Availability
Summit Racing Performance, Restoration & Replacement Parts & Tools
Pro LS 4340 Rotating Assembly, 346 Cid., 3.898 bore, 3.622 stroke, 24X, 6.098 rod, 3cc dome, 11:1 @ 65cc, 10.6:1 @ 68cc, File-Fit ring, H Bearings
Part Number: SUM-R24368983
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Oil Pan, Clear Zinc, Pan, Baffled, Pickup, Standard-Volume Pump, Chevy, Small Block, Kit
Part Number: SES-3-60-08-350
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro LS 4340 Rotating Assembly, 359 Cid., 3.780 bore, 4.000 stroke, 58x, 6.125 rod, 5cc dish, 10.9:1 @ 61cc, 10.4:1 @ 65cc, File-Fit Rings, H Bearings
Part Number: SUM-R58407805
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro LS 4340 Rotating Assembly, 347 Cid., 3.903 bore, 3.622 stroke, 24X, 6.098 rod, 3cc dome, 11:1 @ 65cc, 10.6:1 @ 68cc, File-Fit ring, H Bearing
Part Number: SUM-R24369033
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Buffing Polishing and Applicator Pads, Polishing/Finishing, 5.5 in. Diameter, 7/8 in. Thickness, Foam, Hook & Loop, Waffle Design, Each
Part Number: SUM-960072
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Heater Cores, Classic OEM, Copper/Brass, Natural, Chevrolet, GMC, Each
Part Number: SUM-382191
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Welder Replacement Parts, Circuit Board, Tig Welder Bottom Board, Fits SUM-900935, Each
Part Number: SUM-900935-3
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Power Tools, 20V, Grease Gun, 16 oz. Capacity, Dispenses 9.5 oz./min, Flexible Hose 32", 10,000 PSI, Each
Part Number: SUM-900590
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Paint, 2-Stage, Base Coat, Urethane, Gunmetal Metallic, 1 Quart, Each
Part Number: SUM-SWBC523Q-12
Not Yet Reviewed
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Pro LS 4340 Rotating Assembly, 347 Cid., 3.903 bore, 3.622 stroke, 24X, 6.125 rod, 7cc dish, 9.7:1 @ 65cc, 9.4:1 @ 68cc, File-Fit Rings, H Bearings
Part Number: SUM-R2436L9037
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro LS 4340 Rotating Assembly, 370 Cid., 4.030 bore, 3.622 stroke, 58x, 6.098 rod, 12cc dish, 9.7:1 @ 65cc, 9.3:1 @ 70cc, File-Fit Rings, H Bearings
Part Number: SUM-R583603012
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro LS 4340 Rotating Assembly, 346 Cid., 3.898 bore, 3.622 stroke, 58x, 6.098 rod, 3cc dome, 11:1 @ 65cc, 10.6:1 @ 68cc, File-Fit Rings, H Bearings
Part Number: SUM-R58368983
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro LS Rotating Assembly, 330 Cid., 3.810 bore, Standard 3.622 stroke, 24X, 6.098 rod, 7cc dish, 9.8:1 @ 61cc, 9.4:1 @ 65cc, File-Fit ring, H Bearings
Part Number: SUM-R24368107
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Palm Sander, Professional, Composite, Random Orbital, Self Vacuuming, 6 in. Variable speed, Each
Part Number: SUM-90010
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro LS 4340 Rotating Assembly, 377 Cid., 4.070 bore, 3.622 stroke, 58x, 6.125 rod, 2cc dome, 11.6:1 @ 65cc, 11:1 @ 70cc, File-Fit Rings, H Bearings
Part Number: SUM-R5836L0702
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Fuel Injection, MAX EFI LS 750 KIT (LS3), Tall Profile, 102mm Throttle Body, Satin, Kit
Part Number: SUM-240512-T102S
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Kids Ride On Toy, CAT HOLLAND, Tractor Trailer Foot To Floor, Yellow, Max Weight 55 lbs, Ages 1-3 Years, Each
Part Number: DTD-FR4040
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Polisher, 7 in. 20V. Brushless, Variable Speed, 500-3,000 RPM. Digital Display, Spindle Lock, 4.0 ah Battery, Kit
Part Number: SUM-900586-TB4
Not Yet Reviewed
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Pro LS 4340 Rotating Assembly, 365 Cid., 4.005 bore, 3.622 stroke, 58x, 6.098 rod, 12cc dish, 9.6:1 @ 65cc, 9.2:1 @ 70cc, File-Fit Rings, H Bearings
Part Number: SUM-R583600512
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Buffing Polishing and Applicator Pads, Compounding, 5.5 in. Diameter, 7/8 in. Thickness, Foam, Hook & Loop, Waffle Design, Each
Part Number: SUM-960070
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Heater Cores, Classic OEM, Copper/Brass, Natural, Mazda, Each
Part Number: SUM-382235
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro LS 4340 Rotating Assembly, 346 Cid., 3.898 bore, 3.622 stroke, 58x, 6.125 rod, 7cc dish, 9.7:1 @ 65cc, 9.4:1 @ 68cc, File-Fit Rings, H Bearings
Part Number: SUM-R5836L8987
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro LS 4340 Rotating Assembly, 346 Cid., 3.898 bore, 3.622 stroke, 58x, 6.125 rod, 3cc dome, 11:1 @ 65cc, 10.6:1 @ 68cc, File-Fit Rings, H Bearings
Part Number: SUM-R5836L8983
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro LS Rotating Assembly, 370 Cid., 4.030 bore, 3.622 stroke, 58x, 6.098 rod, 2cc Flat Top, 10.9:1 @ 65cc, 10.3:1 @ 70cc, File-Fit Rings, H Bearings
Part Number: SUM-R58360302
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Master Chassis Hardware Kit, 1970 Mopar B-Body, Drum Brakes, 426 Hemi, Complete OE Style Chassis Fastener Kit In One Package, 275 Piece Kit
Part Number: SUM-RP80350
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster