Availability
2000 Summit Racing Engines & Components
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, SBC 350 Main .011 undersize (thicker), Half-Upper groove, set
Part Number: SUM-909H011
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Lifter Valley Cover, Finned, Aluminum, Black Powdercoated, Chevy, LS, Each
Part Number: SUM-240065-BLK
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Alternator Bracket, Aluminum, Chrome, Water Pump Mount, Long Water Pump, Chevy, Small Block, Kit
Part Number: SUM-420100
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy COATED Racing Main Bearings, SBC 350 Main .001 Extra Clearance, Half-Upper groove, set
Part Number: SUM-909HXS
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Oil Pump, Standard-Volume, Standard Pressure, Includes Pickup, Chevy, Small Block, Each
Part Number: SUM-CSUM3502S
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Replacement Piston and Components: If not in stock, order MUST be placed to trigger singles. Average ETA of 3 business days if kits are in stock
Part Number: SUM-326S454000-2
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Engine Hardware Kit, Brass Freeze Plugs, Main Cap Side Bolts, Chevy, LS, Kit
Part Number: SUM-G1585
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Timing Gear, Adjustable, Billet Steel, 3-Bolt, 4X, Single Row, 0.005 in. Line Hone, Chevy LS, Each
Part Number: SUM-G6644-4X-005
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, SBC/LS 2.100 pin, .837 width, .001 undersize (thicker), set
Part Number: SUM-663H001
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, SBC 350 Main .001 Extra Clearance for .010 undersize, Half-Upper groove, set
Part Number: SUM-909H009
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Valves, Intake, Stainless Steel, 2.050 in. Diameter, .341 in. Stem, 4.911 in. Length, Chevy, Set of 8
Part Number: SUM-V8004-8
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Main Bearings, Race Series Main Bearing Sets, 0.011 in. Crankshaft Undersize, Tri-metal Copper-lead Alloy, Chevrolet, Big Block, Set of 5
Part Number: SUM-829H011
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, SBC/LS 2.100 pin, .837 width, .001 Extra Clearance for .010 undersize, set
Part Number: SUM-663H009
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Oil Pump and Pickup Assembly, High-Volume, 6.125 in. Pan Depth, Chevy, Small Block, Kit
Part Number: SES-3-60-08-100
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Replacement Piston and Components: If not in stock, order MUST be placed to trigger singles. Average ETA of 3 business days if kits are in stock
Part Number: SUM-299S27403012
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, SBC/LS 2.100 pin, .837 width, .011 undersize (thicker), set
Part Number: SUM-663H011
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Timing Gear, Adjustable, Billet Steel, 3-Bolt, 4X, Single Row, 0.010 in. Line Hone, Chevy LS, Each
Part Number: SUM-G6644-4X-010
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy COATED Racing Rod Bearings, SBC/LS 2.100 pin, .837 width, .010 undersize (thicker), set
Part Number: SUM-663HC010
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Rocker Arms, Steel, Pedestal Mount, 1.7 Ratio, Upgrade, Cadillac, Chevy, GMC, Pontiac, Set of 8
Part Number: SME-143000
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Lifter Valley Cover, Finned, Aluminum, Polished, Chevy, LS, Each
Part Number: SUM-240065-POL
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Replacement Piston and Components: If not in stock, order MUST be placed to trigger singles. Average ETA of 3 business days if kits are in stock
Part Number: SUM-299S274030-2
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, Ford 4.6 5.0 5.4L Mod, Standard Clearance, set
Part Number: SUM-1442HS
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Timing Gear, Adjustable, Billet Steel, 3-Bolt, 1X, Single Row, Standard Size, Chevy LS, Each
Part Number: SUM-G6643-1X
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, Ford 4.6, 5.0, 5.4L, Mod, Narrowed, Standard Clearance, set
Part Number: SUM-1442HNS
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Replacement Piston and Components: If not in stock, order MUST be placed to trigger singles. Average ETA of 3 business days if kits are in stock
Part Number: SUM-326S43780-7F
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster