Availability
Lifter; Short Travel Race Hydraulic Roller Lifter; 16 pc.; Drop In; REM-Surfaces; Black Oxided
Part Number: CCA-15850-16
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Harmonic Balancer, External Balance, Steel, Black, Chevy/GMC, Diesel V8, with Damper 800141 and Keyway Ring Adapter, Kit
Part Number: FLU-800191
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Harmonic Balancer, External Balance, Steel, Black, Ford/Mercury, Small Block, Each
Part Number: FLU-650221
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Camshaft Kit, Pro LS, Hydraulic Roller Tappet, Advertised Duration 275/288, Lift .600/.600, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8707-1
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Valve Cover, Tall, Aluminum, Polished, Finned, Offenhauser Logo, Ford, L6, Each
Part Number: OFY-6280-HR
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Harmonic Balancer, Supercharger Super Damper, Internal Balance, Steel, Black, Chevy, GMC, Small Block LS, Each
Part Number: ATI-917285
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Pro LS 2618 Forged Piston, 4.070 bore, 1.326 C.H., 2cc Dome, Std. Stroke, Full Float Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.2L LS3 L92 LS9, Set of 8
Part Number: SUM-3269434070-2
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Harmonic Balancer, Super Damper, Internal Balance, Steel, Dodge, Cummins Diesel, Each
Part Number: ATI-917374
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Pro LS 2618 Forged Piston, 4.070 bore, 1.326 C.H., 12cc Dish, Std. Stroke, Full Float Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.2 LS3 L92 LS9, Set of 8
Part Number: SUM-326943407012
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Rocker Arms, Ultra Pro Magnum, Full Roller, 1.8 Ratio, Chromoly Steel, Pedestal Mounting, Chevy, Set of 16
Part Number: CCA-1677-16
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Pro LS 2618 Forged Piston, 4.065 bore, 1.110 C.H., 21cc dish, 4.000in. Stroke, 6.125 Rod, NA/Boost/Nitrous, Cathedral/Rect., 6.2 LS3 L92 LS9, Set of 8
Part Number: SUM-110927406521
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Cam and Lifter kit, Pro LS Truck Torkinator. 200/205 Dur., 113+4, .550/.550 Lift, 3-bolt, 4.8 5.3 5.7 6.0 6.2, 7.0 Each
Part Number: SUM-K8727R1
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Harmonic Balancer, Internal Balance, Steel, Black, Dodge, Cummins Diesel, Each
Part Number: FLU-960341
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Cam/Lifters/Valvetrain, Hydraulic Flat Tappet, Adv. Duration 254/262, Lift .505/.505 in., Chevy, Big Block
Part Number: CCA-K11-231-3
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Harmonic Balancer, Internal Balance, Steel, Black, Ford/Lincoln/Mercury, Big Block, FE/385 Series, Each
Part Number: FLU-720201
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Camshafts, BTR, Truck Norris, 1,500-6,400 RPM Range, 222 int/234 exh Duration, 0.641 int./0.644 exh. Lift, 110 LSA, 1-Bolt, Ford, 7.3L, Godzilla, Each
Part Number: BTC-BTR-GZTN
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Pro LS 2618 Forged Pistons. 3.820 bore, 1.299 C.H., 2cc dome, Std. Stroke, .6.125 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-2999273820-2
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Harmonic Balancer, Serpentine, Internal Balance, Aluminum/Steel, Dual Keyway, Black Anodized, SFI 18.1, Ford, 5.0L Modular
Part Number: ATI-918048
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Camshaft, Hydraulic Roller Tappet, Advertised Duration 260/264, Lift .522/.525, Mopar, 5.7/6.1L, Hemi, Each
Part Number: CCA-112-500-11
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Cam and Lifter kit, Stage 2 Pro LS Cam, Pro LS Turbo Cam. 226/230 Dur., .600/.575 Lift, 113+4 Lobe Sep. , 5.3, 5.7, 6.0, 6.2, LS1,2,6,3,LSX, Each
Part Number: SUM-K8706R1
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Combo, Oil Pan, Black Zinc, Pickup, High-Volume Pump, Shaft, Tray, Scraper, Gaskets, Chevy, Big Block, Kit
Part Number: SUM-PANKIT16
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Cam/Lifter, Valvetrain, Hydraulic Flat Tappet, Advertised Duration 254/262, Lift .447/.462, Chevy Small Block
Part Number: CCA-K12-235-2
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Camshaft, Hydraulic Roller Tappet, Advertised Duration 335/339, Lift .625/.639, Chevy, Big Block, Each
Part Number: EDL-2261
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Cylinder Heads, Remanufactured, Assembled, Aluminum, Natural, Left, Chrysler, Dodge, Jeep, Ram, 5.7L, Each
Part Number: VRE-2DM2L
Not Yet Reviewed
Estimated Ship Date: Nov 10, 2025 if ordered today
Estimated Ship Date: Nov 10, 2025 if ordered today
Oil Pans, Holley, GM K10, LT Engine Swap, 4WD Truck, Off-Road, OE Fit, Aluminum, Natural, with Pick-up Tube, O-ring, Sump Baffle, Filter Stud, Each
Part Number: HLY-302-24
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.