Availability
1990 Summit Racing Engines & Components
Harmonic Balancer, SFI, External Balance, Steel, Clearcoated, Chevy, Big Block, Each
Part Number: SUM-C4264
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Oil Pump and Pickup Assembly, High-Volume, Chevy, Big Block, Kit
Part Number: SES-3-90-08-003
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pro SBC Retrofit Stage 3 Hyd. Roller LS Firing Order Cam, 224/232 Dur., 110 LSA + 2 Adv, .550/.540 1.5 Ratio, .587.576 1.6 Ratio, 2000-6300 RPM Range
Part Number: SUM-1223
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cylinder Head, 195cc Precision Cast, Aluminum, Assembled, 65cc Chamber, 2.020 in./1.600 exh. Valve, Chevy, For Small Block with Flat Tappet Cam, Each
Part Number: SUM-162SBCSTRFT
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cam and Lifter kit, Pro SBC Retrofit Stage 2 Hyd.Roller LS Firing Order, 218/227 Dur., 110 LSA + 1 Adv, .525/.520 1.5 Ratio, 1800-6250 RPM Range
Part Number: SUM-K1222
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Adapter, Oil Filter, Bypass, Bolt-On, Aluminum, Natural, 13/16-16 in. Thread, Each
Part Number: SES-3-60-08-900
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Timing Chain and Gear Set, True Roller, Double Roller, Billet Steel Sprockets, Chevy, Big Block, Set
Part Number: SUM-G6610R-B
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Timing Cover, 1-Piece, Aluminum, Polished, Chevy, Big Block, Kit
Part Number: SUM-G6301W
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cam and Lifter kit, Pro SBC Stage 4 Hyd. Roller Cam, 224/232 Dur. 112 LSA + 2 Adv, .550/.540 1.5 Ratio, 2000-6500 RPM Range, 87-02 Gen 1 Roller Block
Part Number: SUM-K8803
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Connecting Rods, 4340, I-Beam, 12-Point, Cap Screw, 6.135 in. Length, 650 HP, Chevy, Big Block, Set of 8
Part Number: SUM-180375B
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pro SBC Retrofit Stage 4 Hyd.Roller LS Firing Order Cam, 232/242 Dur., 110 LSA + 3 Adv, .550/.550 1.5 Ratio, .587/.587 1.6 Ratio, 2200-6400 RPM Range
Part Number: SUM-1224
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Oil Pan, Conversion, Street/Strip, Steel, Black, 5 qt., Engine Swap, Ford, 351W, Kit
Part Number: SUM-G3550B
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Water Pump/Timing Cover Fasteners, Bolts, Studs, 8740 Chromoly, 12.9 Grade, Ford, Mustang, 5.0L, 5.8L, Windsor, SBF, Kit
Part Number: SUM-910270
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Oil Pump, High-Volume, Standard Pressure, Chevy, Small Block, Each
Part Number: SUM-121155
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Gear Drive, Noisy, Dual Idler, Chevy, Small Block, Set
Part Number: SUM-G6700
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Timing Chain and Gear Set, True Roller, Double Roller, Billet Steel Sprockets, Ford, Small Block, For use with 1-Piece Fuel Pump Eccentric, Set
Part Number: SUM-G6620R-B
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Oil Pan, Steel, Gold Zinc, 5 qt., Chevy, Big Block, Each
Part Number: SUM-G3533
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Valve Covers, Tall, Cast Aluminum, Polished, Plain, Chevy, Big Block, Pair
Part Number: SUM-G3313
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Crankshaft, 2-Piece Seal, External Balance, Cast Steel, 4.000 in. Stroke, Chevy, 454, Each
Part Number: SUM-180370
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cam Bearings, Steel Backed Babbitt, Chevy, Small Block, Kit
Part Number: SUM-173000
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Oil Pan, Steel, Natural, 5 qt., 1-Piece Rear Main Seal, Chevrolet, Small Block, Each
Part Number: SUM-G3503X
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Connecting Rods, 4340, I-Beam, Thru-Bolt, 5.700 in. Length, 475 HP, Chevy, Small Block, Set of 8
Part Number: SUM-180370B
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Rocker Arms, Roller Tip, Self-Aligning, Cast Steel, 3/8 in. Stud Mount, 1.5 Ratio, Polylocks, Chevy, Small Block, Set of 16
Part Number: SUM-141700PL
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Forged Pro Small Block Chevy 4340 Forged Steel I-Beam Connecting Rod, 6 in. Length, .927 Floating Pin, 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-180SBC6000I
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Harmonic Balancer, OEM, External Balance, Nodular Iron, Natural, Chevy, Big Block, Each
Part Number: SUM-162454
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster