Availability
2001 Summit Racing Parts and Accessories
Oil Primer Socket, Aluminum, Natural, 3/8 in. Drive, Chevy, LS, Each
Part Number: SUM-900330
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Intake Manifold, Fuel Injected, Tall Profile, 102mm Bore Size, Aluminum, Satin, Chevy, LS1, LS2, LS6, Each
Part Number: SUM-226120L
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Lifter Guides, Hydraulic Roller Style, Steel, Chevy, 5.0L, 5.7L, Set of 8
Part Number: SUM-150131
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Header Adapter Plates, Billet Aluminum, .625 in. Thick, Chevy, Small Block to Stahl flange, Kit
Part Number: SUM-695100
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Main Bearings, 1/2 Groove, Standard Size, Bi Metal, Silicon Aluminum, Ford, 221-302, Set of 5
Part Number: SUM-172100
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Cap and Rotor, Blue, Crab Style, Brass Terminals, Screw-Down, Chevy, GMC, Oldsmobile, 4.3L, V6, Kit
Part Number: SUM-G5222
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Ignition Coil Bracket, Remote Mount LS Ignition Coil Relocation Brackets, Black Powder Coated Steel, Rectangular, Chevy, Kit
Part Number: SUM-852700
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Spark Plug Wires, 86 Series, 8mm, 300 Ohm, Blue, OEM Spark Plug Boots, Dodge, Jeep, 5.2 / 5.9L Magnum, V8, Set
Part Number: SUM-867815
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Pro LS 2618 Forged Piston, 3.898 bore, 1.299 C.H., 3cc mini dome, Std. Stroke, 6.125 Full-float Rod, NA/Boost/Nitrous, Coated, 5.7L LS1 LS6, Set of 8
Part Number: SUM-2999273898-3
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, Advertised Duration 278/282, Lift .545/.545, Chevy, LS, Each
Part Number: SUM-8714-1
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Harmonic Balancer, SFI, Internal Balance, Steel, Clearcoated, Ford, 4.6L, Each
Part Number: SUM-C4271
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Wheel, Venom, Aluminum, Gloss Black, Machined, 15 in. x 8 in., 5 x 4.75 in./120.65mm Bolt Circle, 4.50 in. Backspace, Each
Part Number: SUM-149B-58610
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Summit 4340 Forged Crankshaft, SBF Windsor, 3.000 in Stroke, 28 oz. Balancer, Narrowed Rod Bearings, 1.375 Pilot Bearing, Designed for 5.090 in. Rod
Part Number: SUM-SBF3023000E
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Pro LS Rotating Assembly, 370 Cid., 4.030 bore, 3.622 stroke, 24X, 6.098 rod, 2cc Flat Top, 10.9:1 @ 65cc, 10.3:1 @ 70cc, File-Fit Rings, H Bearings
Part Number: SUM-R24360302
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Header Bolts, Hex Head, 1.000 in. UHL, 3/8 in. Wrench, Stainless Steel, Natural, Chevy, LS Engine, Set of 12
Part Number: SUM-910231
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Intake Manifold, Fuel Injected, Low Profile, 92mm Bore Size, Aluminum, Satin, Chevy, LS1, LS2, LS6, Each
Part Number: SUM-226127S-G2
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Pro LS 2618 Forged Piston, 3.810 bore, 1.110 C.H., 5cc dish, 4.000in. Stroke, 6.125 Rod, NA/Boost/Nitrous,Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-1109273810-5
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Pro LS 2618 Forged Piston, 4.030 bore, 1.326 C.H., 12cc Dish, Std. Stroke, Full Float Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LY6 LQ4 LQ9,Set of 8
Part Number: SUM-326943403012
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Clutch Cable, with Aluminum Quadrant, Adjustable, Ford, Kit
Part Number: SUM-700106
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Combo, Edelbrock 600cfm, Performer RPM Vortec, Fel-Pro, Summit Bolts, Summit Air Filter, Studs, Chevy, Kit
Part Number: CMB-03-0075
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Gaskets, Intake, Cellulose, Nitrile, Oval, 2.160 in. x 1.850 in. Port, .060 in. Thick, Chevy, Big Block, Set
Part Number: SUM-110501
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Intake Manifold, Fuel Injected, Low Profile, 102mm Bore Size, Aluminum, Satin, Chevy, LS3, L92, Each
Part Number: SUM-226129S-G2
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Cab Visor, Sportvisor, Lighted, Fiberglass, White Gelcoat, Chevy, GMC, Pickup, Each
Part Number: SUM-480108
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Rocker Arm, 1.7 Ratio, Roller Fulcrum, Ductile Iron, Chevy GM, LS/LSX, Gen III/IV, No Offset Each
Part Number: SUM-141550
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Engine Valley Cover Gasket, Rubber/Steel, Chevy GM, GEN III, LS-1, 4.8, 5.3, 5.7, 6.0, Each
Part Number: SUM-G2626
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster