Availability
Summit Racing Performance, Restoration & Replacement Parts & Tools
Fuel Tank, Steel, Silver Powdercoated, 17 Gallon, G-body, 78-88, Chevy, Pontiac, Each
Part Number: SUM-255026
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Harmonic Balancer, SFI, External Balance, Steel, Clearcoated, Ford, 5.0L, Each
Part Number: SUM-C4270
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Frame Brace, Chassis Stiffening Kit, Steel, 63-72 C10, Long Bed, 127 in. Wheelbase, Bolt-In, Chevy, GMC, Kit
Part Number: SUM-770821
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Axles, Direct Fit, 1541H Steel, 30-Spline, Chevy, 8.875 in., Kit
Part Number: SUM-700121
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Engine Mounts, Block Mount, Bolt-In, GM to Cummins Conversion, Steel Bracket, Black Powdercoated, Chevy, GMC, Pair
Part Number: SUM-7731103
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Fuel Line, Braided Stainless Steel, Aluminum, Holley, 4150, -8 AN Inlet, Each
Part Number: SUM-220100
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Bellhousing Bolts, Hex Head Flange Type, 10mm x 1.50 Thread, 10.9 Steel, Zinc plated, Chevrolet, LS, 8 piece, Kit
Part Number: SUM-910227
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Headers, Block Hugger, Steel, Ceramic Coated, Street Rod 1923-1949 with Ford, Small Block Windsor, SBF, 289, 302, 351W, Pair
Part Number: SUM-G9063-1
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Engine Stand, Weight Capacity 1,250 lbs., Rotates 360 Degrees, Steel, Black Painted, Each
Part Number: SUM-918014
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Steering Column, Tilt, Column Shift, No Key, Stainless Steel, Black Powdercoated, 2 in. Diameter, 30 in. Length, Automatic, Each
Part Number: SUM-771703B-NK
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Crossover Pipe, X-Pipe, 409 Stainless Steel, 16 Gauge, 2.5 n. Diameter, Chevy, 6.2L, Kit
Part Number: SUM-642135-SS
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Subframe Connectors, Bolt-On, Black Texture, Steel, 67-69 Chevy Camaro, Pontiac Firebird, Pair
Part Number: SUM-770400
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Exhaust Flange, 3-bolt, Stainless Steel, Natural, 2.5 in. Pipe Diameter, Each
Part Number: SUM-626000
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Harmonic Balancer, SFI, Internal Balance, Steel, Clearcoated, Chrysler, Big Block, Hemi, Each
Part Number: SUM-C4279
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Exhaust Pipe, Crossover, X-Pipe, 304 Stainless Steel, Polished, 3 in. Diameter, 12 in. Long, Universal, Each
Part Number: SUM-640701
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Tubing, Round, D.O.M. Steel, 1.750 in. Diameter, 0.120 in. Wall Thickness, 7.5 ft. Long, Each
Part Number: SUM-TR1750-120D7
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Bolts, Intake Manifold, Steel, Zinc Plated, 12-Point Head, Chevy, Small Block, Kit
Part Number: SUM-G1491
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Oil Pan Gasket, 1-piece, Rubber with Steel Core, Ford, 351W, Each
Part Number: SUM-G2337
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Exhaust Manifold and Header Gaskets, Multi-Layer Steel, Round Port, Chevrolet, GM, LS, Includes EGR and Air Injection Gaskets, Set
Part Number: SUM-110445
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Drinkware, Water Bottle, Stainless Steel, Blue, NOS® Logo, 20 oz., Each
Part Number: SUM-P1028
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Tubing, Round, Mild Steel, 1.250 in. Diameter, 0.120 in. Wall Thickness, 7.5 ft. Long, Each
Part Number: SUM-TR1250-120-7
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Exhaust Pipe, Crossover, X-Pipe, 304 Stainless Steel, Polished, 2.5 in. Diameter, 12 in. Long, Universal, Each
Part Number: SUM-640700
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Exhaust Tubing, 180-Degree, Mandrel Bend, 3.0 in. Diameter, 6 in. Legs, U-Bend, 18-Gauge, 304 Stainless Steel, Polished, Each
Part Number: SUM-622126
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Gauge Tubing, Braided Stainless Steel, -4 AN Diameter, 4 ft. Long, Kit
Part Number: SUM-G2961
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Torque Wrenches, Click Style, 20-150 ft.-lbs., 1/2 in. Drive, Steel, Chrome, Each
Part Number: SUM-907067
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster