Availability
1975 Summit Racing Parts and Accessories
Water Pump, Electric, 60 gpm, Billet Aluminum, Red Anodized, Chevy, Big Block, Each
Part Number: SUM-314454-R
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Radiators, Classic OEM, Downflow, Copper/Brass, Black, Transmission Cooler, Jeep, 5.9L, 6.6L, Each
Part Number: SUM-382036
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Distributor, Billet Aluminum, Magnetic Pickup, Vacuum/Mechanical Advance, Ford 351W, V8, Each
Part Number: SUM-850211
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Flywheel, Billet Steel, 168-Tooth, 30 lb., External Engine Balance, Chevy, Big Block, Each
Part Number: SUM-700182
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Flywheel, Billet Steel, 168-Tooth, 30 lb., External Engine Balance, Chevy, Small Block, 400, Each
Part Number: SUM-700185
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Combo, Summit, Water Pump, Electric, Aluminum, Natural, Chevy, Small Block, Relay, Kit
Part Number: CMB-12-0011
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 282/292, Lift .486/.512, Ford, 351C, 351M, 400
Part Number: SUM-K5200
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Pulley Set, Serpentine, Standard Ratio, Billet Aluminum, Chevy, Small Block, Short Water Pump, Kit
Part Number: SUM-329710
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Crossmember, Transmission, Steel, Black, GM, 700R4/4L60/4L60E, Each
Part Number: SUM-770318
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 284/284, Lift .512/.512, Ford, Small Block, Kit
Part Number: SUM-K30062
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Cab Visor, Sportvisor, Lighted, Fiberglass, White Gelcoat, Chevy, GMC, Van, Each
Part Number: SUM-480114
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Clutch Kit, Street-Strip Performance, 1-1/8 in. Shaft, 26-Spline, 10.5 in. Organic/Ceramic Disc, GM, Kit
Part Number: SUM-700934
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Exhaust Manifolds, Cast Iron, Chrome, 2.50 in. Collector, Rams Horn Style, Chevy, Small Block, Pair
Part Number: SUM-G9200
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Ignition Combo, Digital Ignition Box with Rev Limiter, Billet Distributor, E-Core Coil, Chevy, Big/Small Block, Kit
Part Number: SUM-CSUM2750
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Distributor, Magnetic Pickup, Vacuum and Mechanical Advance, Black Cap, Aluminum, Oldsmobile, V8, Each
Part Number: SUM-850405
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
PRO BBC H.R. 8 Hydraulic Roller Cam, 4/7 Swap, 252/258 Duration @ .050, 112.5 LSA + 8.5 Adv. , .620/.620 with 1.7 ratio, .656/.656 with 1.8, 3900-6800
Part Number: SUM-1258
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Flywheel, Billet Aluminum, 157-Tooth, Neutral Balance, Ford, 289, 302, 351W, Each
Part Number: SUM-700198
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Engine Rebuild, Hypereutectic Flat, 4.060 in. Bore, Standard Rod, Standard Main, Chevy, 350, Kit
Part Number: SUM-SBCKIT3-600
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Radiators, Classic OEM, Downflow, Copper/Brass, Chrysler, Dodge, Plymouth, Each
Part Number: SUM-382082
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 298/303, Lift .466/.488, Pontiac, V8, Kit
Part Number: SUM-K2802
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Alternator, Internal Regulator, 60 Amp, Chrome Plated, 1-Wire, 1-Groove Pulley, Chrysler, Dodge, Plymouth, Each
Part Number: SUM-812119
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Radiator, Performance Fit, Aluminum, Natural, Jeep, Each
Part Number: SUM-380489
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Intake Manifold, Dual Carburetor, Tunnel Ram, Fabricated Aluminum, Black, Chevy, SBC, Each
Part Number: SUM-226402B
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Engine Rebuild, Hypereutectic Flat, 4.040 in. Bore, Standard Rod, Standard Main, Chevy, 350, Kit
Part Number: SUM-SBCKIT3-400
Not Yet Reviewed
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Control Arms, Tubular, Front, Upper, Steel, Black Powdercoated, GM, Passenger Car, Pair
Part Number: SUM-770210
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster