Availability
2005 Summit Racing Parts and Accessories
Camshaft Kit, Pro LS, Hydraulic Roller Tappet, Advertised Duration 283/297, Lift .625/.605, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8711-2-DLTI
Not Yet Reviewed
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Camshaft Kit, Pro LS, Hydraulic Roller Tappet, Advertised Duration 271/287, Lift .600/.575, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8715-2-DLTI
Not Yet Reviewed
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Headlight Assembly RH 03-05 Cavalier, Each GM2503221
Part Number: SUM-GM286-B001R
Not Yet Reviewed
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Headlight Assembly LH 03-05 Cavalier, Each GM2502221
Part Number: SUM-GM286-B001L
Not Yet Reviewed
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Step Bars, Nerf Bars, Stainless Steel, Polished, 3 in. Diameter, Dodge, Dakota, Pair
Part Number: SUM-71000350
Not Yet Reviewed
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Marker Lamp Assembly RH 97-6 WRNGLR SIDE OF FENDER CH2551120 Each
Part Number: SUM-CS317-U000R
Not Yet Reviewed
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Strut, Loaded, Twin Tube, Front Passenger Side, Chevy, Pontiac, FWD, Each
Part Number: SUM-SA11602
Estimated Ship Date: Jun 3, 2026 if ordered today
Estimated Ship Date: Jun 3, 2026 if ordered today
Strut, Loaded, Twin Tube, Front, Driver Side, Chevy, Each
Part Number: SUM-SA11671
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Strut, Loaded, Twin Tube, Front, Passenger Side, Chevy, Each
Part Number: SUM-SA11672
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
SUM-8727 Pro LS Truck Torkinator Level 2 Cam Kit, Dual Springs, Ti. Ret. Gaskets/Bolt 200/205 Dur. 113 +4, .550/.550 Lift, 3-Bolt, 4.8, 5.3, 6.0 , 6.2
Part Number: SUM-8727-2-DLTI
Not Yet Reviewed
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Headlight Assembly LH 04-09 MAZDA3 Sedan HLGN MA2518108 Each
Part Number: SUM-MZ220-A001L
Not Yet Reviewed
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
SUM-8722 Level 1 Cam Kit with Dual Springs Ti. Retainers Locks and Seals, Stage 3 Pro LS Twin-Turbo Cam. 234/238 Dur., 115+5, .625/.605 Lift, 3-bolt
Part Number: SUM-8722-1-DLTI
Not Yet Reviewed
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Camshaft Kit, Pro LS Turbo, Hydraulic Roller Tappet, Advertised Duration 280/288, Lift .600/.575, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8716-1DT
Not Yet Reviewed
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Camshaft Kit, Pro LS, Hydraulic Roller Tappet, Advertised Duration 271/287, Lift .600/.575, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8715-1DT
Not Yet Reviewed
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Main Bearing, Audi/VW VR6 -2.8,2.9,3.2,3.6L Standard Size, Set
Part Number: SUM-5532HS
Not Yet Reviewed
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Differential Carrier, Positraction, Nodular Iron, Dana 60, Dana 61, 32 Spline, 4 Series, Each
Part Number: SUM-730979
Not Yet Reviewed
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Replacement Piston and Components: If not in stock, order MUST be placed to trigger singles. Average ETA of 3 business days if kits are in stock
Part Number: SUM-110S273780-5
Not Yet Reviewed
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Camshaft Kit, Pro LS, Hydraulic Roller Tappet, Advertised Duration 288/296, Lift .625/.605, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8710-2-DLSTL
Not Yet Reviewed
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Camshaft Kit, Pro LS, Hydraulic Roller Tappet, Advertised Duration 280/292, Lift .600/.600, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8708-2-DLSTL
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Camshaft Kit, Pro LS, Hydraulic Roller Tappet, Advertised Duration 283/297, Lift .625/.605, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8711-2-DLSTL
Not Yet Reviewed
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Replacement Piston and Components: If not in stock, order MUST be placed to trigger singles. Average ETA of 3 business days if kits are in stock
Part Number: SUM-299S273810-2
Not Yet Reviewed
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Replacement Piston and Components: If not in stock, order MUST be placed to trigger singles. Average ETA of 3 business days if kits are in stock
Part Number: SUM-326S45400012
Not Yet Reviewed
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Replacement Piston and Components: If not in stock, order MUST be placed to trigger singles. Average ETA of 3 business days if kits are in stock
Part Number: SUM-110S274005-8
Not Yet Reviewed
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Tail Light Assembly LH 02-09 Trailblazer, Each GM2800150
Part Number: SUM-GM236-B000L
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
SUM-8728 Pro LS Big Truck Torkinator Level 1 Cam Kit, Dual Springs, Steel Ret. 212/218 Dur., 110+3, .600/.585 Lift, 3 Bolt, 4.8, 5.3, 6.0, 6.2 Vortec
Part Number: SUM-8728-1-DLTI
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster