2 )

Estimated Ship Date: Oct 3, 2025 if ordered today

...Loading

Estimated Ship Date: Oct 3, 2025 if ordered today

Fuel Injection - Pressure Regulator

Part Number: SMP-PR324

Not Yet Reviewed

Estimated Ship Date: Monday 9/22/2025

...Loading

Estimated Ship Date: Monday 9/22/2025

  • 1
  • Page 1 of 1

Modal Header

Call To Order

This is a custom order part. You can order this part by Contacting Us.