Availability
Summit Racing Performance, Restoration & Replacement Parts & Tools
Timing Chain and Gear Set, Adjustable, Billet Steel, Single Roller, 3-Bolt, 1X, Standard Spacing, LS, Kit
Part Number: SUM-G6645-1X
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Valve Cover Set, LS Race, Lightweight Die Cast Aluminum, Plain, Black Powdercoat, Pair
Part Number: SUM-440820
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Cam and Lifter kit, Pro SBC Retrofit Stage 2 Hyd.Roller LS Firing Order, 218/227 Dur., 110 LSA + 1 Adv, .525/.520 1.5 Ratio, 1800-6250 RPM Range
Part Number: SUM-K1222
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Cam and Lifter kit, Pro SBC Stage 4 Hyd. Roller Cam, 224/232 Dur. 112 LSA + 2 Adv, .550/.540 1.5 Ratio, 2000-6500 RPM Range, 87-02 Gen 1 Roller Block
Part Number: SUM-K8803
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Pro LS Alignment Tool, Rear Cover, Installs Rear Main Seal, Chevy,Gen III-IV LS, Each
Part Number: SUM-900335
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Pro LS 2618 Forged Piston, 4.030 bore, 1.299 C.H., 12cc Dish, Std. Stroke, 6.125 .927 Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LY6 LQ4 LQ9,Set of 8
Part Number: SUM-299927403012
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Stage 3 Pro LS Turbo Cam. 232/234 115.5 + 5.5, .600/.575 Lift, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck LS1 LS2 LS6 LS3 LS7 LS9 LQ4 LQ9 LM7, Each
Part Number: SUM-8716R1
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Intake Combo, Edelbrock Performer RPM, Air Gap, Chevy, Big Block/Oval, Bolts, Gaskets, RTV Sealer/Carb. Studs
Part Number: CMB-03-0017
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Main Bolts, Extreme Duty, 4-bolt Style, 6-point, Premium Quality, 190,000 psi Yield Strength, Washers, Chevy, Small Block, Kit
Part Number: SUM-910203-PRO
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Throttle Body, Drive-By-Wire, Billet Aluminum, Black Anodized, 103mm, Chevy, LS, Each
Part Number: SUM-227110B
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Pro LS Piston and Rod Kit, 325 Cid., 3.780 bore, Standard 3.622 stroke, 6.125 rod, 7cc dish, 9.7:1 @ 61cc, 9.3:1 @ 65cc, File-Fit Rings
Part Number: SUM-PR36L7807
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Pro LS 2618 Forged Piston, 4.065 bore, 1.110 C.H., 6cc dish, 4.000in. Stroke, 6.125 Rod, NA/Boost/Nitrous, Cathedral/Rect., 6.2 LS3 L92 LS9, Set of 8
Part Number: SUM-1109274065-6
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Cam and Lifter kit, Pro SBC Retrofit Stage 3 Hyd. Roller LS Firing Order, 224/232 Dur., 110 LSA + 2 Adv, .550/.540 1.5 Ratio, 2000-6300 RPM Range
Part Number: SUM-K1223
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Pro LS 2618 Forged Piston, 4.065 bore, 1.299 C.H., 2cc Dome, Std. Stroke, 6.125 .927 Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.2L LS3 L92 LS9, Set of 8
Part Number: SUM-2999274065-2
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Camshaft Kit, Pro LS, Hydraulic Roller Tappet, Advertised Duration 288/296, Lift .625/.605, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8709-1DS
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Combo, Summit, Headers, Steel, Ceramic Coated, 1 5/8 in., Exhaust System, Steel, Aluminized, 2.25 in., Kit
Part Number: CMB-05-0014
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Pro SBC Retrofit Stage 1 Hyd. Roller LS Firing Order Cam, 212/218 Dur., 110 LSA + 2 Adv, .525/.520 1.5 Ratio, .560/.555 1.6 Ratio, 1500-6000 Range
Part Number: SUM-1221
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Pro LS Truck Torkinator. 200/205 Dur., 113+4, .550/.550 Lift, 3-bolt, 4.8 5.3 5.7 6.0 6.2, 7.0 Vortec, L59 LR4 LM7 L33 LS2 L92 L96 LY6 LQ4 LQ9 , Each
Part Number: SUM-8727R1
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Cam and Lifter kit, Stage 2 Pro LS Cam. 226/238 113+3, .600/.600 Lift, 3-bolt, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0, LS1,2,3,6,7, LSA LQ4 LQ9 LS9 LS4 LY6
Part Number: SUM-K8707R1
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Piston Rings, Gas Nitrided Steel Top, Martensitic Ductile Napier second, Std. Tension oil, File fit for 4.075 in. bore, 1.2mm, 1.2mm, 3.0mm, Set
Part Number: SUM-136SN9045075
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Pro LS 4340 Piston and Rod Kit, 377 Cid., 4.070 bore, 3.622 stroke, 6.125 rod, 2cc dome, 11.6:1 @ 65cc, 10.9:1 @ 70cc, File-Fit Rings
Part Number: SUM-PR36L0702
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Piston Wrist Pins, H-13 Tool Steel, 0.927 in. Diameter, 2.250 in. Length, 0.215 in. Wall Thickness, 135 grams, Set of 8
Part Number: SUM-S719-8
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Oil Pan, Engine Swap, Cast Aluminum, Black, 6.0 Quart Capacity, 4.25 in. Stroke Clearance, Chevy, LS, V8, Each
Part Number: SUM-121200B
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Combo, Oil Pan, Black Zinc, Pickup, High-Volume Pump, Shaft, Tray, Scraper, Gaskets, Chevy, 7.4L/454, Kit
Part Number: SUM-PANKIT14
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Pro LS 2618 Forged Piston, 4.005 bore, 1.299 C.H., 2cc Flat, Std. Stroke, 6.125 .927 Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LY6 LQ4 LQ9, Set of 8
Part Number: SUM-2999274005-2
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster