Availability
Summit Racing Parts and Accessories
Surface Cleaner, Degreaser, 1 Gallon, Each
Part Number: SUM-SWSS100G-12
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Oil Pickup, Screw-In, Street/Strip Pan Style, 3/8 in. NPT, 5.000 in. Pan Depth, 3/4 in. Tube Dia., Mopar, 383, 440, Each
Part Number: SUM-G3508
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Gaskets, Intake, Cellulose, Nitrile, 2.13 in. x 1.25 in. Port, .060 in. Thick, Ford, 302/351W, Set
Part Number: SUM-G2421
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Spending time in the garage working on your Chevy is a joy, so why not add a great looking tee supporting...
$22.99
—
$27.99
Fuel Filter, Inline Mount, Aluminum, Clear, 40 Microns, -6 AN Male Inlet/Outlet, Each
Part Number: SUM-230103
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Oxygen Sensor Extension Harness, 4 Wire, Flat, 24 in. Long, Early LS1, LS6, LT1, Pair
Part Number: SUM-890132
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Exhaust Tubing, Mandrel Bend, 3.00 in. Diameter, 60 Degrees, 16-Gauge, 409 Stainless Steel, 5.0 in. Bend Radius, Each
Part Number: SUM-622145-409
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
HEI Distributor Upgrade Kit, Coil, Cap, Rotor, 48,000 V, Black, Chevy, GM, Kit
Part Number: SUM-850723
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Ignition Coil, Ford Mod Motor Coil-On-Plug, 40,000 V, Epoxy, Female/Socket, Red, Ford, Modular, 2-Valve, Each
Part Number: SUM-850570-1R
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Exhaust Tubing, Mandrel Bend, 90 Degrees, Steel, Aluminized, 2.50 in. Diameter, 16-Gauge, Each
Part Number: SUM-623045
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Automatic Transmission Kickdown Cable, Braided Stainless Steel Jacket, Carburetor, Ford, C-6, Kit
Part Number: SUM-200039
Estimated Ship Date: Mar 9, 2026 if ordered today
Estimated Ship Date: Mar 9, 2026 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Engine Oil Dipstick, LS Cast Retro Pan, Billet Aluminum Handle, Chrome, Steel Tube with Braided Dipstick,Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-122241
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Timing Chain and Gear Set, Standard, Link Belt, Steel Sprockets, Chevy, 305/350, 5.0L/5.7L, Set
Part Number: SUM-G6503
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Muffler, 2-Chamber Performance, Oval, 2.25 in. Offset Inlet, 2.25 in. Center Outlet, Steel, Aluminized/Black
Part Number: SUM-630180
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Hand Tool Sets, 123-Piece Tool Sets, Sockets, Socket Drive, Combination Wrenches, Screwdrivers, Plastic Toolbox, Kit
Part Number: SUM-901150
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Exhaust Tip, Stainless, Polished, Slant/Rolled Edge, 2.50 in. Inlet, 3.50 in. Outlet, 18 in. Long, Each
Part Number: SUM-690056-1
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Collector Gaskets, Copper, 3-Hole, 2.50 in. Inside Diameter with Hardware, Kit
Part Number: SUM-610125
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Automatic Transmission Gasket Kit, Basic, O-Rings, Seals, GM, Powerglide, Kit
Part Number: SUM-705002-PRK
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Shock/Strut, Monotube, Adjustable, Rear, Chevy, Pontiac, RWD, Each
Part Number: SUM-G7701
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Crankshaft Pulley, V-Belt, 1-Groove, 6.6 in., Aluminum, Natural, Chevy, Small Block, Short Pump, Each
Part Number: SUM-G3961
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Jackstand Organizer, Rack, or Holder, Wall Mount, Single Pair Organizer, ( holds 2 Jackstands) , 28 in., Steel, Black Powdercoated, Each
Part Number: SUM-918016-2
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Sandpaper Discs, Hook and Loop, 6 in. Diameter, Aluminum Oxide, 80 Grit, Set of 50
Part Number: SUM-AB747F6GP80
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Exhaust Flange, 2-bolt, 4.150 in. Bolt Pattern, Stainless Steel, Natural, 3.0 in. Pipe Diameter, Each
Part Number: SUM-626002
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Exhaust Tubing, Mandrel Bend, 2.50 in. Diameter, 60 Degrees, 18-Gauge, 304 Stainless Steel, Polished, 3.50 in. Bend Radius, Each
Part Number: SUM-622144
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Water Pump Pulley, V-Belt, 2-Groove, Steel, Chrome, Chevy, Small Block, Long Pump, Each
Part Number: SUM-G3955
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster