Availability
Summit Racing Performance, Restoration & Replacement Parts & Tools
Headers, Long Tube, Steel, Painted, Ford, Pickup, Suv, 351M, 400, Pair
Part Number: SUM-G9034
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Creeper, Creeper Seat, Black, Steel Frame, Ball Bearing Casters, Kit
Part Number: SUM-G1080
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Creeper, High-Top, 45.00 in. to 66.00 in. Height, 400 lb. Capacity, Foldable, Steel, Black Powdercoated, Each
Part Number: SUM-G1083
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Valve Cover Gaskets, Rubber with Steel Core, Chevy, Big Block, Pair
Part Number: SUM-G2311
Estimated Ship Date: Mar 26, 2026 if ordered today
Estimated Ship Date: Mar 26, 2026 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Headers, Long Tube, Steel, Ceramic Coated, Dodge, Plymouth, 383, 400, 426, 440, Pair
Part Number: SUM-G9141
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Engine Cradle, Dolly, Stand, 2-Piece, Heavy Duty, 850 lbs. Capacity, Steel, Black Powdercoated, 3 in. Casters, Small Block, Ford, Kit
Part Number: SUM-918034
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Engine Oil Dipstick with Tube, Driver Side, Engine Block Entry, Steel, Black Powdercoated, Chevy, Small Block, Each
Part Number: SUM-G3865B
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Steering Column, Tilt, Floor Shift, No Key, Stainless Steel, Black Powdercoated, 2 in. Diameter, 30.0 in. Length, Each
Part Number: SUM-771713B-NK
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Exhaust Hanger, Weld On, Stainless Steel, 2.50 in. Diameter Pipe, Silicone Grommet, Each
Part Number: SUM-610331
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Driveshaft Safety Loop, Bolt-On, Adjustable, Steel, Black Powdercoated, Universal, Each
Part Number: SUM-G7900
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Engine Lift Plate, LS< Series GM, Gen III,IV,V, Steel, .250 in., Red Powdercoat, Each
Part Number: SUM-G1044R
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Transmission Jack, Hydraulic, 1,000 lb. Capacity, 7.70 in. to 23.40 in. Lift Range, Steel, Each
Part Number: SUM-917057
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Oil Pan, Steel, Black Zinc, 6 qt., Chevy, Small Block, Each
Part Number: SUM-G3600
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Transmission Crossmembers, Steel, Black Powdercoated, Chevy, GMC, Each
Part Number: SUM-770282
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Frame Brace, Chassis Stiffening Kit, Steel, 63-72 C10, Short Bed, 115 in. Wheelbase., Bolt-In, Chevy, GMC, Kit
Part Number: SUM-770820
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Headers, Long Tube, Steel, Ceramic Coated, Pontiac, 326-455, D-Port, Pair
Part Number: SUM-G9120
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Brake Booster, Steel, Black, Dual Diaphragm, 8 in. Diameter, Each
Part Number: SUM-760122-BLK
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Headers, Long Tube, Steel, Painted, Ford, Small Block, Pair
Part Number: SUM-G9032
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Summit Chevy LS 4340 Forged Steel Crankshaft, 3.622 stroke, 58X Reluctor, Gun-drilled and Lightened, Nitride Hardened, Narrowed Rod Bearings Req.
Part Number: SUM-180LS362258
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Engine Cradle, Dolly, Stand, 2-Piece, Heavy Duty, 850 lbs. Capacity, Steel, Black Powdercoated, 3 in. Casters, SBC, Kit
Part Number: SUM-918030
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Frame Brace, Chassis Stiffening, Steel, Natural, 64-67 GM A-Body, Weld In, Kit
Part Number: SUM-770830
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Headers, Long Tube, Steel, Painted, Chevy, Big Block, Pair
Part Number: SUM-G9010
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Automatic Transmission Rebuild Kit, Kolene Steels, GM, TH400, Non-Lockup, 30-Spline, Kit
Part Number: SUM-705021
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Headers, Long Tube, Steel, Painted, Ford, Mercury, 5.0L, Pair
Part Number: SUM-G9030
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
1997-03 GM Gen.3 LS Head Bolts, Zinc Plated, Steel, Hex, Torque To Yield, Kit
Part Number: SUM-910210
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster