Availability
2000 Summit Racing Engines & Components
Pro SBC Retrofit Stage 2 Hyd.Roller LS Firing Order Cam, 218/227 Dur., 110 LSA + 1 Adv, .525/.520 1.5 Ratio, .560/.555 1.6 Ratio, 1800-6250 RPM Range
Part Number: SUM-1222
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Pro LS Big Truck Torkinator High Lift. 212/218 Dur., 110+3, .600/.585 Lift, 3-bolt, 4.8 5.3 5.7 6.0 6.2, Vortec LM7 L33 LS2 L92 L96 LY6 LQ4 LQ9 , Each
Part Number: SUM-8728R1
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Lifters/Trays/Bolts, Hydraulic Roller, Chevy, LS Gen. 3 and 4, Gen. 5 LT, Kit
Part Number: SUM-HTLSKIT3
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Connecting Rods, 4340, I-Beam, 12-Point, Cap Screw, 5.700 in. Length, 550 HP, Chevy, Small Block, Set of 8
Part Number: SUM-180371P
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Stage 3 Pro LS Turbo Cam. 232/234 115.5 + 5.5, .600/.575 Lift, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck LS1 LS2 LS6 LS3 LS7 LS9 LQ4 LQ9 LM7, Each
Part Number: SUM-8716R1
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Pro SBC Retrofit Stage 3 Hyd. Roller LS Firing Order Cam, 224/232 Dur., 110 LSA + 2 Adv, .550/.540 1.5 Ratio, .587.576 1.6 Ratio, 2000-6300 RPM Range
Part Number: SUM-1223
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Stage 4 Pro LS Cam, Extra Valve Clearance Version, 234/248 113.5 +3.5 .625/.605 Lift, Great Power, 3-bolt, 4.8-7.0L , Vortec LS1 LS2 LS6 LS7 LQ9 LS9
Part Number: SUM-8711R1
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Replica Block, Steel, Natural, Includes Hardware, Chevy, LS, Each
Part Number: SUM-774001
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Pro SBC Retrofit Stage 4 Hyd.Roller LS Firing Order Cam, 232/242 Dur., 110 LSA + 3 Adv, .550/.550 1.5 Ratio, .587/.587 1.6 Ratio, 2200-6400 RPM Range
Part Number: SUM-1224
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Cam and Lifter kit, Pro SBC Stage 4 Hyd. Roller Cam, 224/232 Dur. 112 LSA + 2 Adv, .550/.540 1.5 Ratio, 2000-6500 RPM Range, 87-02 Gen 1 Roller Block
Part Number: SUM-K8803
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Stage 3 Pro LS Twin-Turbo Cam. 234/238 Dur., 115+5, .625/.605 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck, LS1 LS2 LS6 LS3 LS7 LQ4 LQ9, Each
Part Number: SUM-8722R1
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Stage 3 Pro LS Cam - Extra Valve Clearance Version, 230/242 113+3, .625/.605 Lift, Excellent power and torque, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0L
Part Number: SUM-8710R1
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Piston Wrist Pins, H-13 Tool Steel, 0.927 in. Diameter, 2.250 in. Length, 0.215 in. Wall Thickness, 135 grams, Set of 8
Part Number: SUM-S719-8
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, Advertised Duration 278/287, Lift .523/.524, Chevy GM, LS/LSX, Gen III/IV, LS, Kit
Part Number: SUM-8701-1
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, Advertised Duration 261/269, Lift .550/.550, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8719-1
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Crankshaft, 1-Piece Seal, External Balance, Cast Steel, 3.750 in. Stroke, Chevy, 350 main, 383 stroker, Each
Part Number: SUM-180368
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Pro SBC Retrofit Stage 5 Hyd. Roller LS Firing Order Cam, 242/252 Dur., 110 LSA + 4 Adv, .550/.550 1.5 Ratio, .587/.587 1.6 Ratio, 2600-6600 RPM Range
Part Number: SUM-1225
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Summit Factory Performance Stage 3 LS Single Plane Cam, 236/246 110 +0 .612/.612 Lift, LS1 LS2 LS6 LS3 LQ9, Summit's version of Factory LSX 454 cam
Part Number: SUM-8702
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Crankshaft, Remanufactured, Nodular Iron, 3.622 in. Stroke, 0.010 Undersize Bearing Required, 24-Tooth Reluctor, Chevy, LS, Each
Part Number: SUM-180362
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Pro LS Truck Torkinator. 200/205 Dur., 113+4, .550/.550 Lift, 3-bolt, 4.8 5.3 5.7 6.0 6.2, 7.0 Vortec, L59 LR4 LM7 L33 LS2 L92 L96 LY6 LQ4 LQ9 , Each
Part Number: SUM-8727R1
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Camshaft, Non-DOD, Non AFM, 3-Bolt, Hydraulic Roller, GM LS Truck, 4.8-5.3 LM7, OE # 12560967 Equivalent, Each
Part Number: SUM-8780
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Pro SBC Retrofit Stage 1 Hyd. Roller LS Firing Order Cam, 212/218 Dur., 110 LSA + 2 Adv, .525/.520 1.5 Ratio, .560/.555 1.6 Ratio, 1500-6000 Range
Part Number: SUM-1221
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Summit Factory Performance Stage 2 LS Cam, 227/239 108 L/S, .551/.551 Lift, Vortec LS1 LS2 LS6 LS3 LS7 LQ4 LQ9, Summit's version of Factory Stage 2
Part Number: SUM-8704
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Valve Cover Set, LS Race, Lightweight Die Cast Aluminum, With Coil Mounts, Black Powdercoat, Pair
Part Number: SUM-440821
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Rocker Arms, Stud Mount, Full Roller, Aluminum, 1.6 Ratio, Fits 7/16 in. Stud, Ford, Small Block/351W, Set of 16
Part Number: SUM-G6941B
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster