Availability
Crankshaft Socket, 1/2 in., Steel, Chevrolet, Small Block, 90 Degree V6, Each
Part Number: SUM-904793
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Oil Pan, Stock Replacement, Steel, Black Painted, 5 qt., Chevy, Small Block, Each
Part Number: SUM-G3505B
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Oil Pickup, Standard Volume, Press Fit, Street/Strip Pan Style, 8.000 in. Pan Depth, 0.625 in. Tube Dia., Chevy, V8, Ea.
Part Number: SUM-G3620
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Cam and Lifter KIt Muscle Car Replacement SBC Flat tappet hydraulic,L-48 295 hp 350 Cam with Lifters
Part Number: SUM-K1120
Not Yet Reviewed
Cannot be shipped Internationally
Cannot be shipped Internationally
Combo, Oil Pan, Black Zinc, Pickup, Std-Volume Pump, Shaft, Tray, Scraper, Gaskets, Chevy, Small Block, Kit
Part Number: SUM-PANKIT7
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Main Bearings, 1/2 Groove, .010 in. Crankshaft Undersize, Bi Metal, Silicon Aluminum, Chevy, Big Block, Set of 5
Part Number: SUM-172210
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Pro SBF Best Hydraulic Roller Cam 10, 252/264 Duration, 109 LSA + 3 Adv. .587/.587 lift 1.6 ratio, .625/.625 lift 1.7 ratio, 4,000-7,500 basic rpm
Part Number: SUM-8910
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Oil Pump and Pickup Assembly, High-Volume, Chevy, Small Block, Kit
Part Number: SES-3-60-08-035
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Head Gaskets, Copper, 4.060 in. Bore, .043 in. Compressed Thickness, Chevy, Small Block, Pair
Part Number: SUM-111501
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Spark Plug Wires, 86 Series, 8mm, 300 Ohm, Blue, 2-90 / 4-180 Degree Spark Plug Boots, Jeep, 4.0L, L6, Set
Part Number: SUM-867625
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Harmonic Balancer Bolts, Harmonic Balancer Bolt Kits, External Hex Head, 3/4 in.-16 Thread, Steel, Black Oxide, Chrysler, Dodge, Plymouth, V8, Each
Part Number: SUM-910310
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Distributor Hold-Down Clamp, Steel, Chrome, Stud Mount, Chevy, Each
Part Number: SUM-400501
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Transmission Pan, Stock Depth, Steel, Chrome Plated, Finned, 4L80E, 4L85E, Chevy, Each
Part Number: SUM-G3878
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Header Flanges, Steel, 3/8 in. Thick, 2.0 in. Diameter Round Port, Chevy, Big Block, Pair
Part Number: SUM-670201
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Timing Chain and Gear Set, Double Roller, Steel Sprockets, Chevy, Small Block V8, 4.3L V6, Set
Part Number: SME-7000-TS
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Valve Cover Gaskets, Centerbolt, Rubber, Chevy, Small Block, Pair
Part Number: SUM-110580
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Clutch Kit, Street-Strip Performance, 1-1/16 in. Shaft, 10-Spline, 10.5 in. Organic/Ceramic Disc, Ford, Kit
Part Number: SUM-700916
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Clutch Cable Adjuster, Firewall Mount, Aluminum, Natural, Ford, Each
Part Number: SUM-700102
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Muscle Car Camshaft, 340HP327, Mechanical Flat Tappet, 2,000-5,000 RPM Range, Adv.Duration 287 int./287 exh., Lift .395/.410 in., Chevy, Each
Part Number: SUM-1123
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Timing Chain and Gear Set, True Roller, Double Roller, Billet Steel Sprockets, Ford, Small Block, For use with 2-piece Fuel Pump Eccentric Only, Set
Part Number: SUM-G6651R-B
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Oil Pan Gasket, 1-Piece, Cellulose/Nitrile, Chevy, 7.4L, Each
Part Number: SUM-G2333
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Intake Combo, Weiand Action Plus, Ford, Small Block, Bolts, Gaskets, RTV Sealer, Carburetor Studs, Kit
Part Number: CMB-03-0121
Cannot be shipped Internationally
Cannot be shipped Internationally
Rod Bearings, Direct Replacement, 0.020 in. Crankshaft Undersize, Bi Metal, Chevy, Small Block, Set of 8
Part Number: SUM-171020
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Camshaft Installation Handle, Hex Design, Super Deluxe Model, Chevy, Fits All LS/LT Gen 3/4/5 and V8/90 Degree V6, Each
Part Number: SUM-900133
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Cab Visor, Sportvisor, Fiberglass, White Gelcoat, Chevy, GMC, Pickup, Each
Part Number: SUM-480008
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.