Availability
SUM-8724 Level 1 Cam Kit, Dual Springs, Ti. Ret., Pro LS Stage 4.5 Twin-Turbo Cam. 242/248 Dur., 116+5, .625/.605 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2
Part Number: SUM-8724-1-DLTI
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Pro LS Big Gun 3 Hydraulic Roller Cam, Stage 5, 247/255, 117 + 7, .625/.605 with 1.7, .662/.641 with 1.8, 4200-7300+ RPM, 6.2+, Each.
Part Number: SUM-8731R1
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Radiator, Exact Fit, Aluminum, Plastic, Chevy, GMC, 8.1L, Each
Part Number: SUM-380561
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Headlight Assembly LH 8/97-04 DAKOTA 98-03 DURANGO INNERCL PARK/SIGNAL CH2502122 Each
Part Number: SUM-CS056-B101L
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Window Louver, Rear, Black, ABS Plastic, Chevy, GMC, Pair
Part Number: SUM-WL2029
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Pro LS 2618 Forged Piston, 4.040 bore, 1.326 C.H., 12cc dish, Std. Stroke, .945 pin Press or Float, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LQ4 LQ9
Part Number: SUM-326945404012
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Replacement Piston and Components: If not in stock, order MUST be placed to trigger singles. Average ETA of 3 business days if kits are in stock
Part Number: SUM-326S434000-2
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Oil Fill Cap, Twist-In, Billet Aluminum, Brushed, -10 AN, LS, Gen-V, Coyote, Each
Part Number: SUM-380192
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, SBC/LS 2.100 pin, .837 width, Standard Clearance, set
Part Number: SUM-663HDS
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Pro LS 2618 Forged Pistons. 3.820 bore, 1.326 C.H., 2cc dome, Std. Stroke, .Gen.4 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-326943820-2F
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Pro LS 2618 Forged Piston, 3.898 bore, 1.110 C.H., 16cc dish, 4.000in. Stroke, 6.125 Full-float Rod, NA/Boost/Nitrous, Coated, 5.7L LS1 LS6, Set of 8
Part Number: SUM-110927389816
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Pro LS 2618 Forged Pistons. 3.820 bore, 1.326 C.H., 2cc dome, Std. Stroke,.945 pin Press or Float, NA/Boost/Nitrous, Coated, 4.8L 5.3L Vortec Truck
Part Number: SUM-326945820-2P
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Pro LS 2618 Forged Pistons. 3.820 bore, 1.299 C.H., 7cc dish, Std. Stroke, .6.125 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-2999273820-7
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Carpet and Vinyl Floor Kits, Carpet Cut Pile, Black, Complete, Without Rocker Panels, Jeep, Kit
Part Number: SUM-461101-BLK
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Forged Pro pistons for SB Chevy 350, 4.000 bore, 1.560 C.H., 3.48 in. stroke, 5.7 in. rod, 5cc flat top. 11:1@58cc, 10.2@64cc, 9.9@67cc, 9.4@72cc.
Part Number: SUM-SBC350000
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Headlight Assembly RH 04-08 Grnd Prix All Models , Each GM2503227
Part Number: SUM-GM321-B001R
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Headlight Assembly LH 04-08 Grnd Prix All Models , Each GM2502227
Part Number: SUM-GM321-B001L
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Lift Support, Tailgate, Gas Charged, Chevy, GMC, Each
Part Number: SUM-484976
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Forged Pro pistons for SB Chevy 350 Long Rod, 4.030 bore, 1.260 C.H., 3.48 in. stroke, 6 in. rod, 5cc flat top 11:1@58cc, 10.2@64cc, 9.9@67cc, 9.4@72.
Part Number: SUM-SBC350030L
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Forged Pro pistons for SB Chevy 350 Long Rod, 4.060 bore, 1.260 C.H., 3.48 in. stroke, 6 in. rod, 5cc flat top 10.2@64cc, 9.9@67cc, 9.4@72.
Part Number: SUM-SBC350060L
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Headlight Assembly RH 02-09 Trailblazer Exc 06-09 Lt Notch For Grille, Each GM2503213
Part Number: SUM-GM235-B001R
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Valve Cover Gaskets, Molded Rubber, Chevy, Pair
Part Number: SUM-110565
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Wheel, Off-Road-8, 15 x 8 in., Aluminum, Black, 3.73 in. Backspace, 5 x 114.3mm Bolt Pattern, Each
Part Number: SUM-56-5865SBN19
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Timing Gear, Adjustable, Billet Steel, 3-Bolt, 1X, Single Row, 0.010 in. Line Hone, Chevy LS, Each
Part Number: SUM-G6643-1X-010
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Camshaft Kit, Pro LS Turbo, Hydraulic Roller Tappet, Advertised Duration 288/285, Lift .625/.600, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8717-1DS
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.