Availability
Summit Racing Engines & Components
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, Advertised Duration 278/287, Lift .523/.524, Chevy GM, LS/LSX, Gen III/IV, LS, Kit
Part Number: SUM-8701-1
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Forged Pro Small Block Chevy 4340 Forged Steel I-Beam Connecting Rod, 6 in. Length, .927 Floating Pin, 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-180SBC6000I
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Crankshaft, 2-Piece Seal, External Balance, Cast Steel, 4.000 in. Stroke, Chevy, 454, Each
Part Number: SUM-180370
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Valve Cover Set, LS Race, Lightweight Die Cast Aluminum, With Coil Mounts, Black Powdercoat, Pair
Part Number: SUM-440821
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pro SBC Retrofit Stage 5 Hyd. Roller LS Firing Order Cam, 242/252 Dur., 110 LSA + 4 Adv, .550/.550 1.5 Ratio, .587/.587 1.6 Ratio, 2600-6600 RPM Range
Part Number: SUM-1225
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 276/276, Lift .533/.533, Ford, 352-428 FE, Kit
Part Number: SUM-K34052
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 288/298, Lift .444/.466, Pontiac, V8, Kit
Part Number: SUM-K2801
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Summit Factory Performance Stage 1 LS Circle Track Cam, 225/236 110+1, .525/.525 Lift, Vortec LS1 LS2 LS6 LS3 LQ4, Summit's version of the ASA Cam
Part Number: SUM-8700
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Stage 3 Pro LS Cam - Extra Valve Clearance Version, 230/242 113+3, .625/.605 Lift, Excellent power and torque, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0L
Part Number: SUM-8710R1
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Crankshaft, 1-Piece Seal, External Balance, Cast Steel, 3.750 in. Stroke, Chevy, 350 main, 383 stroker, Each
Part Number: SUM-180368
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 278/288, Lift .421/.444, Chrysler, Small Block
Part Number: SUM-K6900
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Oil Pan, Steel, Black Zinc, 6 qt., Chevy, Small Block, Each
Part Number: SUM-G3603
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Cylinder Head Studs, 12-Point, 8740 Chromoly, Black, 2004 and Later, Chevy, LS, Gen III/IV, 1/2" x 13 threads base, 1/2" - 20 top, Kit
Part Number: SUM-900508
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Forged Pro Mopar SB 4340 Forged Steel I-Beam Connecting Rod, 6.123 in. Length, .984 Floating Pin, 8740 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-MOP61238I
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Stage 4 Pro LS Truck Swap Cam, 226/230 112+4, .550 /.550 Lift, 3-bolt, Chevy, LS, Each
Part Number: SUM-8714R1
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 298/298, Lift .466/.466, Chevy, Small Block, Kit
Part Number: SUM-K1104
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
PRO BBC H.R. 5 Hydraulic Roller Cam, 4/7 Swap, 232/242 Duration @ .050, 111 LSA + 6 Adv. , .620/.620 with 1.7 ratio, .656/.656 with 1.8, 3000-6500
Part Number: SUM-1255
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Rocker Arms, Stud Mount, Full Roller, Aluminum, 1.6 Ratio, Fits 7/16 in. Stud, Chevy, Small Block, Set of 16
Part Number: SUM-G6921B
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 280/290, Lift .449/.473, Ford, 5.0L H.O., 351W
Part Number: SUM-K4400
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Stage 1 Pro LS Ghost Cam. 222/234 115+3, .600/.575 Lift, Ultimate Stealth Cam, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck LS1 LS3 LS7 LS9 LQ4 LQ9 LM7
Part Number: SUM-8715R1
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, Advertised Duration 261/269, Lift .550/.550, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8719-1
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pistons, Forged Aluminum, Flat, 3.810 in. Bore, 1.331 in. Compression Height, 0.945 in. Pin, Chevy, LS, Set of 8
Part Number: SUM-17400C-30
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Oil Pan, Steel, Black Zinc, 11 qt., Chevy, Big Block, Each
Part Number: SUM-G3607
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Camshaft, 09-21 Challenger Charger Durango Citadel, Jeep, replaces MDS 53022372AA with VVT only, 244/269 Advertised Duration, 0.515/0.502 Lift, Each
Part Number: SUM-5702
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pro SBC Retrofit Stage 1 Hyd. Roller LS Firing Order Cam, 212/218 Dur., 110 LSA + 2 Adv, .525/.520 1.5 Ratio, .560/.555 1.6 Ratio, 1500-6000 Range
Part Number: SUM-1221
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster