Availability
Automatic Transmission Kickdown Cable, Braided Stainless Steel Jacket, Fuel Injection, Tuned-Port, GM, TH350, Kit
Part Number: SUM-200033
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Automatic Transmission Kickdown Cable, Black Polyethylene Jacket, Fuel Injection, Tuned-Port, GM, TH350, Kit
Part Number: SUM-200033B
Not Yet Reviewed
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Automatic Transmission Kickdown Cable, Braided Stainless Steel Jacket, Fuel Injection, Tuned-Port, GM, 700R4, Kit
Part Number: SUM-200036
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Signs, Mom's Garage Metal Sign, Round, Mom's Garage Genre, "Full Service. Brakes. Tune-Ups. Oil Changes" 12.00 in. Diameter, Each
Part Number: GXP-MOM-2
Not Yet Reviewed
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Carburetor Work Stand, Open Center, Mounting Pegs, Each
Part Number: SUM-G1429
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Cap and Rotor, Black, Male/HEI, Brass Terminals, Clamp-down, GM V8, Kit
Part Number: SUM-G5226BLK
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Engine Run Stand Starter Adapter Plate, Steel, Ford, Small Block, Each
Part Number: SUM-918015-SPF
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Leaf Spring Shackle, Universal, Aluminum, 3/8 in. Thick, 9 in. Overall Length, Each
Part Number: SUM-786055A
Not Yet Reviewed
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Accelerator Pump Discharge Nozzles, Squirters, .035 in., Striaght, Pair
Part Number: SUM-200100
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Are you addicted to boost pressure and boost? If the answer is yes, then get yourself one of these Summit...
Not Yet Reviewed
$21.99
Pedal Assemblies, Throttle, Oval, Steel, Chrome, Rubber Inserts, Firewall Mount, Each
Part Number: SUM-400018
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Cap and Rotor, Black, Male/HEI, Brass Terminals, Clamp-Down, Summit, Mopar, V8, Kit
Part Number: SUM-G5239
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Cap and Rotor, Blue, Male/HEI, Brass Terminals, Clamp-Down, Ford, 5.0, 5.8L, Kit
Part Number: SUM-G5227
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Cap and Rotor, Blue, Female/Socket, Brass Terminals, Clamp-Down, Ford, V8, Kit
Part Number: SUM-G5208
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Cap and Rotor, Blue, Male/HEI, Brass Terminals, Screw-Down, Dodge, 5.2, 5.9L, Kit
Part Number: SUM-G5233
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Engine Run Stand Starter Adapter Plate, Steel, Chysler, Dodge, Ram, Jeep, Plymouth, Each
Part Number: SUM-918015-SPM
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Cap and Rotor, Black, Female/Socket, Brass Terminals, Clamp-Down, AMC, GM, V8, Kit
Part Number: SUM-G5223BK
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Cap and Rotor, Maroon, Female/Socket, Brass Terminals, Clamp-Down, AMC, GM, V8, Kit
Part Number: SUM-G5223
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Cap and Rotor, Blue, Male/HEI, Brass Terminals, Screw Down, Jeep, 4.0L, Kit
Part Number: SUM-G5230
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Data Cable and Power Supply, Flash Programmer, DB9 Male to USB, 1 ft. Length, Kit
Part Number: SUM-897778
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Cap and Rotor, Black, Male/HEI, Brass Terminals, Screw-Down, Summit, V8, Kit
Part Number: SUM-G5246
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Cap and Rotor, Tan, Female/Socket, Brass Terminals, Clamp-Down, Mopar, Summit, V8, Kit
Part Number: SUM-G5244
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Cap and Rotor, Blue, Male/HEI, Brass Terminals, Screw-Down, Chevy, 5.0, 5.7, 7.4L, Kit
Part Number: SUM-G5224
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Cap and Rotor, Blue, Female/Socket, Brass Terminals, Clamp-Down, Chrysler, Dodge, Plymouth, 5.2, 5.9L.Kit
Part Number: SUM-G5232
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Muffler, Welded, 2 1/4 in. Inlet/2 1/4 in. Outlet, Steel, Aluminized, Each
Part Number: SUM-633221
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Estimated Ship Date: Monday 11/9/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster