Availability
Combo, Oil Pan, Black Zinc, Pickup, High-Volume Pump, Shaft, Tray, Scraper, Gaskets, Chevy, Small Block, Kit
Part Number: SUM-PANKIT2
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Pro LS Truck Torkinator. 200/205 Dur., 113+4, .550/.550 Lift, 3-bolt, 4.8 5.3 5.7 6.0 6.2, 7.0 Vortec, L59 LR4 LM7 L33 LS2 L92 L96 LY6 LQ4 LQ9 , Each
Part Number: SUM-8727R1
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Rocker Arms, Pedestal Mount, Full Roller, Aluminum, 1.7 Ratio, Chevy, LS, Set of 16
Part Number: SUM-G6980
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Pro SBC Retrofit Stage 2 Hyd.Roller LS Firing Order Cam, 218/227 Dur., 110 LSA + 1 Adv, .525/.520 1.5 Ratio, .560/.555 1.6 Ratio, 1800-6250 RPM Range
Part Number: SUM-1222
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Summit Factory Performance Stage 2 LS Cam, 227/239 108 L/S, .551/.551 Lift, Vortec LS1 LS2 LS6 LS3 LS7 LQ4 LQ9, Summit's version of Factory Stage 2
Part Number: SUM-8704
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Pro SBC Retrofit Stage 4 Hyd.Roller LS Firing Order Cam, 232/242 Dur., 110 LSA + 3 Adv, .550/.550 1.5 Ratio, .587/.587 1.6 Ratio, 2200-6400 RPM Range
Part Number: SUM-1224
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Oil Pan, Steel, Black Zinc, 11 qt., Chevy, Big Block, Each
Part Number: SUM-G3607
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Oil Pan, Steel, Black Zinc, 6 qt., Chevy, Big Block, Each
Part Number: SUM-G3604
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Crankshaft, 2-Piece Seal, External Balance, Cast Steel, 4.000 in. Stroke, Chevy, 454, Each
Part Number: SUM-180370
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Summit Factory Performance Stage 3 LS Single Plane Cam, 236/246 110 +0 .612/.612 Lift, LS1 LS2 LS6 LS3 LQ9, Summit's version of Factory LSX 454 cam
Part Number: SUM-8702
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 277/287, Lift .502/.501, Chevy, Big Block, Kit
Part Number: SUM-K1301
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Valve Cover Set, LS Race, Lightweight Die Cast Aluminum, With Coil Mounts, Black Powdercoat, Pair
Part Number: SUM-440821
Not Yet Reviewed
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Pro SBC Retrofit Stage 5 Hyd. Roller LS Firing Order Cam, 242/252 Dur., 110 LSA + 4 Adv, .550/.550 1.5 Ratio, .587/.587 1.6 Ratio, 2600-6600 RPM Range
Part Number: SUM-1225
Not Yet Reviewed
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Cam and Lifter kit, Summit B303 Plus Hyd. Roller Cam, 224/232 Duration, 114 LSA + 3 Adv, .550/.540 1.6 Ratio, 2800-6300 Range, '85-1996 Roller Block
Part Number: SUM-K8901
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 288/298, Lift .444/.466, Pontiac, V8, Kit
Part Number: SUM-K2801
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Crankshaft, Remanufactured, Nodular Iron, 3.622 in. Stroke, 0.010 Undersize Bearing Required, 24-Tooth Reluctor, Chevy, LS, Each
Part Number: SUM-180362
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Cam and Lifter kit, Camshaft, Stage 2, LS Truck Swap Cam, High lift version, 218/227 112+2, .600/.600 Lift, 3-bolt, LS1 LS2 LS6 LS3 LQ4 LY6 LQ9 Each
Part Number: SUM-K8720R1
Not Yet Reviewed
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Stage 3 Pro LS Twin-Turbo Cam. 234/238 Dur., 115+5, .625/.605 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck, LS1 LS2 LS6 LS3 LS7 LQ4 LQ9, Each
Part Number: SUM-8722R1
Not Yet Reviewed
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 276/276, Lift .533/.533, Ford, 352-428 FE, Kit
Part Number: SUM-K34052
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Pro SBC Retrofit Stage 1 Hyd. Roller LS Firing Order Cam, 212/218 Dur., 110 LSA + 2 Adv, .525/.520 1.5 Ratio, .560/.555 1.6 Ratio, 1500-6000 Range
Part Number: SUM-1221
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 274/274, Lift .485/.485, Ford, Small Block, Kit
Part Number: SUM-K30052
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Oil Pan, Steel, Black Zinc, 6 qt., Chevy, Small Block, Each
Part Number: SUM-G3602
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Pistons, Forged Aluminum, Flat, 3.800 in. Bore, 1.304 in. Compression Height, 0.927 in. Pin, Chevy, LS, Set of 8
Part Number: SUM-17401C-20
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 303/303, Lift .488/.488, Chevy, Small Block, Kit
Part Number: SUM-K1106
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Rocker Arms, Stud Mount, Full Roller, Aluminum, 1.5 Ratio, Fits 3/8 in. Stud, Chevy, Small Block, Set of 16
Part Number: SUM-G6910B
Estimated Ship Date: Monday 11/10/2025
Estimated Ship Date: Monday 11/10/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.