Availability
Summit Racing Parts and Accessories
Exhaust Pipe Kit, Header-Back, Weld-Up, Steel, Aluminized, 3.00 in. Diameter, Universal, Kit
Part Number: SUM-670257
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Radiator, Performance Fit, 4-Row, Aluminum, Polished, Chevy, Each
Part Number: SUM-384011
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Intake Manifold, Fuel Injected, Low Profile, 92mm Bore Size, Aluminum, Black, Chevy, LS1, LS2, LS6, Each
Part Number: SUM-226127B-G2
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Automatic Transmission Rebuild Kit, Kolene Steels, GM, TH350, Non-Lockup, 30-Spline, Kit
Part Number: SUM-705020
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Camshaft, Stage 2, Pro LS Turbo Cam. 226/230 Dur., .600/.575 Lift, 113+4 Lobe Sep. , 5.3, 5.7, 6.0, 6.2, 7.0, LS1 LS2 LS6 LS3 LS7 LQ4 LQ9 LS9, Each
Part Number: SUM-8706R1
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Oil Pan, Steel, Black Zinc, 6 qt., Chevy, Big Block, Each
Part Number: SUM-G3605
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Crossmember, Transmission, Steel, Black, GM, TH200/TH350/M-21/M-22/Powerglide/Saginaw/Super T-10, Each
Part Number: SUM-770300
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Summit F303 Plus Hyd. Roller Cam, 226/234 Duration, 114 LSA + 4 Adv, .550/.540 1.6 Ratio, .585/.574 1.7 Ratio, 3000-6500 Range, '85-1996 Roller Block
Part Number: SUM-8902
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Steering Column, Tilt, Floor Shift, No Key, Stainless Steel, Black Powdercoated, 2 in. Diameter, 30.0 in. Length, Each
Part Number: SUM-771713B-NK
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Oil Pan, Steel, Black Zinc, 6 qt., Chevy, Small Block, Each
Part Number: SUM-G3600
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Radiator, Performance Fit, 4-Row, Aluminum, Trans Cooler, Polished, Chevy, Pontiac, Oldsmobile, Buick, GMC, Cadillac, Each
Part Number: SUM-384003
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Radiator, Performance Fit, 3-Row, Aluminum, Polished, Chevy, Each
Part Number: SUM-384010
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Master Cylinder and Brake Boost Assembly, 1.125 in. Bore, Dual Bowl Design, Aluminum Master Cylinder, Polished, 7 in., Steel Booster, Chrome, Kit
Part Number: SUM-760225
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Differential, Trac-Loc, Ford, 9 in., 31-Spline, Each
Part Number: SUM-CTF9TRACL31
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Rocker Arms, Stud Mount, Full Roller, Aluminum, 1.5 Ratio, Fits 3/8 in. Stud, Chevy, Small Block, Set of 16
Part Number: SUM-G6905
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Dual Exhaust Cutouts, Slip Fit, Electric, Aluminum, Bolt On, 2.5 in. Diameter, Mild Steel Tubing, Kit
Part Number: SUM-670222-2
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pro SBC Retrofit Stage 3 Hyd. Roller LS Firing Order Cam, 224/232 Dur., 110 LSA + 2 Adv, .550/.540 1.5 Ratio, .587.576 1.6 Ratio, 2000-6300 RPM Range
Part Number: SUM-1223
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Floor Jack, Hydraulic, 2 ton, Aluminum, Blue/Silver, 3.5 in. Minimum Lift Height, 20.0 in. Maximum Lift Height, Each
Part Number: SUM-917072
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Camshaft, 09-21 5.7 Dodge RAM, replaces 53022314AD, VVT but no MDS, 252/271 Advertised Duration, 0.539/0.493 Lift, Dodge, Ram, Each
Part Number: SUM-5701
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Headers, Long Tube, Steel, Ceramic Coated, Pontiac, 326-455, D-Port, Pair
Part Number: SUM-G9120
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Cab Visor, Sportvisor, Lighted, Fiberglass, White Gelcoat, Ford, Pickup, Each
Part Number: SUM-480136
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Flywheel, Billet Steel, 168-Tooth, 30 lb., Internal Engine Balance, Chevy, Big, Small Block, Each
Part Number: SUM-700180
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Radiator, Classic OEM, Crossflow, Copper/Brass, Black, 4-row, Chevy, Corvette, Each
Part Number: SUM-382019
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Wheelie Bars, Dual, Bolt On, Unsprung, 44 in. Long, Chrome Finish, Rubber Wheels, Kit
Part Number: SUM-791040
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Axles, Direct Fit, 1541H Steel, 30-Spline, Chevy, 8.875 in., Kit
Part Number: SUM-700120
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster