Availability
2013 CHEVROLET Summit Racing Parts and Accessories
Valve Cover, Direct OEM Replacement, Stock Height, Cast Aluminum, Black Finish, Includes Bolts,Grommets ,Gaskets, Right/Passenger Side, GM LS, Each
Part Number: SUM-440555B
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Summit Factory Performance Stage 2 LS Cam, 227/239 108 L/S, .551/.551 Lift, Vortec LS1 LS2 LS6 LS3 LS7 LQ4 LQ9, Summit's version of Factory Stage 2
Part Number: SUM-8704
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Stage 4 Pro LS Twin-Turbo Cam. 240/242 Dur., 116+4, .625/.605 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck, LS1 LS2 LS6 LS3 LS7 LQ4 LQ9, Each
Part Number: SUM-8723R1
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Coolant Crossover Delete or Block Off Set, Aluminum, Rear, GEN III/IV LS, Kit
Part Number: SUM-402055
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pro LS 2618 Forged Piston, 4.065 bore, 1.299 C.H., 2cc Dome, Std. Stroke, 6.125 .927 Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.2L LS3 L92 LS9, Set of 8
Part Number: SUM-2999274065-2
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Strut, Loaded, Twin Tube, Front, Chevy, GMC, Truck, Each
Part Number: SUM-SA11590
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Exhaust Crossover Pipe, Turbo Manifold, 2.250 in., Stainless Steel, Chevy LS, Each
Part Number: SUM-G9300-XC
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pro LS 2618 Forged Piston, 4.000 bore, 1.110 C.H., 8cc dish, 4.000in. Stroke, 6.125 Rod, NA/Boost/Nitrous, Cathedral/Rect., 6.0 LY6 LQ4 LQ9, Set of 8
Part Number: SUM-1109274000-8
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Shock/Strut, Twin-Tube, Red Polyurethane Bushings, Includes Red Boot, Each
Part Number: SUM-G7744
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Tonneau Cover, Soft Roll-Up, Vinyl, Black, Above the Bed Rails, 6 1/2 Ft, Bed, 99-2014, Chevy, GMC,2500-3500, Each
Part Number: SUM-484817
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Intake Manifold, Fuel Injected, Low Profile, 102mm Bore Size, Aluminum, Satin, Chevy, LS1, LS2, LS6, Each
Part Number: SUM-226125S-G2
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Turbocharger Kits, Hot Side, GT7875 Style Turbocharger, Cast Aluminum Compressor Wheel, Journal Bearing, Chevy, Kit
Part Number: CMB-03-0264
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pro LS 4340 Rotating Assembly, 410 Cid., 4.040 bore, 4.000 stroke, 24X, 6.125 rod, 8cc dish, 11.2:1 @ 65cc, 10.6:1 @ 70cc, File-Fit Rings, H Bearings
Part Number: SUM-R24400408
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pro LS Rotating Assembly, 370 Cid., 4.030 bore, 3.622 stroke, 24X, 6.125 rod, 2cc Flat Top, 10.9:1 @ 65cc, 10.3:1 @ 70cc, File-Fit rings, H Bearings
Part Number: SUM-R2436L0302
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Bellhousing Bolts, Hex Head Flange Type, 10mm x 1.50 Thread, 10.9 Steel, Zinc plated, Chevrolet, LS, 8 piece, Kit
Part Number: SUM-910227
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pro LS 2618 Forged Piston, 4.075 bore, 1.110 C.H., 6cc dish, 4.000in. Stroke, 6.125 Rod, NA/Boost/Nitrous, Cathedral/Rect., 6.2 LS3 L92 LS9, Set of 8
Part Number: SUM-1109274075-6
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pro LS 2618 Forged Pistons. 3.810 bore, 1.326 C.H., 7cc dish, Std. Stroke, .945 pin Press or Float, NA/Boost/Nitrous, Coated, 4.8L 5.3L Vortec Truck
Part Number: SUM-326945810-7P
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Connecting Rods, 4340, H-Beam, 12-Point, 6.275 in. Length, 0.945 in. Pin, ARP2000 Bolts, Chevy GM, LS/LSX, Gen III/IV, Set of 8
Part Number: SUM-LS6275945
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Water Neck, Thermostat Housing, Cast Aluminum, Polished, 60 Degree, Swivel, Chevrolet, LS, Each
Part Number: SUM-370998
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cam and Lifter kit, Camshaft, Stage 2, LS Truck Swap Cam, High lift version, 218/227 112+2, .600/.600 Lift, 3-bolt, LS1 LS2 LS6 LS3 LQ4 LY6 LQ9 Each
Part Number: SUM-K8720R1
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pro LS 4340 Rotating Assembly, 416 Cid., 4.070 bore, 4.000 stroke, 24X, 6.125 rod, 6cc dish, 11.5:1 @ 65cc, 10.9:1 @ 70cc, File-Fit Rings, H Bearings
Part Number: SUM-R24400706
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pro LS 4340 Rotating Assembly, 402 Cid., 4.000 bore, 4.000 stroke, 24X, 6.125 rod, 20cc dish, 9.7:1 @ 65cc, 9.3:1 @ 70cc, File-Fit Rings, H Bearings
Part Number: SUM-R244000020
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Valve Covers, Centerbolt Mounting, Cast Aluminum, Polished, Chevy GM, LS/LSX, Gen III/IV, Pair
Part Number: SUM-440343P
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft Kit, Pro LS, Hydraulic Roller Tappet, Advertised Duration 275/288, Lift .600/.600, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8707-1DS
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Exhaust Manifold Hardware, Hex Flange, 10.9 Steel, Zinc Plated, Chevrolet, LS, Set of 12
Part Number: SUM-910228
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster