Availability
2004 Summit Racing Engines & Components
Cylinder Head Studs, Extreme Duty, 12-Point Head, Black Oxide, Chevy, 4.8, 5.3, 5.7, 6.0L, 2004-up, Kit
Part Number: SUM-910501
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pistons, Hypereutectic, Flat, 4.000 in. Bore, Chevy, Set of 8
Part Number: SUM-17351C-00
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Stage 1 Pro LS Drop-in Truck Swap Cam, 210/218 112 +1, .500/.500 Lift, 3-bolt, 4.8, 5.3, 5.7, 6.0, 6.2, LS1 LS2 LS6 LS7 LS9 LS3 LH6 LQ4 LQ9, Each
Part Number: SUM-8712R1
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Camshaft, Stage 2, Pro LS Turbo Cam. 226/230 Dur., .600/.575 Lift, 113+4 Lobe Sep. , 5.3, 5.7, 6.0, 6.2, 7.0, LS1 LS2 LS6 LS3 LS7 LQ4 LQ9 LS9, Each
Part Number: SUM-8706R1
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pro LS Piston and Rod Kit, 370 Cid., 4.030 bore, 3.622 stroke, 6.125 rod, 2cc Flat Top, 10.9:1 @ 65cc, 10.3:1 @ 70cc, File-Fit Rings
Part Number: SUM-PR36L0302
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Cylinder Deactivation Delete Combo, 6.0/6.2L AFM DOD Delete, Head Bolts, Lifters/Trays, Non PCV Valley Cover, Head Gaskets, Chevy LS, Kit
Part Number: CMB-09-0032
Not Yet Reviewed
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Pistons, Hypereutectic, Flat, Coated Skirt, 4.030 in. Bore, Chevy, Set of 8
Part Number: SUM-17351C-30
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pistons, Pro LS 2618 Forged, 4.030 bore, Flat top, 3.622 in. Stroke, 6.098 Rod, Set of 8
Part Number: SUM-3269454030-2
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Harmonic Balancer/Crank Pulley, 25 Percent Underdrive, SFI, Internal Balance, Medium Spacing, Chevy, Pontiac, 5.7, 6.0L, Each
Part Number: SUM-C2502
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Valve Covers, Tall Height, Cast Aluminum, Black Crinkle, Plain, Chevy, LS, Pair
Part Number: SUM-440362
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Harmonic Balancer, Crank Pulley, 25 Percent Underdrive, SFI, Internal Balance, Short Spacing, 5.7, 6.0, 6.2L, Each
Part Number: SUM-C2503
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Lifters/Trays/Bolts, Hydraulic Roller, Chevy, LS Gen. 3 and 4, Gen. 5 LT, Kit
Part Number: SUM-HTLSKIT3
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Rocker Arm Trunnion Upgrade Kit, Trunnion Upgrade, Chevy, LS, Set of 16
Part Number: SME-143002
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Stage 4 Pro LS Cam, Extra Valve Clearance Version, 234/248 113.5 +3.5 .625/.605 Lift, Great Power, 3-bolt, 4.8-7.0L , Vortec LS1 LS2 LS6 LS7 LQ9 LS9
Part Number: SUM-8711R1
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pro LS 2618 Forged Piston, 4.030 bore, 1.299 C.H., 12cc Dish, Std. Stroke, 6.125 .927 Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LY6 LQ4 LQ9,Set of 8
Part Number: SUM-299927403012
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pro LS 2618 Forged Piston, 4.000 bore, 1.299 C.H., 2cc Flat, Std. Stroke, 6.125 .927 Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LY6 LQ4 LQ9, Set of 8
Part Number: SUM-2999274000-2
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pro LS 2618 Forged Piston, 4.030 bore, 1.326 C.H., 2cc Flat, Std. Stroke, Full Float Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LY6 LQ4 LQ9, Set of 8
Part Number: SUM-3269434030-2
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Stage 3 Pro LS Turbo Cam. 232/234 115.5 + 5.5, .600/.575 Lift, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck LS1 LS2 LS6 LS3 LS7 LS9 LQ4 LQ9 LM7, Each
Part Number: SUM-8716R1
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pro LS Piston and Rod Kit, 364 Cid., 4.000 bore, 3.622 stroke, 6.125 rod, 2cc Flat Top, 10.7:1 @ 65cc, 10.4:1 @ 70cc, File-Fit Rings
Part Number: SUM-PR36L0002
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pro LS Piston and Rod Kit, 326 Cid, 3.785 bore, Standard 3.622 stroke, 6.125 rod, 2cc dome, 10.9:1 @ 61cc, 10.4:1 @ 65cc, File-Fit Rings
Part Number: SUM-PR36L7852
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pro LS Big Truck Torkinator High Lift. 212/218 Dur., 110+3, .600/.585 Lift, 3-bolt, 4.8 5.3 5.7 6.0 6.2, Vortec LM7 L33 LS2 L92 L96 LY6 LQ4 LQ9 , Each
Part Number: SUM-8728R1
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Replica Block, Steel, Natural, Includes Hardware, Chevy, LS, Each
Part Number: SUM-774001
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, 222/232 Dur.@ .050 112 LSA +5 Adv. Lift .550/.550, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8713-1
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pro LS 4340 Piston and Rod Kit, 370 Cid., 4.030 bore, 3.622 stroke, 6.125 rod, 12cc Dish, 9.7:1 @ 65cc, 9.3:1 @ 70cc, File-Fit Rings
Part Number: SUM-PR36L03012
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pro LS 4340 Forged Steel Crank, 3.622 Stroke, 58X Reluctor, Lightened Rod Journals and Gun-drilled Mains, Std. 6-bolt Flange, Internal balanced, LS3
Part Number: SUM-180LS362258X
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster