Availability
Summit Racing Performance, Restoration & Replacement Parts & Tools
Throttle Body, 102mm Bore Size, MPI, Billet Aluminum, Black Anodized, Chevy, LS, Each
Part Number: SUM-227102B
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Flexplate, 168-Tooth, External Engine Balance, 2-Piece Rear Main Seal, SFI 29.1, Chevy, 454, Each
Part Number: SUM-G102SFI
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Intake Manifold, Fuel Injected, Low Profile, 92mm Bore Size, Aluminum, Black, Chevy, LS1, LS2, LS6, Each
Part Number: SUM-226127B-G2
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Rocker Arms, Stud Mount, Roller Tip, Grooved Pivot Balls, Stamped Steel, 1.5 Ratio, Fits 3/8 in. Stud, Chevy, Small Block, Set of 16
Part Number: SUM-141506
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pipe Plugs, Stainless Steel, Allen Head, Two 1/8 in. NPT, Two 1/4 in. NPT, Two 1/2 in. NPT, Two 3/8 in. NPT, Kit
Part Number: SUM-921010
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pro LS 2618 Forged Pistons. 3.780 bore, 1.326 C.H., 7cc dish, Std. Stroke, .945 pin Press or Float, NA/Boost/Nitrous, Coated, 4.8L 5.3L Vortec Truck
Part Number: SUM-326945780-7P
Not Yet Reviewed
Estimated Ship Date: Apr 6, 2026 if ordered today
Estimated Ship Date: Apr 6, 2026 if ordered today
Automatic Transmission Rebuild Kit, Kolene Steels, GM, TH350, Non-Lockup, 30-Spline, Kit
Part Number: SUM-705020
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Hose, Braided Nylon, Black, -12 AN, 20 ft. Length, Each
Part Number: SUM-240220B
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Oil Pan, Steel, Black Zinc, 6 qt., Chevy, Big Block, Each
Part Number: SUM-G3605
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Bushing, Transmission Mount, Polyurethane, Gray, GM, Each
Part Number: SUM-7731108
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Control Arms, Tubular, Steel, Black Powdercoated, Front Lower, Chevy, 73-87 C-10, 2WD, Pair
Part Number: SUM-770255L
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Brake Line Flaring Tool, Single, Double, Bubble, 37/45-Degree Flare, Professional, Kit
Part Number: SUM-900307
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Spark Plug Boot Protector, 8 in., Black, Set of 8
Part Number: SUM-350140BLK
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Headers, Shorty, Steel, Painted, GM Car with Chevy, Small Block, Pair
Part Number: SUM-G9005
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Sound Deadener, Heat Barrier, Sheet Type, Self-Adhesive, 32.0 in. x 18.0 in. x 0.070 in., Set of 5
Part Number: SUM-879024
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Ring Compressor, Aluminum, Black Anodized, 4.030 in. Bore, Each
Part Number: SME-904030
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Water Pump, Mechanical, Long, High-volume, Clockwise, Aluminum, Natural, Chevy, Big Block, Each
Part Number: SUM-310126
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Master Cylinder, Power Brake Conversion, Dual Bowl, Cap, Reservoir, Booster, Chevy, GMC, Truck, Kit
Part Number: SUM-760197
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Crossmember, Transmission, Steel, Black, GM, TH200/TH350/M-21/M-22/Powerglide/Saginaw/Super T-10, Each
Part Number: SUM-770300
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Freeze Plugs, Brass, Chevy, Small Block, Kit
Part Number: SUM-G1581
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Automatic Transmission Rebuild Kit, GM, TH350, Non-Lockup, 30-Spline, Kit
Part Number: SUM-705000
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Fuel Pump, Electric, External, 255 lph, 60 psi, Universal, Each
Part Number: SUM-251000
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Fuel Tank, Steel, Silver, 25 Gallon, No Vent Tube, 88-2000, Chevy PU, Front, Each
Part Number: SUM-255022
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Engine Cradle, Dolly,Stand, 2-Piece, Heavy Duty, 850 lbs. Capacity, Steel, Black Powdercoated, 3 in. Casters, GM LS, Kit
Part Number: SUM-918032
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Timing Cover, 1-Piece, Aluminum, Polished, Chevy, Small Block, Kit
Part Number: SUM-G6300W
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster