Availability
Main Bearings, Bi-Metal, Silicon Aluminum, Standard Size, GM Gen III/IV LS, Set of 5
Part Number: SUM-172300
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Paint, Single Stage, UV Stable, Acrylic Urethane, Gloss, Black, Low VOC, 1 Gallon, Each
Part Number: SUM-UP300G
Cannot be shipped Internationally
Cannot be shipped Internationally
Big Block Chevy Cylinder head, Aluminum, 335cc Rectangle Intake Runner, 122cc Chamber, 2.250 Intake Valve 1.880 Exhaust Valve, Max .725 Lift Ea.
Part Number: SUM-162BBCREC335
Not Yet Reviewed
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Turbocharger, S475 Turbo, 75mm Inducer Size, 96mm Exducer Size, T6 Twin Scroll, 1.32 A/R, Journal Bearing, Each
Part Number: SUM-260050
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Headers, Long Tube, 1-5/8 in. Primaries, 3.0 in. Collectors, 304 Stainless Steel, Chevy, Small Block, Pair
Part Number: SUM-G9101-SS
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Hose End, PTFE, Straight, Reusable Swivel, -6 AN Female Thread, -6 AN Hose, Aluminum, Black, Each
Part Number: SUM-250690B
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Lowering Springs, Rear, Black, 3 in. Drop, Chevy, GMC, Pickup, SUV, Each
Part Number: SUM-708205
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Tubing, Fuel and Brake Hard Line, 316L Stainless Steel, Polished, 3/16 in. x 25 ft., Each
Part Number: SUM-220205-25X
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Timing Chain and Gear Set, True Double Roller, Billet Steel, 3 Bolt, No Cam Sensor, Chevy, LS Series, Set
Part Number: SUM-G6602R-B
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Exhaust Tubing, Straight, 3 in. Diameter, 45 in. Length, 16-Gauge, Steel, Aluminized, Each
Part Number: SUM-640253
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Radiator, Performance Fit, 4-Row, Aluminum, Polished, Ford, Small Block, Big Block, Each
Part Number: SUM-384033
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Fitting, Hose End, 90 Degree, -8 AN Hose to Female -8 AN, Aluminum, Black Anodized, Each
Part Number: SUM-220887B
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Paint, High-Solids, Acrylic Urethane, Gloss, Clear Coat, 1 Gallon, Each
Part Number: SUM-UP200G
Cannot be shipped Internationally
Cannot be shipped Internationally
Distributor, Magnetic Pickup, Mechanical Advance, Black Cap, Chevy, Big/Small Block V8, Each
Part Number: SUM-850050
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Hose, Braided Nylon, Black, -10 AN, 20 ft. Length, Each
Part Number: SUM-240020B
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Crossover Pipe, X-Pipe, Steel, Aluminized, 2.5 in. Diameter, Universal, Kit
Part Number: SUM-642125
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Flexplate, 168-Tooth, External Engine Balance, 1-Piece Rear Main Seal, SFI 29.1, Chevy, V6/V8, Each
Part Number: SUM-G104SFI
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Hose, Braided Stainless Steel, -8 AN, 20 ft. Length, Each
Part Number: SUM-230820
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Pro LS 4340 Forged Steel Crank, 4.000 Stroke, 58X Reluctor, Lightened Rod Journals and Gun-drilled Mains, Std. 6-bolt Flange, Internal balanced, LS3
Part Number: SUM-180LS400058X
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Staging Lock, Line Lock, 1/8 in. NPT Inlet/Outlet, Blue Anodized Body, Stainless Steel, Kit
Part Number: SUM-760000
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Cleaning Solution, Evaporust, Rust Remover, 5 Gallon, Each
Part Number: SUM-ER013
Cannot be shipped Internationally
Cannot be shipped Internationally
LS Coolant Steam Crossover Kit, Four Corner LS Steam Vent Kit, Stainless Steel Hardlines with Black Anodized Steam Port Adapters, Chevy, LS, Kit
Part Number: SUM-220959X
Not Yet Reviewed
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Paint, Chassis, Enamel, Semi-Gloss, Black, 16 oz., Aerosol, Each
Part Number: SUM-SP1402
Cannot be shipped Internationally
Cannot be shipped Internationally
Cam and Lifter kit, Pro SBC Stage 1 Hyd. Roller Cam, 204/214 Dur., 112 LSA + 1 Adv, .450/.450 1.5 Ratio, Idle-5800 Range, '87-02 Gen 1 Roller Block
Part Number: SUM-K8800
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Disc Brakes, Front, 11 in. Diameter Rotors, Solid, Vented, 1-Piston Calipers, Chevy, GM, Kit
Part Number: SUM-BK1500
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.