Selected Filters


Loading...

Availability


1989 Summit Racing Parts and Accessories

Individual Parts

Results 151 - 175 of 1995

Distributor, Electronic, Billet Aluminum. Magnetic Pickup, Brown Cap, Ignition Control, Mopar, SB, LA, Kit

Part Number: SUM-851003-1

4.18 out of 5 stars ( 22 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Motor Plate, Front, Aluminum, 1/4 in. Thick, Chevy, Big Block, Each

Part Number: SUM-01-9030

3.83 out of 5 stars ( 6 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Rocker Arms, 1.6 Ratio, 3/8 in. Stud, Full Roller, Stainless Steel, Polished, Small Block Ford, SBF, Set of 16

Part Number: SUM-G6996

4.0 out of 5 stars ( 6 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Disc Brake Kit, Rear, Manual or Power Assisted, Chevy/GMC,1963-87 truck, 5 Lug, Cast Iron Calipers, Kit

Part Number: SUM-BK3005

Not Yet Reviewed

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Water Neck, Cast Aluminum, Polished, O-Ring, 45-Degree, Chevy, Big/Small Block, Each

Part Number: SUM-371100

4.53 out of 5 stars ( 101 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Timing Cover, 1-Piece, Aluminum, Polished, Chevy, Big Block, Kit

Part Number: SUM-G6301W

4.32 out of 5 stars ( 25 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Automatic Transmission, Early SBC/BBC 6 bolt GM Bellhousing, Automatic Valve Body, 900+HP Heavy Duty, GM, 4L80E, 2WD or RWD, 97-99 Electronics, Each

Part Number: SUM-700476

Not Yet Reviewed

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Clutch Kit, Organic, 1-1/16 in. Shaft, 10-Spline, 10-1/2 in. Diameter Disc, Ford, Kit

Part Number: SUM-700800

4.47 out of 5 stars ( 17 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Dash Pad, 1981-87 Chevy/GMC Truck, Blue, Original Design, Foam Backed Vinyl, Best Quality, Each

Part Number: SUM-RP23563

4.5 out of 5 stars ( 2 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Water Pump, Electric, 35 gpm At 12 V, 6 amps, Aluminum, Black Powdercoated, Chevy, Big Block, Each

Part Number: SUM-316005

4.27 out of 5 stars ( 15 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Rocker Arms, Pro Series, Stud Mount, Full Roller, Stainless Steel, 1.5 Ratio, Fits 7/16 in. Stud, Chevy, Small Block, Set of 16

Part Number: SUM-G6992

Not Yet Reviewed

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Oil Pump, High-Volume, Standard Pressure, Chevy, Small Block, Each

Part Number: SUM-121155

4.7 out of 5 stars ( 67 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Timing Chain and Gear Set, True Roller, Double Roller, Billet Steel Sprockets, Chevy, Big Block, Set

Part Number: SUM-G6610R-B

5.0 out of 5 stars ( 4 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Engine Stand, Engine Block Adapter Plate, SBC,BBC,LS, Duramax, Billet Aluminum, Natural, Each

Part Number: SUM-918019

5.0 out of 5 stars ( 5 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Connecting Rods, 4340, I-Beam, 12-Point, Cap Screw, 6.135 in. Length, 650 HP, Chevy, Big Block, Set of 8

Part Number: SUM-180375B

5.0 out of 5 stars ( 4 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Exhaust Gaskets, Header, Copper, Stock Port, Chevy, Small Block, Pair

Part Number: SUM-111406

4.22 out of 5 stars ( 54 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Windshield Washer Pump, Buick, Chevy, GMC, Oldsmobile, Pontiac, GM#04919332 , Each

Part Number: SUM-RP22016

3.5 out of 5 stars ( 8 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Fuel Pump, Mechanical, 80 gph, 8 psi, Chevy, Small Block, Each

Part Number: SUM-250000-1

3.76 out of 5 stars ( 122 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Cam and Lifter kit, Pro SBC Retrofit Stage 3 Hyd. Roller LS Firing Order, 224/232 Dur., 110 LSA + 2 Adv, .550/.540 1.5 Ratio, 2000-6300 RPM Range

Part Number: SUM-K1223

Not Yet Reviewed

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Automatic Transmission, Early 6 bolt GM Bellhousing, Automatic Valve Body, Standard Shift Pattern, GM, 4L80E, 4WD, 97-99 Electronics, Each

Part Number: SUM-700473

Not Yet Reviewed

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Flywheels, OE Replacement, Cast Iron, 168-tooth, 30 lbs., External Engine Balance, Chevy, Big Block, Each

Part Number: SUM-700096

4.75 out of 5 stars ( 4 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Disc Brake Kit, Rear, Manual or Power Assisted, Chevy/GMC,1963-87 truck, 6 Lug, Kit

Part Number: SUM-BK3001

1.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Cam and Lifter kit, Pro SBC Stage 4 Hyd. Roller Cam, 224/232 Dur. 112 LSA + 2 Adv, .550/.540 1.5 Ratio, 2000-6500 RPM Range, 87-02 Gen 1 Roller Block

Part Number: SUM-K8803

4.0 out of 5 stars ( 2 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Oil Pan Gasket, 1-Piece, Cellulose/Nitrile, Chevy Big Block, Each

Part Number: SUM-G2331

5.0 out of 5 stars ( 14 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Shifter, Manual Transmission, Short Throw, Billet Aluminum, 6.750 in. Long Shifter Stick, Ford, T-5, T-45, Each

Part Number: SUM-555-7353-SR

4.85 out of 5 stars ( 91 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air