Availability
1991 DODGE Summit Racing Parts and Accessories
Headlight Assembly RH 91-96DAKOTA W/AERO CH2503105 Each
Part Number: SUM-CS076-B001R
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Forged Pro Mopar SB 4340 Forged Steel H-Beam Connecting Rod, 6.123 in. Length, .984 Floating Pin, 8740 7/16 in. 12 pt. Bolts, Each
Part Number: SUM-MOP61238H-1
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Chrysler LA Long Snout Best Hydraulic Roller Cam 2, 218/226 Duration, 111 LSA + 2 Adv. .525/.520 lift 1.5 ratio, .560/.554 1.6 ratio, 2,300-6,000 rpm
Part Number: SUM-5771
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Chrysler LA Long Snout Best Hydraulic Roller Cam 3, 224/236 Duration, 112 LSA + 3 Adv. .550/.550 lift 1.5 ratio, .587/.587 1.6 ratio, 3,200-6,700 rpm
Part Number: SUM-5772
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Chrysler LA Long Snout Best Hydraulic Roller Cam 4, 232/248 Duration, 112 LSA + 5 Adv. .550/.550 lift 1.5 ratio, .587/.587 1.6 ratio, 3,400-6,900 rpm
Part Number: SUM-5773
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, Mopar SB, .001 Extra Clearance, set
Part Number: SUM-481HXS
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Main Bearing, Mitsubishi 6G72/T, 6G73 .010 Undersize, Set
Part Number: SUM-1149H010
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Main Bearing, Mitsubishi 6G72/T, 6G73 .001 Undersize, Set
Part Number: SUM-1149H1
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Main Bearing, Mitsubishi 6G72/T, 6G73 Standard Size, Set
Part Number: SUM-1149HS
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Main Bearing, Mitsubishi 6G72/T, 6G73 Standard Size Extra Clearance, Set
Part Number: SUM-1149HXS
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Engine Swap Combos, BluePrint Pro Series Mopar Engine, Engine Mounts, Frame Mounts, Transmission Crossmember, Dodge, Plymouth, Kit
Part Number: CMB-08-0268
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Battery Tray, Reproduction, 1972-1993 Dodge Truck, OE Style, Each
Part Number: SUM-RP80498
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Combo, Fel-Pro, Gaskets, Header, Steel Core Laminate, Stage 8, Bolts, Hex, Locking, Mopar, Small Block, Kit
Part Number: CMB-05-0114
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Timing Chain and Gear Set, OE Replacement, Dodge, Set
Part Number: SUM-TS73089
Not Yet Reviewed
Estimated Ship Date: Apr 21, 2026 if ordered today
Estimated Ship Date: Apr 21, 2026 if ordered today
Timing Chain and Gear Set, OE Replacement, Chrysler, Set
Part Number: SUM-TS73117
Not Yet Reviewed
Estimated Ship Date: Apr 21, 2026 if ordered today
Estimated Ship Date: Apr 21, 2026 if ordered today
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster