Availability
2016 Summit Racing Parts and Accessories
SUM-8722 Level 1 Cam Kit with Dual Springs Ti. Retainers Locks and Seals, Stage 3 Pro LS Twin-Turbo Cam. 234/238 Dur., 115+5, .625/.605 Lift, 3-bolt
Part Number: SUM-8722-1-DLTI
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
SUM-8722 Level 2 Cam Kit with Beehive Springs, Seals, Crank Bolt, Gaskets, Stage 3 Pro LS Twin-Turbo Cam. 234/238 Dur., 115+5, .625/.605 Lift, 3-bolt
Part Number: SUM-8722-2-BHV
Not Yet Reviewed
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Pro LS 2618 Forged Pistons. 3.785 bore, 1.326 C.H., 7cc dish, Std. Stroke, .Gen.4 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-326943785-7F
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Pro LS 2618 Forged Piston, 4.000 bore, 1.110 C.H., 8cc dish, 4.000in. Stroke, 6.125 Rod, NA/Boost/Nitrous, Cathedral/Rect., 6.0 LY6 LQ4 LQ9, Set of 8
Part Number: SUM-1109274000-8
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Camshaft Kit, Pro LS Single Plane, Hydraulic Roller Tappet, Advertised Duration 299/311, Lift .569/.569, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8703-1DS
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Exhaust System, Cat-Back, 2.50 inch, Split Rear, Steel, Aluminized, Stainless Tips, Dodge, Dart, Kit
Part Number: SUM-680017
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Tonneau Cover, Hard Tri Folding, 2015-2023 Ford F-150, 5.5 Ft. Bed, Each
Part Number: SUM-484926
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Camshaft Kit, Pro LS Turbo, Hydraulic Roller Tappet, Advertised Duration 275/283, Lift .600/.575, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8706-1DS
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Connecting Rods, 4340, H-Beam, 12-Point, 6.275 in. Length, 0.945 in. Pin, ARP2000 Bolts, Chevy GM, LS/LSX, Gen III/IV, Set of 8
Part Number: SUM-LS6275945
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Lifters, Hydraulic Roller, Link Bar, 0.842 in. Outside Diameter, 2.685 in. Seat Height, GM LS Gen III/IV, Chevy, Set of 16
Part Number: SUM-HT223-16
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
SUM-8728 Pro LS Big Truck Torkinator Level 2 Cam Kit, Beehive Springs, Seals, 212/218 Dur., 110 + 3, .600/.585 Lift, 3 Bolt, 4.8, 5.3, 6.0, 6.2 Vortec
Part Number: SUM-8728-2-BHV
Not Yet Reviewed
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Cam and Lifter kit, Stage 1 Pro LS Truck Swap Cam, High-Lift version, 209/217 112 + 1 .550/.550 Lift, 3-bolt, 4.8-6.2L, LQ4 LQ9 LY6 LS1 LS2 LS6 , Each
Part Number: SUM-K8719R1
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Pro LS 2618 Forged Piston, 4.000 bore, 1.326 C.H., 12cc Dish, Std. Stroke, Full Float Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LY6 LQ4 LQ9,Set of 8
Part Number: SUM-326943400012
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Pro LS 2618 Forged Piston, 4.080 bore, 1.299 C.H., 2cc Dome, Std. Stroke, 6.125 .927 Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.2L LS3 L92 LS9, Set of 8
Part Number: SUM-2999274080-2
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Pro LS 2618 Forged Pistons. 3.810 bore, 1.326 C.H., 7cc dish, Std. Stroke, .Gen.4 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-326943810-7F
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Camshaft Kit, Pro LS, Hydraulic Roller Tappet, Advertised Duration 271/287, Lift .600/.575, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8715-1
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Pro LS 2618 Forged Piston, 4.005 bore, 1.326 C.H., 12cc dish, Std. Stroke, .945 pin Press or Float, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LQ4 LQ9
Part Number: SUM-326945400512
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Pro LS 2618 Forged Piston, 4.070 bore, 1.326 C.H., 12cc Dish, Std. Stroke, Full Float Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.2 LS3 L92 LS9, Set of 8
Part Number: SUM-326943407012
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Camshaft Kit, Pro LS Turbo, Hydraulic Roller Tappet, Advertised Duration 280/288, Lift .600/.575, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8716-1
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
SUM-8722 Level 1 Cam Kit with Dual Springs Steel Retainers Locks and Seals, Stage 3 Pro LS Twin-Turbo Cam. 234/238 Dur., 115+5, .625/.605 Lift, 3-bolt
Part Number: SUM-8722-1-DLSTL
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Pro LS 2618 Forged Piston, 3.820 bore, 1.110 C.H., 12cc dish, 4.000in. Stroke, 6.125 Rod, NA/Boost/Nitrous,Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-110927382012
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Cylinder Head Fasteners, Extreme Duty, 12-point, Chromoly, Black Oxide, Washers, 2011-22 Ford, 6.7L Powerstroke Diesel, Kit
Part Number: SUM-910519
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Pro LS 2618 Forged Piston, 4.080 bore, 1.299 C.H., 12cc Dish, Std. Stroke, 6.125 .927 Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.2 LS3 L92 LS9, Set of 8
Part Number: SUM-299927408012
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Pro LS 2618 Forged Piston, 3.820 bore, 1.110 C.H., 5cc dish, 4.000in. Stroke, 6.125 Rod, NA/Boost/Nitrous,Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-1109273820-5
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Pro LS 2618 Forged Piston, 3.780 bore, 1.110 C.H., 5cc dish, 4.000in. Stroke, 6.125 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-1109273780-5
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster