Availability
Radiator and Fan Shroud Combo, Performance Fit, 4-Row, Aluminum, Polished, Ford, Truck, Each
Part Number: SUM-384033-KIT1
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Radiator and Fan Shroud Combo, Performance Fit, 3-Row, Aluminum, Polished, Chevy, Each
Part Number: SUM-384006-KIT1
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Forged Pro BB Chevy 4340 Forged Steel I-Beam Connecting Rods, 6.135 in. Length, .990 Floating Pin, 8740 PSI 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-BBC6135I
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Forged Pro Mopar SB 4340 Forged Steel H-Beam Connecting Rod, 6.123 in. Length, .984 Floating Pin, 8740 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-MOP61238H
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Radiator and Fan Shroud Combo, Performance Fit, 4-Row, Aluminum, Polished, Ford, Mercury, Each
Part Number: SUM-384016-KIT1
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Intake Combo, Edelbrock Performer RPM, Air Gap, Chevy, Big Block/Oval, Bolts, Gaskets, RTV Sealer/Carb. Studs
Part Number: CMB-03-0017
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Combo, Edelbrock Performer, 750 cfm, Manual Choke, Nozzles, Calibration Kit, Kit
Part Number: CMB-03-0056
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Headers, Long Tube, Steel, Ceramic Coated, Chevy, Big Block, Pair
Part Number: SUM-G9102
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Disc Brake Kit, Front Conversion, Manual, Solid Surface Rotors, Cast Iron Calipers, Zinc Plated, 5 x 4.5 in., Ford, Mercury, Kit
Part Number: SUM-BK-45016
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
LS Cylinder Head, 5.3L Specific, 60cc Chamber, 2.000 Int. Valve, Permanent Mold A-356, Manganese Guides, Ductile Seats, PAC Springs, 21 4N Stainless
Part Number: SUM-LS210CATH60
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
SUM-8728 Pro LS Big Truck Torkinator Level 1 Cam Kit, Beehive Springs, 212/218 Dur., 110 + 3, .600/.585 Lift, 3 Bolt, 4.8, 5.3, 6.0, 6.2 Vortec
Part Number: SUM-8728-1-BHV
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Gen. 1.5 LT1 Forged Steel Crankshaft, 3.750 stroke, 5.700 Rod, Lightened, bull-nose counterweights, Nitride Hardened, 1 piece rear main seal
Part Number: SUM-SBCLT37501P
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Gauge Cluster Assembly, OEM Replacement, Chevy, GMC, C/K Truck, Suburban, 1969-1972, Analog, Electrical, Black Face, Kit
Part Number: SUM-RP22101
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Differential Carrier, Positraction, Nodular Iron, GM 8.5 in., 28 Spline, 2.73 Up Ratio, Each
Part Number: SUM-730966
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
SB Chevy Forged Steel crankshaft, 3.875 Stroke, Two Piece Rear Seal, Req. Narrowed Rod Bearings, Lightened, Nitride, Designed for 6.000 in. Rod
Part Number: SUM-SBC4003875
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Gauge, OEM Replacement, Conversion Kit, 5000 RPM Tachometer, Black/White/Orange Face, Analog, Electric, 1981-1987 Chevy Truck, Kit
Part Number: SUM-RP25033
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Radiators, Classic OEM, Downflow, Copper/Brass, Black, Transmission Cooler, Ford, 6.9L Diesel, 7.3L Diesel, Each
Part Number: SUM-382037
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Differential Carrier, Positraction, Nodular Iron, Dana 44, 3 Series, 30 Spline, Each
Part Number: SUM-730972
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Torque Converter, 26-spline Input, Balanced, 10 in. Diameter, 3,200-3,500 Stall, Ford, C-4, Each
Part Number: SUM-700371
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Forged Pro pistons for Pontiac 400, 4.150 bore, 1.715 C.H., 3.75 in. stroke, 6.625 in. rod, 6cc flat top, 11.3@64cc, 10.3@72cc, 9.6@80cc, 9:1@87cc.
Part Number: SUM-BBP400030
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Camshaft Kit, Pro LS, Hydraulic Roller Tappet, Advertised Duration 275/288, Lift .600/.600, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8707-2-DLSTL
Not Yet Reviewed
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Automatic Transmission Valve Body, Billet Aluminum, Trans-Brake, Forward Shift Pattern, Chevy, Powerglide, Each
Part Number: SUM-700016
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Differential Carrier, Positraction, Nodular Iron, GM 8.2 in., 28 Spline, 3.08 Up Ratio, Each
Part Number: SUM-730962
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
1970 AMC , Dash and Engine Compartment Harness , AMX and Javelin , V/8 , Parking Lamp included , Restoration , Each
Part Number: SUM-RP20572
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Differential Carrier, Positraction, Nodular Iron, Dana 60, Dana 61, 30 Spline, 3 Series, Each
Part Number: SUM-730975
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster