Availability
Pro LS Piston and Rod Kit, 370 Cid., 4.030 bore, 3.622 stroke, 6.098 rod, 2cc Flat Top, 10.9:1 @ 65cc, 10.3:1 @ 70cc, File-Fit Rings
Part Number: SUM-PR360302
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Dash Pad, 1981-87 Chevy/GMC Truck, Black, Original Design, Foam Backed Vinyl, Repl GM#14023020, Best Quality, Each
Part Number: SUM-RP23562
Not Yet Reviewed
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Exhaust and Header Wrap Kit, Fiberglass Composite, Black, 2 in. Wide x 100 ft. with Stainless Steel Locking Ties, Kit
Part Number: SUM-350126B-K
Not Yet Reviewed
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Distributor, Blueprinted HEI, Adjustable Vacuum Advance, Corvette Tach Drive, Black Cap, Chevy, Big/Small Block, Each
Part Number: SUM-850001-T
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Racing Harness, Latch and Link, 5-Point, SFI 16.1 Safety Rating, 3 in. Width, Black/Red, Universal, Each
Part Number: SUM-510300
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Heater, Automotive, Nylon, Black, 300 cfm, 40,000 BTU, Each
Part Number: SUM-991106
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Carpet, Passenger Area, Cut Pile, Black, Chevy, GMC, 81-86 C-10, Each
Part Number: SUM-461036
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Engine Stand, H-Shape, Weight Capacity 1,000 lbs., 63:1 Geared, 360 Degrees head, Steel, Red Painted, Each
Part Number: SUM-908300GA
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Creeper, Creeper Seat, Black, Steel Frame, Ball Bearing Casters, Kit
Part Number: SUM-G1080
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Torque Converter, 10 in. Diameter, Billet Cover, Powerglide, TH350, TH400, 3,200-3,500 Stall, Each
Part Number: SUM-700361-BC
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Exhaust Tubing, 180 Degree, Mandrel U-Bend, 2-1/2 in. Diameter, Steel, Aluminized, Each
Part Number: SUM-623032
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Radiator, Performance Fit, 3-Row, Aluminum, Polished, Ford, Each
Part Number: SUM-384024
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Intake Manifold, Fuel Injected, Tall Profile, 92mm Bore Size, Aluminum, Black, Chevy, LS1, LS2, LS6, Each
Part Number: SUM-226122B-G2
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Fuel System Plumbing Kit, Fuel Pump to Fuel Cell, -8 AN Braided Flex Line, 20 ft. Length, Kit
Part Number: SUM-PUMPKIT3
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Headers, Long Tube, Steel, Ceramic Coated, Dodge, Plymouth, 273, 318, 340, 360, Pair
Part Number: SUM-G9140
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Exhaust Pipe Kit, Header-Back, Weld-Up, 409 Stainless Steel, Natural, 2.25 in. Diameter, Universal, Kit
Part Number: SUM-670240
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Combo, Aluminum, Cylinder Heads, Manifold, Cam/Lifters 528/539, Gaskets, Bolts, SB Chevy
Part Number: SME-K-415-405
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Rocker Arms, Stud Mount, Full Roller, Aluminum, 1.7 Ratio, Fits 7/16 in. Stud, Chevy, Big Block, Set of 16
Part Number: SUM-G6930B
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Engine Bag, Plastic, Clear, Each
Part Number: SUM-G1009
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Pipe Plugs, Stainless Steel, Allen Head, Two 1/8 in. NPT, Two 1/4 in. NPT, Two 1/2 in. NPT, Two 3/8 in. NPT, Kit
Part Number: SUM-921010
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Valve Cover Gaskets, Rubber with Steel Core, Chevy, Big Block, Pair
Part Number: SUM-G2311
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Timing Chain and Gear Set, Adjustable, Billet Steel, Single Roller, 3-Bolt, 1X, Standard Spacing, LS, Kit
Part Number: SUM-G6645-1X
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Engine Rebuild, Hypereutectic Flat, 4.000 in. Bore, Standard Rod Bearings, Standard Main Bearings, Chevy, 350, Kit
Part Number: SUM-SBCKIT3-000
Cannot be shipped Internationally
Cannot be shipped Internationally
Pro SBC Retrofit Stage 3 Hyd. Roller LS Firing Order Cam, 224/232 Dur., 110 LSA + 2 Adv, .550/.540 1.5 Ratio, .587.576 1.6 Ratio, 2000-6300 RPM Range
Part Number: SUM-1223
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Hose, Braided Stainless Steel, -6 AN, 10 ft. Length, Each
Part Number: SUM-230610
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.