Availability
Rollover Vent Valve, Remote, Aluminum, Natural, 5/16 in. Barb, Each
Part Number: TNK-VVR
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Fuel Tank Transfer Hose, Black, Rubber, Straight, Each
Part Number: TNK-GH-2
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Fuel Fitting, Quick-Connect, Chevy LS, LT, Ford Coyote, Aluminum, Black Anodized, Straight, 3/8 in., -6 AN, Each
Part Number: TNK-640853
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Fuel Vent Lines, 5/16 in. 5 ft. Length, Spiral Reinforced Rubber, Approved for Gasoline and Ethanol, Black, Each
Part Number: TNK-VH516-5
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Rollover Vent Valve, Brass, Natural, Each
Part Number: TNK-VV
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Fuel Tank Vent Valve, Plastic, White, Ford, Jeep, Each
Part Number: TNK-EMSV-2
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Seat Plate Anchor Plates, Steel, Zinc Plated, Hardware, Kit
Part Number: TNK-SBAP
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Fitting, Adapter, Inverted Flare to NPT, Straight, Brass, Natural, 3/8 in., 5/16 in., Each
Part Number: TNK-BF56
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Fuel Filter, Inline, 60 psi Maximum, 10 microns, Steel Housing, Element, 3/8 in. Quick Connect Inlet/Outlet, Each
Part Number: TNK-FF-10
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Fuel Rail Fitting, Steel, Zinc, Straight, 3/8 in., -6 AN, Each
Part Number: TNK-640940
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Fuel Rail Fitting, Aluminum, Black, Straight, 5/16 in., -6 AN, Each
Part Number: TNK-640863
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Fitting, Adapter, Inverted Flare to NPT, Straight, Brass, Natural, 3/8 in., 3/8 in., Each
Part Number: TNK-BF66
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Gauge, Fuel Pressure, 0-100 psi, 1 1/2 in., Analog, Mechanical, Each
Part Number: TNK-PG-100
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Bulkhead Fittings, 3/8 in. Hose Barb to 3/8 in. Hose Barb, Includes Washer and Nut, Aluminum, Natural, Each
Part Number: TNK-BH-38
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Fuel Tank Transfer Hose, Black, Rubber, Straight, Each
Part Number: TNK-GH-225
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Fuel Tank Filler Neck, Bolt-on, 70 degree Angle, Steel, Zinc Plated, 2.00 in. O.D., Each
Part Number: TNK-FN-PT
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Fuel Tank Cap, Twist On, Steel, Chrome, 2 9/32 in. GM Style, Each
Part Number: TNK-TC
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Gasket, Filler Neck, Viton®, 3.250 in. O.D., 2.250 in. I.D., 6 Hole, Each
Part Number: TNK-3G-V-OR
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
6-HOLE THREADED MOUNTING RING 3 1/4 in. DIAMETER
Part Number: TNK-3TR
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Fuel Tank Split Ring, 5-Bolt, Stainless Steel, Each
Part Number: TNK-SR-SS
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Fuel Coupler, 90 Degree Bend, 2.0 in. O.D., Steel, Black, Each
Part Number: TNK-FC-90
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Hose Coupler, Reducer, Steel, Black E-Coated, 1.50 in. O.D. to 2.00 in. O.D., Each
Part Number: TNK-FC-1520
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Fuel Filler Neck, Steel, Galvanized, 2.00 in. Tall, 2.00 in. Outside Diameter, Each
Part Number: TNK-FN-2
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Fuel Level Sending Unit Component, Gasket, Nitrile Rubber, 6-Hole, Each
Part Number: TNK-3G-T-KIT
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Fuel Sender Gasket, Viton®, 5 Hole, 1.800 in. I.D., 2.620 in. O.D. Each
Part Number: TNK-SG-V-OR
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.